Title |
TMDL Evaluation of Nakdong River Basin Using Load Duration Curve and Streamflow-Load Rating Curve |
Keywords |
load duration curve;streamflow-load rating curve;TMDL evaluation;nakdong river;부하지속곡선;유향-부하량 상관곡선;오염총량평가;낙동강 |
Abstract |
The TMDL standard flow as applying watershed management regime uses the average low flow of past 10 years. Moreover, the TMDL implementation assessment has been enforced through management of pollutant load satisfied objective water quality. Even though the present allocation and management through averaged low flow are still convenient, they are not enough to solve ultimate goals of watershed management to keep up recovery of water body. To maintain the same water quality concentration, the standard flow is required to consider total discharge in management plan which helps to keep healthy ecosystem. In view of this, it would be possible to approach reasonable assessment by reflecting variably changeable discharge from precipitation-streamflow relation and the TMDL standard establishment considering artificial regulated flow. Therefore, this study attempts to develop the TMDL method using Load Duration Curve (LDC) and Streamflow-Load Rating Curve (QLRC) considering total discharge and finds drawbacks with solutions as applying on Nakdong river TMDL unit watershed. Finally, this research evaluates possibility of application on pollutant load allocating and implementation assessment in Korea. |