Title |
A Study on the Improvement Method on Calculating the Damages Caused by the Bid Rigging in the Construction Work |
Authors |
민병욱(Min, Byeong-Uk) ; 박형근(Park, Hyung-Keun) |
DOI |
https://doi.org/10.12652/Ksce.2017.37.6.1053 |
Keywords |
입찰담합;손해액 산정방법;가상 경쟁가격;손해액 결정 표준절차 Bid rigging;Damage calculation method;Virtual competition price;Damages determination standard procedures |
Abstract |
The study is concerned with providing the improvement method on making a reasonable and scientific decision on the damages accrued from the bid rigging in the construction work. According to the review on the precedent studies and decision cases on the damages caused by bid rigging, the representative problems include the insufficiency of the classification system on the damage calculation method and the omission of the necessary stage in the damage determination process. First, the improved classification system on calculating the damages caused by bid rigging is presented with the application to the bid rigging in the construction work by adding the ratio factor in addition to the damage calculation parameters such as price and cost. Second, the standard procedures organized with six stages is presented as the process required for determining the damages if the indemnification for bid rigging is claimed. The study becomes the foundation for resolving the problem with the undue burden on a party and for preventing the opportunity loss by resolving a dispute early through the improvement classification system and standard procedures presented in the study. |