Title Development of Progress Measurement Framework for Mega Construction Project
Authors 고성진(Ko, Sungjin) ; 지석호(Chi, Seokho) ; 김진우(Kim, Jinwoo) ; 송준호(Song, Junho)
DOI https://doi.org/10.12652/Ksce.2017.37.2.0419
Page pp.419-425
ISSN 10156348
Keywords 대규모 건설프로젝트;프로젝트관리;진도율 측정;작업분류체계 Mega construction project;Project management;Progress measurement;Work breakdown structure
Abstract Managing mega construction project is a very challenging task due to its large scale and complexity. To deal with the challenge, progress measurement must be estimated reliably and effectively. Many researchers have presented progress measurement methods, but previous studies are limited to single or several types of facilities. Thus, they have difficulties to being applied to mega construction projects that covers multiple facilities. To overcome the limitations, this paper proposes a progress measurement framework considering characteristics of mega construction projects. The framework consists of four phases : development of Work Breakdown Structure, determination of weights of main facilities and sub facilities, and calculation of the integrated progress rate. To validate the proposed approach, a case study of Sejong city in Korea was performed. The results of the case study showed the applicability of the proposed framework and confirmed that it enables to reliably measure progress rate of mega construction projects.