Title |
Development of the Qualitative Model for Post Construction Evaluation |
Authors |
이규선(Lee, Kyu-Sun) ; 박희성(Park, Hee-Sung) |
DOI |
https://doi.org/10.12652/Ksce.2018.38.5.0733 |
Keywords |
사후평가;정성평가;건설사업;설문 Post evaluation;Qualitative evaluation;Construction project;Survey |
Abstract |
Various public construction projects have been performed for public welfare and appropriate evaluation of the effectiveness and efficiency has been required. In accordance with legislation of a post construction project evaluation in Construction Technology Promotion Act, all construction projects that exceed 30 billion won in budget are required to perform post evaluation. Korean Government provides post construction evaluation manual that includes both quantitative and qualitative criteria. However, it only provides general concepts and procedures not but detail guidelines for different construction project types and characteristics. Therefore, this paper developed a standard format for qualitative evaluation using survey through analyzing previous cases and research. As a result, the developed standard for survey can be applied for most civil and architectural facilities. However, it will need further research regarding establishment of detailed evaluation criteria for each type of facilities and data storage system for feedback. |