Mobile QR Code QR CODE : Journal of the Korean Society of Civil Engineers
Title A Study on the Establishment of Optimal Transportation Networks in Busan New Port
Authors 박호교(Park, Ho-Kyo) ; 최양원(Choi, Yang-Won)
DOI https://doi.org/10.12652/Ksce.2017.37.1.0125
Page pp.125-132
ISSN 10156348
Keywords 부산항 신항;부산항 신항 항만배후단지;교통체계개선;교통수요예측;교통개선효과분석 Busan new port;Busan new port's distripark;Traffic system improvement;Traffic demand forecast;Traffic improvement effect analysis
Abstract The development project of Busan New Port aims to be Logistics Hub Port but there are too many things to deal with ; enlargement of harbour, interport competition, modernization of harbour loading equipment and so on. At present, 23 berths of North and South container quay are in operation and 22 berths will be constructed on west and south-side by 2020. Namely, Busan New Port will operate 45 berths in 2020. When it comes to port distripark, a large-scale of Port distripark project is underway, such as Ung-Dong district 1,2 phase, West container 1,2phase, North distripark and so on. This study is to deduce traffic system problem of Busan New Port which is caused by the development project through predicting traffic need considering the development project. According to study, there are three main problems of traffic system : 1. traffic congestion caused on main crossroad, connecting second harbour back road. 2. It has been predicted that South-North road and traffic capacity of New Port road would lack compared to traffic volume-to-be-increased. Moreover, the detour volume of traffic is caused because New Port's 1st avenue and route 2 were not connected directly. Thus, this study suggests three kinds of improvement plan for smoother traffic flow. 1st. Operate roundabout on major intersection, for example, second harbour back road, west container wharf's subway corridors(South to North), and permit only right turn on sub-intersection. 2nd. Extend New Port road(North container's port road) by utilizing side walk and median. 3rd. Install exit ramp which utilizes Route 2 connecting New Port's 1st avenue and local road 1042. The method we used to analyze the effect of improvement is Vissim of Mircro Simulation Package.