Keywords |
장기변형; 동바리; 거푸집; 동바리 재설치; 시공단계; 축력 재분배; long-term deformation; shore; form; reshoring; construction sequence; redistribution of axial force |
Abstract |
To apply the research results to the design and the construction of the high rise buildings, long-term behavior of reinforced concrete structure have been widely studied. However, shoring and reshoring at early ages have not been considered in the most of studies. The removal of forms and shores has been dealt with one construction sequence. i.e. the deformation occurred at the early age before the removal of shore has been neglected. In this paper, two-dimensional frame analysis program for long-term behavior of reinforced concrete was developed. In the developed program, construction sequence including the settlement and the removal of shores is considered to predict axial force variation due to forms ,shores, and time-dependent concrete stiffness. Analysis results show that the time-dependent axial force of shores is reduced, and the redistributed axial force of the interior column is greater than the value by elastic analysis and that of the exterior column is smaller. In order to demonstrate the validity of this program, the test frame was constructed in sequence of the placement of concrete, form removal, reshoring, shore removal, and the application of additional load. The proposed program predicts experimental results well.
|