Title |
Development of a Risk Management Procedure Model for the Construction Project Using Construction Risk Management System |
Keywords |
risk management;risk analysis;RBS;WBS;리스크관리;리스크분석;리스크분류체계;공사분류체계 |
Abstract |
This study suggested CRMS (construction risk management system) which is a new risk analysis model after analyzing existing risk management process for to guarantee a successful performance at the construction planning and work phase. CRMS is risk management procedures in order that the contractor identify, analyze and administrate the risk during performing construction project. This model may give much help to quantify and be ready the right managing methods about identified risk by the contractor. Especially, the most important and difficult things of all risk management may be to identify risk in the project. This study make more focusing on the developing a procedure that can identify risk more easily in the construction project. The risk is divided into global risk and local risk of a project. Also, this study suggests methods which are using the RBS (risk breakdown structure) related with WBS. This result will be useful as basic materials for developing computerizing system for risk management. |