Title |
Transportation Engineering, Highway Engineering, Construction Management, Regional and Urban Planning, Railroad Engineering, Surveying and Geo-Spatial Information Engineering : Transportation Engineering ; A Study of Warrant for Staggered Pedestrian Cross |
Keywords |
staggered pedestrian crossings ; pedestrian ; delay ; split ; 2단 횡단보도 ; 횡단보도 ; 보행자 ; 지체 ; 시간분할 |