Title |
Full-Scale Test on Precast Concrete Arch Bridge with Reinforced Joint and Backfill |
Authors |
정철헌(Chung, Chulhun) ; 주상훈(Joo, Sanghoon) ; 최동찬(Choi, Dongchan) ; 이종윤(Lee, Jongyun) |
DOI |
https://doi.org/10.12652/Ksce.2014.34.2.0389 |
Keywords |
조립식 프리캐스트 콘크리트;석조식 아치교량;루프이음;뒤채움 Precast concrete;Masonry arch bridges;Loop joint;Backfill |
Abstract |
The existing shield tunnel has constructed in the concept of non-drainage uniformly, but the leak has become a problem in the construction and management. The Shield tunnel design allowed for the water and earth pressure bring about the increasing segment thickness and the construction costs. In order to improve these problems, the study of the partial drainage shield tunnel is in progress. In this study, th model experiment was performed to confirm the possibility of the partial drainage shield tunnel. And the water and earth pressure was measured in drainage and undrained condition. Based on the results of model experiments, the effect of water pressure reduction was confirmed by reviewed the structure stability of the real design case. |