Mobile QR Code QR CODE : Journal of the Korean Society of Civil Engineers
Title PAZ-based Parking Supply and Operation Planning Model Considering Land Use
Authors 유정훈(Yu, Jeong Whon) ; 허겸(Hur, Kyum) ; 류인곤(Ryu, In Gon) ; 전교석(Jeon, Gyo Seok)
DOI https://doi.org/10.12652/Ksce.2022.42.5.0659
Page pp.659-669
ISSN 10156348
Keywords 주차문제; PAZ (Parking Analysis Zone); 신도시 택지개발지구; 토지이용
Abstract Recently, parking problems have repeatedly occurred not only in the residential areas of the old town, but in detached residential areas, neighborhood living facilities, and commercial areas of the planned New Town. This study suggests a strategy to minimize parking problems before constructing a New Town by reviewing these parking problems at the new city district planning stage. Parking problems can be divided into supply-demand and non-supply-based, and the solution strategy is reviewed in terms of supply and operation. The procedure for applying the solution strategy is proposed according to the effectiveness and ease of application.First, this paper suggests the PAZ (Parking Analysis Zone) as the basic analysis unit. Second, the supply-based parking problem in the concerned area based on the land use plan of Hanam Gyosan is reviewed. Last, solutions to a parking problem for each PAZ are presented.