Title |
Determination of Important Parameter Control Term for Paldang Lake Water Quality Management using Load Duration Curves |
Authors |
김동우 ( Dong Woo Kim ) ; 장미정 ( Mi Jeong Jang ) ; 박지형 ( Ji Hyoung Park ) ; 한인섭 ( Ihn Sup Han ) |
Keywords |
Focused control; Land use; Load duration curve; Number of excess; Paldang lake |
Abstract |
Load duration curve was applied to determine important water quality parameter control term for improvement of Paldang lake water quality. Load duration curve was analyzed with long term data from 1985 to 2012 including water quality, flow rate and climate state of Paldang water environment. From the result of flow rate patterns of paldang lake, differences between high and low flow rate of each year showed tendency of increase because rainfall characteristics of paldang lake watershed were changed by climate exchange. Both of land use state of upper Paldang lake watershed and number of limit excess from load duration curve indicated that seasonal action related with land use such as agricultural fertilizer distribution in upper watershed affected paldang lake water quality. So focused BOD (biological oxygen demand) management during spring season from march to June is required to control organic materials in Paldand lake. The main affecting factor of TOC (total organic carbon) increase in Paldang lake was initial rainfall after march. T-N (total nitrogen) kept increasing during research period, so enhancement of T-N standard is need to T-N control. Initial rainfall and increase of temperature during spring season from March to June showed a positive correlation with TP (total phosphorus) and Ch1-a, respectively. |