Mobile QR Code QR CODE : Journal of the Korean Society of Civil Engineers
Title A Case Study on Elephant Foot Method for Railway Tunneling in Large Fault Zone
Authors 이길용(Lee, Gilyong) ; 오정호(Oh, Jeongho) ; 조계환(Cho, Kyehwan) ; 이두수(Lee, Doosoo)
DOI https://doi.org/10.12652/Ksce.2016.36.6.1161
Page pp.1161-1167
ISSN 10156348
Keywords 우각부보강공;단층대;레그파일 Elephant foot method;Large fault zone;Pile leg reinforcement
Abstract In this study, an attempt was made to conduct a case study on the development of ground expansive displacement due to lack of bearing capacity of original ground in spite of applying reinforcement treatments that intended to enhance the stability of big size high-speed rail tunnel in large fault zone. For the purpose of this, in-situ measurements made in the middle of excavation stage were analyzed in order to characterize ground responses and numerical analysis was performed to evaluate the effectiveness of reinforcement technique such as elephant foot method applied for this site via comparing with field monitoring measurements. In addition, further numerical studies were carried out to investigate the influence of leg pile installation angle and length, which is one of types of elephant foot method. The results revealed that the optimum condition for the leg pile installation is to maintain 45 degree of installation angle along with 6 meter of embedment depth.