(Gisung Choi)
μ΅κΈ°μ±1β
(Seokhyun Kim)
κΉμν2
(Nakseok Kim)
κΉλμ3
-
κ²½κΈ°λνκ΅ μΌλ°λνμ λμλ°©μ¬κ³΅νμ 곡 λ°μ¬κ³Όμ
(Kyonggi University)
-
κ²½κΈ°λνκ΅ κ³΅νλνμ ν λͺ©κ³΅νμ 곡 μμ¬κ³Όμ
(Kyonggi University)
-
κ²½κΈ°λνκ΅ μ°½μ곡과λν ν λͺ©κ³΅νκ³Ό κ΅μ
(Kyonggi University)
Key words (Korean)
μ μ λμ± λͺ°νν κ·ΈλΌμ°ν
, μλνκ·ΈλΌμ°ν
, μ μ©μ±, μ§νμ μ μΆ, ν 립μ μ μΆ, λΆλ±μΉ¨ν
Key words
Low-flow mortar grouting, Auto grouting, Applications, Ground-water outflow, Outflow of soil-particulate, Unequal settlement
-
1. μ λ‘
-
2. κ°μ λ μ μ λμ± λͺ°νν κ·ΈλΌμ°ν
곡λ²
-
3. κ°μ λ μ μ λμ± λͺ°νν κ·ΈλΌμ°ν
곡λ²μ νμ₯μ μ© λ° κ²μ¦
-
3.1 νμ₯νν©
-
3.2 κ·ΈλΌμ°ν
κ³ν
-
3.3 κ·ΈλΌμ°ν
μ€κ³ λ° κ΄λ¦¬κΈ°μ€
-
3.4 κ³ μ쑰건 μλΉκ·ΈλΌμ°ν
μνμ μν κ·ΈλΌμ°ν
μ곡쑰건 κ²°μ
-
3.5 μλν κ·ΈλΌμ°ν
μμ€ν
μ μ μ©ν μ£Όμ
μ곡
-
3.6 μ£Όμ
ν¨κ³Ό λΆμ λ° νκ°
-
4. κ²° λ‘
1. μ λ‘
μΌλ°μ μΌλ‘ μ μ λμ± λͺ°νν μ£Όμ
곡λ²μ μ¬λΌν 10 cm μ΄νμ μ μ λμ±μ κ°λ λͺ°νν μ£Όμ
곡λ²μΌλ‘ μ£Όμ
μ¬λ£λ₯Ό μ§μ€μ λμ μλ ₯μΌλ‘ μ£Όμ
μ μμΌ μ§λ°λ΄μ
μλ°ν¨κ³Όλ₯Ό ν΅ν 곡극μ μ€μ¬ μ§λ°μ λ°λλ₯Ό μ¦κ°μν€λ©΄μ μ§μ€μ λͺ°νν κ³ κ²°μ²΄ κΈ°λ₯μ νμ±νλ μ§λ°λ³΄κ°κ³΅μ¬λ₯Ό ν΅νμ¬ μΉ¨νλ°©μ§ λ° κΈ°μ΄λ³΄κ° λ± λλ‘,
건물 λ° νλ§ λ± λ§μ κ³³μμ μ§λ°μ μμ μ±μ ν보νλ κΈ°μ μ΄λ€. μ μ λμ± λͺ°νν κ·ΈλΌμ°ν
곡λ²μ 1950λ
μ΄μ λ―Έκ΅μμ κ°λ°λμ΄, 1977λ
λμμ§μ
μ°μ½μ§λ° ν°λκ΅΄μ°©μ λ°λ₯Έ μ§λ°μ μ΄μ λ° μΉ¨νλ°©μ§λ₯Ό μνμ¬ μ μ©λ μ΄λ λκ·λͺ¨ νλνΈ λΆμ§μ μ§λ°κ°λ λ° λ³΄κ° κ·Έλ¦¬κ³ λΆλ±μΉ¨νλ ꡬ쑰물μ μμ볡ꡬ
λ±μ μν μ ν¨ν 곡λ²μΌλ‘ μ€μ©ν λμ΄ μλ€(Chun et al., 2000).
00κ΅°μμ λ°μ£Όν 00κ³ κ°μ§κ΅¬ κΈκ²½μ¬μ§ λΆκ΄΄ μνμ§μμ μ§λ°νλΆμ ν 립μ μ μΆλ‘ μΈν μ§λ° μΉ¨νλ₯Ό λ°©μ§νκ³ μμ±μ ν보νκΈ° μνμ¬ μ μ λμ± λ«ν κ·ΈλΌμ°ν
곡λ²μ΄ μ±νλμλ€. κ·Έλ¬λ, μ μ λμ± λͺ°νν κ·ΈλΌμ°ν
μ£Όμ
μ λμ μλ ₯μΌλ‘ μΈν μ§λ° νκ΄΄, λλ‘ μΉ¨ν, λΉνλ©΄ λΆκ΄΄ λ° μ£Όμ
μ¬ μ΄ν νΌν΄κ° λ°μν
κ°λ₯μ±μ΄ μλ€(Hankook Geotech, 2019). μκΈ°μ κ°μ λ¬Έμ μ μ ν¨κ³Όμ μΌλ‘ ν΄κ²°νκΈ° μνμ¬, λ³Έ μ°κ΅¬μμλ μ μ λμ± λͺ°νν κ·ΈλΌμ°ν
μ£Όμ
μ μ§λ°μ μ£Όμ
μλ ₯μ μμ νκ² μ μ΄ κ΄λ¦¬ ν μ
μλ μλν κ·ΈλΌμ°ν
μμ€ν
(AGS; Automatic Grouting System)μ κΈ°λ°μΌλ‘ ν μ μ λμ± λͺ°νν κ·ΈλΌμ°ν
곡λ²μΌλ‘ κ°μ νμλ€.
Ahn(2018)μ μνλ©΄ μλν κ·ΈλΌμ°ν
μ₯λΉμ μ μ©μΌλ‘ λͺ¨λ λ°μ΄ν°κ° μꡬν κΈ°λ‘ λ° λ³΄μ μ ν μ μμ΄ μΈ‘μ λ λ°μ΄ν°μ λν μ λ°ν λΆμμ ν΅ν΄ κ·ΈλΌμ°ν
νμ§κ΄λ¦¬λ₯Ό
ν₯μν μ μμΌλ©° μλν κ·ΈλΌμ°ν
μ₯λΉ μ¬μ© μ무 νλκ° νμνλ€κ³ νμλ€. λν, Nam(2015)μ λ°λ₯΄λ©΄ μμ§κΉμ§ 건μ€νμ₯μμ λ²μ©μ μΌλ‘ μ μ©λκ³ μλ κΈ°μ‘΄ κ·ΈλΌμ°ν
κΈ°μ μ λ¨μν μλ ₯μ κ°ν΄μ μ±μ λ£κΈ°λ§ νλ©΄ λλ λ¨μν 곡μ μΌλ‘ μΈμλμ΄
μ곡 μ€ μ μ ν νμ§κ΄λ¦¬κ° λμ§λͺ»νμ¬ μ§λ°ν¨λͺ° λ±μ΄ λ°μνμ λλ μμΈ κ·λͺ
μ΄ μ½μ§ μμ μ±
μμμ¬ νμ
μ΄ μ΄λ €μ΄ λ¬Έμ μ μ΄ μμ΄ μλν κ·ΈλΌμ°ν
μ₯λΉμ
νμμ±μ μΈκΈνμλ€.
λ³Έ μ°κ΅¬μ μ£Όμ λͺ©μ μ μλν κ·ΈλΌμ°ν
μμ€ν
μ μ΅ν©ν κ°μ λ μ μ λμ± λͺ°νν κ·ΈλΌμ°ν
곡λ²μ νμ₯ μ μ©μ± κ²μ¦μ ν΅ν΄ κΈκ²½μ¬μ§ λλ‘μ λΆκ΄΄λ°©μ§ λ°
ν 립μ μ μΆλ°©μ§ λ±μΌλ‘ μΈν μμ μ±μ ν보ν λΏλ§ μλλΌ, μ μ λμ± λͺ°νν κ·ΈλΌμ°ν
곡λ²μ μ μ©λλ λͺ¨λ μ§λ°λ³΄κ°κ·ΈλΌμ°ν
곡μ¬μ νλ μ μ© ν μ μλ
κΈ°νμ λ§λ ¨νκ³ μ νλ€.
2. κ°μ λ μ μ λμ± λͺ°νν κ·ΈλΌμ°ν
곡λ²
κΈ°μ‘΄ μ μ λμ± λͺ°νν κ·ΈλΌμ°ν
곡λ²μ κ²½μ° μ곡 μ€ μ£Όμ
μλ ₯μ λνμ¬ μλ λ‘κ·Έ μλ ₯ κ²μ΄μ§λ₯Ό μμΉλ₯Ό μμ
μκ° νμΈν΄μΌ λλ©°, μ곡μ λν νμ§κ΄λ¦¬κ°
μμ
μμ κ²½νμ λ§μ΄ μμ‘΄νμλ€. λμ μλ ₯μΌλ‘ μ곡λλ μλ° κ·ΈλΌμ°ν
κ³΅μ¬ μ€ μ§λ° μ΅κΈ°, μμνμ λ° μ£Όμ
μ¬ μ μΆ λ± λ¬Έμ μ μ λνμ¬ μλν κ·ΈλΌμ°ν
μμ€ν
μ μ μ©ν¨μΌλ‘μ μ΄μ λν κ΄λ¦¬κ° κ²½νμ μΈ κΈ°μ€μμ μ λμ μΈ μμΉ κ΄λ¦¬λ‘ μ νλμλ€. λν, μ£Όμ
λμ λν μ μ λμ± λͺ°ν μ£Όμ
ννμ νΌμ€ν€
νμλ‘ μΈ‘μ νμ¬ κ°μ μ μΌλ‘ κΈ°λ‘ν μ£Όμ
λμ λν΄μλ μ μμ λκ³λ₯Ό νμ©ν μμΉμ μ νλλ₯Ό λμλ€. Table 1μ μκΈ° μΈκΈν κΈ°μ‘΄κΈ°μ μ λ¬Έμ μ λ±μ
ν¬ν¨ν λ³Έ μ°κ΅¬μμ κ°μ ν μ μ λμ± λͺ°νν κ·ΈλΌμ°ν
κΈ°μ κ³Ό κΈ°μ‘΄ μ μ λμ± λͺ°νν κ·ΈλΌμ°ν
κΈ°μ μ μμΈνκ² λΉκ΅ν κ²μ΄λ€.
Table 1.
Comparison the Improved Technology with a Existing Technology
Comparison
|
The improved technology
|
A existing technology
|
Equipment operating
|
- Automatic operating
|
- Manual operating
|
Injection Pressure
|
- Control by digital type
|
- Control by analog type
|
Injection amount
|
- Electromagnetic flowmeter
|
- Piston counting by pumping
|
Grouting conditions
|
- High-pressure in-site injection test
|
Nothing
|
Injection Management
|
- Real-time feed-back analysis and injection using AGS system
|
Nothing
|
Grouting effect estimation
|
- Field permeability test - Total Core Recovery
- Phenolphthalein reaction test - Unconfined compression test
|
- Tests by specification
|
etc. functions
|
- Auto mixing plant - 4holes injection control
- Auto injection status monitoring - Auto day work reporting
- Auto injection recording
|
- Manual reporting
|
Fig. 1μ κ°μ λ μ μ λμ± λͺ°νν κ·ΈλΌμ°ν
곡λ²μ μ곡λͺ¨μλμ΄λ€. λ³Έ μ°κ΅¬λ κ°μ ν μ μ λμ± λͺ°νν μ£Όμ
곡λ²μ μλν κ·ΈλΌμ°ν
μμ€ν
μ κΈ°λ°μΌλ‘
νΉν, κ³ μ쑰건 μλΉκ·ΈλΌμ°ν
μνμ μν κ·ΈλΌμ°ν
μ곡쑰건 κ²°μ λ°©λ² λ° κ°μ λ μλν μμ€ν
μ μ΄μ©νμ¬ μ€μκ° κ°μ§λ P~q~t μ± νΈ μ ν λΆμμ
ν΅ν κ·ΈλΌμ°ν
μ£Όμ
μ곡기μ λ‘ κ΅¬μ±λλ€. λν, κ°μ λ κΈ°μ μ μ£Όμ
ν¨κ³Όλ₯Ό νκ°νκΈ° μν μ곡 μ β€ν νμ₯ν¬μκ³μ μν λ° μ곡 ν μ½μ νμμ¨ μΈ‘μ
λ° νλννλ μΈμμ½ λ°μμν λ° λ³΄λ§λ μ½μ μνΈμ μ΄μ©ν μΌμΆμμΆκ°λμνμ΄ ν¬ν¨λλ€.
Fig. 1.
Illustration of the Improved Low-Flow Mortar Type Grouting Method
3. κ°μ λ μ μ λμ± λͺ°νν κ·ΈλΌμ°ν
곡λ²μ νμ₯μ μ© λ° κ²μ¦
3.1 νμ₯νν©
λ³Έ μ°κ΅¬λ 00λ 00κ΅°μμ λ°μ£Όν 00κ³ κ°μ§κ΅¬ κΈκ²½μ¬μ§ λΆκ΄΄ μνμ§μ μ λΉκ³΅μ¬μ μΌνμΌλ‘ μ§λ°νλΆμ ν 립μ μ μΆλ‘ μΈν μ§λ° μΉ¨νλ₯Ό λ°©μ§νκ³ μμ μ±μ
ν보νκΈ° μνμ¬ μλ‘κ² κ°μ λ μ μ λμ± λͺ°νν κ·ΈλΌμ°ν
곡λ²μ μ μ©ν μ°κ΅¬λ₯Ό μννμλ€(Fig. 2).
Fig. 2.
Construction Site (Chung-Buk Province)
3.2 κ·ΈλΌμ°ν
κ³ν
κ°μ λ μ μ λμ± λͺ°νν κ·ΈλΌμ°ν
μλν μμ€ν
μ μ μ©ν λ³΄κ° μ¬λλ μ°μμλ¨κΉμ§ κ³ννμμΌλ©° νμ₯ ν¬μμνμ μ€μνμ¬ μμ§λ°μ μ곡쑰건μ κ²ν νμ¬
κ°μ λ μ곡 κΈ°λ²μ λμ
νμ¬ μ£Όμ
μ곡 μ μ§λ°νκ΄΄ μνμ λ―Έμ°μ μ°¨λ¨ ν μ μλ κ·Όκ±°λ₯Ό λ§λ ¨νκ³ μ νμλ€. λ³Έ λ
Όλ¬Έμμμ μν, λΆμ λ° νκ°μλ
10λ² ν, 22λ² ν λ° 40λ² νμ μ£Όλ‘ μ μ©νμλ€(Table 2).
Table 2.
The Grouting Plan of the Construction Section in the Road Site
|
Road construction section
|
Hole number
|
Foundation Field Permeability Test (cm/sec)
|
#10
|
#40
|
113.0 m
|
126
|
4.50Γ10-4 ~ 1.39Γ10-3
|
5.36Γ10-4 ~ 7.19Γ10-3
|
3.3 κ·ΈλΌμ°ν
μ€κ³ λ° κ΄λ¦¬κΈ°μ€
μ μ λμ± λͺ°ν μ£Όμ
μ¬μ μ¬λ£ λ°°ν©κ΅¬μ±μ μλ©νΈ, 쑰골μ¬, μΈκ³¨μ¬ λ° λ¬Όλ‘ κ΅¬μ±λμ΄ μμΌλ©° 쑰골μ¬λ 10 mm μ΄νμ μλΆ λ° μΈκ³¨μ¬λ 4 mm μ΄νμ
λ§μ¬ν λ‘ νμ₯ μλλ°°ν©μ ν΅ν κΈ°μ€κ°λ μ μ§ λ° μ§μ€ λ΄μ κ³νλ ꡬ근μ νμ± ν μ μ¬λ£λ‘ ꡬμ±λλ€. κ³΅λΉ μ£Όμ
λμ μ§λ°μ νΉμ± λ° μ곡λͺ©μ μ λ°λΌ
κ³ννλ©°, μ£Όμ
μ¬λ£λ₯Ό μ§μ€μ λμ μλ ₯μΌλ‘ μ£Όμ
μ μμΌ μ μ§λ°μ μλ°ν¨κ³Όλ₯Ό ν΅ν μ§μ€μ λ°λ μ¦κ°μ λͺ°νν κ³ κ²°μ²΄ κΈ°λ₯ νμ±μ ν΅ν μ§λ°λ³΄κ°μΌλ‘
λΉ νμ₯μ λͺ©ν ꡬ근 μ§κ²½μ 0.8 mλ₯Ό κΈ°μ€μΌλ‘ λ¨μ m λΉ μ μ λμ± λͺ°ν μ£Όμ
λμ 0.5024 m3λ₯Ό κ³ννμλ€(Table 3).
Table 3.
The Optimum Mixing and Grouting Amount Design
Mixing Design ( 1 m3 )
|
Cement
|
Fine Aggregate
|
Coarse Aggregate
|
Water
|
Slump Test
|
Unconfined Compression Test
|
280 kg
|
0.5 m3
|
0.5 m3
|
0.2 m3
|
1~10 cm
|
5 MPa
|
Amount of Injection Design
|
Bulb Size
|
Distance
|
Line
|
Average Depth
|
Injection Volume Per Meter
|
0.8 m
|
1.8 m
|
2
|
8.5 m
|
0.5024 m3
|
νμ₯ μλλ°°ν©νλνΈλ₯Ό νμ©ν νμ₯ μ§μ€μ μ¬κ±΄μ λ°λ₯Έ μ¦κ°μ μΈ λ°°ν©κ΄λ¦¬λμμ΄ κ°λ₯νλ©° λ°°ν©κ΄λ¦¬κΈ°μ€μΌλ‘ λ°°ν©λ λͺ°νν μ£Όμ
μ¬μ μ¬λΌνμΉ μΈ‘μ μ ν΅ν
1~10 cm μ΄λ΄ λ° μ μ λμ± λͺ°ν 곡μ체 μΌμΆμμΆκ°λμνκ³Ό νμ₯ μ곡 ν μ½μ μ±μ·¨λ₯Ό ν΅ν μΌμΆμμΆκ°λκ° 5 MPa μ΄μμ μ§ λ μ μλλ‘ κ΄λ¦¬νμλ€(Fig.
3).
Fig. 3.
The Result of Slump Test and Unconfined Compression Test
3.4 κ³ μ쑰건 μλΉκ·ΈλΌμ°ν
μνμ μν κ·ΈλΌμ°ν
μ곡쑰건 κ²°μ
μΌλ°μ μΌλ‘ μ°μ½ λ° ν μ¬μΈ΅μλ λ¬Όμ μ¬μ©νλ νκ³μ£Όμμν λ°©λ²μ μ΄μ©νμ¬ μ£Όμ
μ§λ°μ μ΅λνμ© μ£Όμ
μλ ₯ λ° μ΅λνμ© μ£Όμ
μλλ₯Ό κ²°μ νλ©° μ΄ λ°©λ²μ μ μ~μ€μ
κ·ΈλΌμ°ν
μμμμ μ μ©μ΄ κ°λ₯νλ€. κ·Έλ¬λ, μ μ λ λͺ°ν κ·ΈλΌμ°ν
μ 50~100 kg/cm2 μ΄λ΄μ λμ μλ ₯μ μ¬μ©νκΈ° λλ¬Έμ λ³Έ μ°κ΅¬μμλ κΈ°μ‘΄ νκ³μ£Όμμν λ°©λ²μ μμ©νμ¬ μ£Όμ
μ¬λ£λ₯Ό μ΄μ©νμ¬ μ²κ³΅λ νμ μλΉ κ·ΈλΌμ°ν
νμμ κ³ μ κ·ΈλΌμ°ν
μ
μ€μνμ¬ μ€μ μ§λ°μμ κ·ΈλΌμ°ν
μ΄ κ°λ₯ν μ΅λ νμ©μ£Όμ
μλ ₯κ³Ό μ΅λ νμ©μ£Όμ
μλλ₯Ό ꡬνλ λ°©λ²μ μ±ννμλ€.
κ³ μ쑰건 μλΉ κ·ΈλΌμ°ν
μνμ μ£Ό μ°κ΅¬λμ νμΈ 10λ² κ³΅κ³Ό 40λ² κ³΅ μ¬μ΄μ μλ 22λ² κ³΅μμ μ€μνμμΌλ©° μνκ²°κ³Όνκ°μ μνμ¬ μ΅λ νμ©μ£Όμ
μλ ₯μ
50.0 kgf/cm2 μ΄ν λ° μ΅λ νμ©μ£Όμ
μλλ₯Ό 180.0 L/min μ΄νλ‘ μ곡쑰건μ κ²°μ νμλ€(Table 4).
Table 4.
Estimation of High-Pressure Injection Test
No. 22
|
TEST Result
|
Result
DATA
|
|
Soil Type
|
β Weathered rock & Soil
|
Test Result
|
β Maximum grouting pressure 58.1 kgf/cm2 β Maximum grouting amount 200.2 L/min
|
Grouting Condition
|
β Limit grouting pressure (pcr) : 50 kgf/cm2 β Limit grouting amount (qcr) : 180 L/min
|
3.5 μλν κ·ΈλΌμ°ν
μμ€ν
μ μ μ©ν μ£Όμ
μ곡
μΌλ°μ μΌλ‘ μ μ λμ± λͺ°ν μ£Όμ
곡λ²μ μ£Όμ
μνλ₯Ό μ€μκ° νκ° ν μ μλ λ°©λ²μ΄ κ±°μ μμλλ° Minstry(1988), Kim(2012)μ μν΄ κ°λ°λ μ£Όμ
μ νμ μν μ£Όμ
μν νκ°κΈ°μ μ λμ
μΌλ‘ νΈλ¦¬νκ² μ곡 μ€ μ€μκ° κ·ΈλΌμ°ν
μ곡μνλ₯Ό νμΈνκ³ μ‘°μΉ ν μ μμλ€. νΉν, 10λ²
곡μ κ²½μ°, μλν κ·ΈλΌμ°ν
μμ€ν
μ μ μ©ν μ£Όμ
κ΄λ¦¬ κ²°κ³Ό μμ§λ°μ μλ°ν¨κ³Όμ λμμ λͺ°νꡬ근νμ±μ΄ μ΄λ£¨μ΄ μ§ κ²μΌλ‘ Aμ ν μμμ κ²½μ° μ¬μ§μΈ΅μμ
μ΄μμ μΈ λ³΄κ°μ£Όμ
μ κ²½μ°μ΄λ©° Eμ ν μμμ κ²½μ° μ§μ€μ μ£Όμ
λ μ μ λμ± λͺ°νμ΄ μ£Όμ
μλ ₯μΌλ‘ μΈν μ§μ€λ΄μ μλ°ν¨κ³Όμ λ°λ₯Έ κ·ΈλΌμ°ν
μ£Όμ
μ΄ μ μ ν μ΄λ£¨μ΄μ§κ³
μλ€κ³ λ³Ό μ μλ€(Table 5).
Table 5.
Real-Time Grouting Type Analysis in Grouting (Hole No.10)
Grouting
Chart
|
|
Hole N0
|
10
|
Grouting Depth
|
9.8 m (3 step)
|
Grouting Time
|
34~35 minute
|
Grouting Amount
|
1,509 β
|
Fine Aggregate
|
0.75 m3
|
Coarse Aggregate
|
0.75 m3
|
Cement
|
422 kg
|
Grouting Type Analysis
|
A Type
|
A Type : Grouting pressure increases sharply sometime after grouting starts
β Ideal permeation grouting in sandy soil
|
|
E Type
|
E Type : Grouting pressure increases repeating in the pattern of going up and down
β Ground fracture of grout material injected first occurs progressively because
of the newly permeating grout material. Thus, it can be considered that proper grouting is being
achieved.
|
|
3.6 μ£Όμ
ν¨κ³Ό λΆμ λ° νκ°
μ£Όμ
ν¨κ³Ό λΆμ λ° νκ°μ μ μ©λ 10λ² λ° 40λ² μμΉμμμ μ곡 μ Β·ν ν¬μμνμ λΉκ΅ λΆμκ³Ό κ°μ λ μ μ λμ± λͺ°ν μ£Όμ
곡λ²μ μ μ©ν μ§λ°λ³΄κ° μλ£
ꡬκ°μ λνμ¬ μ½μ보λ§μ ν΅ν 보κ°λ μ§λ°μ μ½μ μνΈμ νμμ¨κ³Ό μΌμΆμμΆκ°λ μΈ‘μ μ ν΅ν μ곡ν¨κ³Όλ₯Ό νμΈ νμλ€. κ·Έ κ²°κ³Ό μ곡 ν ν¬μκ³μ 8.32Γ10-5~1.57Γ10-5 cm/sec(κΈ°μ€μΉ 2.0Γ10-4 cm/sec μ΄ν)λ‘ μ곡 μ μ§νμ μ μΆλ‘ μΈν ν 립μ μ μ€μ μ곡 ν ν¬μκ³μκ° κ΄λ¦¬κΈ°μ€μΉ μ΄νλ‘ μΈ‘μ λμλ€(Table 6).
Table 6.
Field Permeability Test
Positions
|
Field Permeability Test
|
1.0 ~ 3.0 m
|
4.0 ~ 6.0 m
|
7.0 ~ 9.0 m
|
#10
|
Before Grouting
|
1.39 Γ 10-3 cm/sec
|
5.65 Γ 10-4 cm/sec
|
4.50 Γ 10-4 cm/sec
|
After Grouting
|
8.32 Γ 10-5 cm/sec
|
7.93 Γ 10-5 cm/sec
|
6.86 Γ 10-5 cm/sec
|
#40
|
Before Grouting
|
8.33 Γ 10-4 cm/sec
|
7.19 Γ 10-4 cm/sec
|
5.36 Γ 10-4 cm/sec
|
After Grouting
|
3.94 Γ 10-5 cm/sec
|
3.09 Γ 10-5 cm/sec
|
1.57 Γ 10-5 cm/sec
|
μ½μ λ³΄λ§ κ²°κ³Ό μ½μ νμμ¨μ νκ· 81.5 %μ΄λ©° νλννλ μΈ μμ½ λ°μ μνκ²°κ³Ό μ곡 μ ꡬκ°μ κ±Έμ³ μ μ λμ± λͺ°ν μ£Όμ
μ¬κ° νμΈ λμλ€(Fig.
4). μνΈμ 10λ² λ° 40λ² μμΉμμ κ°κ° 2κ°μ© μ΄ 4κ°λ₯Ό μ±μ·¨νμ¬ μΌμΆμμΆκ°λμνμ μΈ‘μ κ²°κ³Ό 17.9~23.3 MPa μΌλ‘ μΈ‘μ λμμΌλ©° κ΄λ¦¬κΈ°μ€μΉ
5 MPa μ΄μμΌλ‘ μΆ©λΆν μ§μ§λ ₯μ ν보 νμλ€(Fig. 5).
Fig. 4.
Total Core Recovery & Phenolphthalein Reaction Test
Fig. 5.
Unconfined Compression Test
4. κ²° λ‘
λ³Έ μ°κ΅¬λ λ
Έν μ§λ°©λ κΈκ²½μ¬μ§ λλ‘ꡬκ°μ μ§νμ λ±μΌλ‘ μΈν ν 립μ μ μΆ λ° μΉ¨νκ° λ°μνμ¬ λλ‘ ν΅νμ λνμ¬ μμ μ±μ ν보νκΈ° μνμ¬ ν΅ν μ€μΈ
ꡬκ°μ μ΅λν 보쑴νλ©° μ곡μ±μ κ³ λ €ν μ μ λμ± λͺ°νν μ£Όμ
κ³΅λ² κ·ΈλΌμ°ν
κΈ°μ μ΄ μ μ λ¨μ λ°λΌ λ³Έ νμ₯μ μ곡λͺ©μ μ μ ν©νκ² κΈ°μ‘΄ μΌλ°μ μΈ μ μ λμ±
곡λ²μ μλ‘κ² κ°μ νμ¬ μ곡 λ° κ²μ¦νλ μ°κ΅¬λ₯Ό μννμμΌλ©° λ€μκ³Ό κ°μ κ²°λ‘ μ λμΆνμλ€.
(1) λ³Έ μ°κ΅¬μμ μλ‘κ² κ°μ ν μ μ λμ± λͺ°νν κ·ΈλΌμ°ν
곡λ²μ μμκΈ°μ μ κ°μ λ μλν κ·ΈλΌμ°ν
κΈ°μ μ κΈ°λ°μΌλ‘ νΉν, κ³ μ쑰건 μλΉκ·ΈλΌμ°ν
μνμ
μν κ·ΈλΌμ°ν
μ곡쑰건 κ²°μ λ°©λ² λ° κ°μ λ μλν μμ€ν
μ μ΄μ©νμ¬ μ€μκ° κ°μ§λ P~q~t μ± νΈ μ ν λΆμμ ν΅ν κ·ΈλΌμ°ν
μ£Όμ
μ곡 κΈ°μ μ΄λ©°,
κ°μ λ κΈ°μ μ μ£Όμ
ν¨κ³Όλ₯Ό νκ°νκΈ° μνμ¬ μ곡 μ β€ν νμ₯ν¬μκ³μ μν λ° μ곡 ν μ½μ νμμ¨ μΈ‘μ λ° νλννλ μΈμμ½ λ°μμν λ° λ³΄λ§λ μ½μ
μνΈμ μ΄μ©ν μΌμΆμμΆκ°λμνμ μννμλ€.
(2) κ°μ λ μ μ λμ± λͺ°νν κ·ΈλΌμ°ν
곡λ²μ λ³Έ νμ₯μ μ μ©νμ¬ 10λ² ν λ° 40λ² ν μμΉμμ νμ₯ν¬μκ³μμνμ μ€μν κ²°κ³Ό μ곡 μ ν¬μκ³μκ°
8.33 Γ 10-4 ~ 1.39 Γ 10-3 cm/sec μμ μ곡 ν ν¬μκ³μκ° 8.32Γ10-5 ~ 1.57Γ10-5 cm/sec μΌλ‘ λ³Έ νμ₯μ ν¬μκ³μ κ΄λ¦¬κΈ°μ€μΉμΈ 2.0Γ10-4 cm/sec μ΄νλ₯Ό λ§μ‘±νμλ€.
(3) κ°μ λ μ μ λμ± λͺ°νν κ·ΈλΌμ°ν
곡λ²μ λ³Έ νμ₯μ μ μ©ν ν μμΆλ μ½μμ νμμ¨μ νκ· 81.5 %μ΄λ©° νλννλ μΈ μμ½ λ°μ μνκ²°κ³Ό μ곡λ
μ ꡬκ°μμ μ μ λμ± λͺ°ν μ£Όμ
μ¬κ° νμΈ λμλ€. νΉν, 10λ² ν λ° 40λ² ν μμΉμμ κ°κ° 2κ°μ© μ΄ 4κ°μ μνΈμ μ±μ·¨νμ¬ μΌμΆμμΆκ°λμνμ
μνν κ²°κ³Ό 17.9 ~ 23.3 MPaμΌλ‘ μΈ‘μ λμμΌλ©° λ³Έ νμ₯μ μΌμΆμμΆκ°λ κ΄λ¦¬κΈ°μ€μΉμΈ 5 MPa μ΄μμ λ§μ‘±νμλ€.
(4) κ°μ λ μ μ λμ± λͺ°νν κ·ΈλΌμ°ν
곡λ²μ μ μ©μΌλ‘ μ μ©νμ₯μ λ
Έν λλ‘ μλΆμ κΈκ²½μ¬μ§μμμ μ§νμ μ μΆμ μν ν 립μ μ μΆ λ°©μ§ λ° κΈ°μ‘΄ μ΄μ
λλ‘λΆμ μΉ¨ν κ°λ₯μ±μ ν¨κ³Όμ μΌλ‘ λ°©μ§νμλ€κ³ νλ¨λ¨μ λ°λΌ κ°μ λ κΈ°μ μ μ€ν¨μ±μ μΆ©λΆν κ²μ¦νμλ€κ³ μ¬λ£λλ€. λ³Έ μ°κ΅¬μμ κ°μ λ κΈ°μ μ μ΄μ©νμ¬
ν₯ν μ μ¬ν λ
Έννλ λλ‘μ λΉνλ©΄μμμ μ§νμμ μν ν 립μ μ μΆλ°©μ§ λ± μ μ§λ³΄μκ³΅μ¬ λΏλ§ μλλΌ κ°μ’
SOCμμ€λ¬Όμ λ΄μ§λ³΄κ° λ° μΉ¨νλ°©μ§ κ³΅μ¬
λ± λ€μν 곡μ¬μ μ μ©λ μ μλ κ°λ₯μ±μ νμΈνμλ€κ³ μ¬λ£λλ€.
Acknowledgements
λ³Έ λ
Όλ¬Έμ 2019 CONVENTION λ
Όλ¬Έμ μμ ·보μνμ¬ μμ±λμμ΅λλ€.
References
Ahn, J. H. (2018). Evaluation of construction management techniques and standards
for the umbrella method, Master Thesis, Department of Global Railroad, Global Convergence
Graduate School, Korea National University of Transportation (in Korean).
Chun, B. S., Kang, I. S., Koh, Y. I. and Kown, H. S. (2000). "Compaction effect by
the low slump motar grouting in ground." The Proceedings of the Korean Society of
Civil Engineers, KSCE, pp. 255-258 (in Korean).
Hankook Geotech (2019). The report of a reinforcement construction project of the
yulligogae dangerous steep slope area (in Korean).
Kim, J. C. (2012). The grouting management technology using AGS (Automatic Grouting
System), Construction New Technology, No. 644, pp. 27-28 (in Korean).
Minstry, J. F. (1988). Important aspects of river valley projects, Mahajan Book Distributors,
Amdavad, Gujarat, India, Vol. 2 (in English).
Nam, M. J. (2015). A study on the applicability of automatic grouting system (AGS)
for soil reinforcement, Master Thesis, Department of Civil Engineering, Graduate School