Title |
Performance Evaluation for All-In-One Construction Method of Curbstone and Gutter Using Formwork Rail and Jig |
Keywords |
curbstone;gutter;all-in-one construction;static test;dynamic test;경계석;측구;일체형 시공;정적 시험;동적 시험 |
Abstract |
A road curbstone is a structure installed at the boundary of the sidewalk and the street with the objectives of road drainage, drawing attention and such. The current general construction method of curbstones places foundation concrete for the curbstones first, waits until the concrete reaches the strength to support the curbstones, places the curbstones on top, and then places the gutter and rear filling concrete. Such method has the issues of poor compaction and weakened bond strength of concrete due to split placing of concrete, and causes the curbstones to easily separate due to vehicle impact or earth pressure, in turn creating maintenance costs and spoiling the aesthetics. To improve such conventional construction methods, an all-in-one method was developed using form work rail and jig where both the curbstones and gutter can be worked at the same time, and to evaluate the structural performance, static tests of lateral loading test, pullout test, and bending test were executed, and dynamic tests such as pendulum test and actual vehicle impact test were executed. In all tests, the all-in-one construction method using form work rail and jig was shown to be superior to the conventional construction method by the increase of construction quality and bond strength of concrete. |