Title |
Coupled Operation of the Lake Youngsan, Yeongam and Kumho for the Flood Stage Control in the Downstream of the Youngsan River |
Keywords |
lake youngsan;lake yeongam;lake kumho;lock gate;connecting channel;coupled operation;영산호;영암호;금호호;배수갑문;연락수로;연계운영 |
Abstract |
To examine how the width of connecting channels, the width of the Kumho lock gate, and the opening/shutting criteria of the Yeongam connecting channel lock gate affect the flood stage of Lake Yeongsan, Lake Yeongam, and Lake Kumho, located in the lower reaches of the Yeongsan River, unsteady flood routing was performed by connecting the three lakes into a single interlinked system. The coupled operation of the three lakes was found to have little effect when the widths of the lock gates and the Yeongam and Kumho connecting channels are set at the current level. The most effective way to lower the water level in Lake Yeongsan was to widen the Yeongam connecting channel, but this caused the water level in Lake Yeongam to rise. To lower the increased water level in Lake Yeongam by utilizing the water storage capacity of Lake Kumho, it was necessary to widen both the Kumho lock gate and the Kumho connecting channel. It was found that the optimum opening/shutting criterion for the Yeongam connecting channel lock gate is approximately EL.(+)0.8 m under the simulated conditions used in this study and the criterion allows of maximal lowering of the water levels in Lake Yeongam and Lake Kumho while maintaining a near¬constant water level in Lake Yeongsan. |