Mobile QR Code QR CODE : Journal of the Korean Society of Civil Engineers
Title A Case Study of Delay Analysis for E.P.B Shield TBM Method in Construction Site
Authors 곽준환 ; 박형근
Page pp.737-743
ISSN 10156348
Keywords shield TBM;initial digging through;trouble;FMEA;초기굴진;트러블
Abstract Shield TBM, since it was employed for Suyoungman Bay riverbed tunnel of Busan Subway in 2000, has been increasingly adopted in Korea, and in line with growing popularity, the study on Shield TBM has been expanded. However the studies mostly focus on ground condition in a bid to estimate the advancement rate and develop the model for calculating the excavation efficiency, whereas the efforts to analyze the cause of delay and to develop the improvement measures have been neglected. Thus the studies were mostly intended to analyze the schedule slippage focusing on ground conditions, while the study on schedule behind due to equipment itself and related facilities have yet to be attempted in earnest. This study hence was aimed at evaluating the troubles and schedule slippage caused by mechanical elements such as shield TBM equipment and tools and ground conditions, making use of FMEA approach so as to analyze the risk of schedule delay by such elements, thereby proposing the preventive measures to deal with high-risk factors. So, this study suggest the solution to highly ranked trouble factor for the purpose of enhance the efficiency on Shield TBM.