A Study on a Technique for Simplifying the Connection of a 3D Model and Schedule Information for 4D Simulation |
Authors |
박상미(Park, Sang Mi) ; 이재희(Lee, Jae Hee) ; 윤형석(Yoon, Hyeong Seok) ; 황재영(Hwang, Jae Yoeng) ; 강효정(Kang, Hyo Jeong) ; 강인석(Kang, Leen Seok) |
DOI |
https://doi.org/10.12652/Ksce.2022.42.6.0861 |
Keywords |
4D 모델; 공정표; BIM; 공정관리 4D model; Schedule chart; BIM; Schedule management |
Abstract |
A key use of applying building information modeling (BIM) to the construction stage of a project is to help identify construction obstacles and to visualize construction status according to the progress of the construction schedule. When employing 4D simulationfor this purpose, start and finish dates for each activity and a 3D model of the activity must be prepared. In this work, in order to simplify the configuration of a 4D model, minimum attribute information of the BIM model produced in the design stage was used to constructa system that generated activity information in the construction stage using a clustering algorithm. Its usefulness as actual schedule management information was then analyzed. |