Improvement of Sedimentation Rate in the Settling Basin by Labyrinth Weir |
Authors |
조훈식(Cho, Hun Sik) ; 여창건(Yeo, Chang Geon) ; 임장혁(Im, Janghyuk) ; 이승오(Lee, Seung Oh) |
DOI |
https://doi.org/10.12652/Ksce.2012.32.3B.153 |
Keywords |
침사지;래버린스 위어;확폭비;침전율 settling basin;labyrinth weir;magnification ratio;sedimentation rate |
Abstract |
In this study, we proposed modified settling basins transformed by substituting the downstream sill for low head weirs such as generic labyrinth weir and inclined crest labyrinth weir worked as internal baffles. Laboratory experiments were carried out to understand hydraulic characteristics inside of the settling basin to improve the efficiency of sedimentation rate. For a quantitative analysis, we suggested the headwater ratio($H_t/P$), the magnification ratio(L/W) and the inflow rate per total crest length($q_L$) as primary analysis indexes for sedimentation efficiency. Six different types of settling basin were used for labscaled pilot tests by distinguishing with internal structures. Based on results, the variation of headwater ratio with the change of magnification ratio would highly affect the deposition efficiency(%) and it was improved under specific condition that repeating arrange number(N) of labyrinth weir was between 2 and 4. Also, the regression analysis showed that initial condition and shape for improving sedimentation efficiency were plotted on the graph for both $q_L{\geq}3.5cm^2/s$ and $L/W{\leq}3.5$. It would be expected that the geometrically optimized labyrinth settling basin could be designed with proper deposition efficiency for inflow rates of influent and required area of settling basin utilizing the proposed analysis index in this study. |