Mobile QR Code QR CODE : Journal of the Korean Society of Civil Engineers
1 
Cho, J. H. (2009). Development of a conceptual cost estimating model for PSC box girder bridge, MSc Thesis, Dongguk University (in Korean).Cho, J. H. (2009). Development of a conceptual cost estimating model for PSC box girder bridge, MSc Thesis, Dongguk University (in Korean).Google Search
2 
Cho, N. H., Kim, J. H., Lee, J. H., Yun, W. G. and Kim, K. J. (2011). “Preliminary cost estimation model for light rail transit station–compare with multiple regression and case based reasoning.” Conference of Korea Institute of Construction Engineering and Management, KICEM, pp. 183-184 (in Korean).Cho, N. H., Kim, J. H., Lee, J. H., Yun, W. G. and Kim, K. J. (2011). “Preliminary cost estimation model for light rail transit station–compare with multiple regression and case based reasoning.” Conference of Korea Institute of Construction Engineering and Management, KICEM, pp. 183-184 (in Korean).Google Search
3 
Ji, C. Y. (2008). CBR-Revision Model for improving the cost pre-dic-tion accuracy in the multi-family housing projects, MSc Thesis, The University of Seoul (in Korean).Ji, C. Y. (2008). CBR-Revision Model for improving the cost pre-dic-tion accuracy in the multi-family housing projects, MSc Thesis, The University of Seoul (in Korean).Google Search
4 
Kang, S. H. (2010). A study on approximate construction cost estima-ting of steel girder bridge, Ph.D. Dissertation, Korea Maritime University (in Korean).Kang, S. H. (2010). A study on approximate construction cost estima-ting of steel girder bridge, Ph.D. Dissertation, Korea Maritime University (in Korean).Google Search
5 
10.5345/JKIC.2009.9.4.111Kim, B. S. and Kwon, S. H. (2009). “The conceptual cost estimated model on preliminary design phase for RC rahmen bridge.” J. of Korea Institute of Construction Engineering and Management, KICEM, Vol. 10, No. 2, pp. 111-119 (in Korean).Kim, B. S. and Kwon, S. H. (2009). “The conceptual cost estimated model on preliminary design phase for RC rahmen bridge.” J. of Korea Institute of Construction Engineering and Management, KICEM, Vol. 10, No. 2, pp. 111-119 (in Korean).DOI
6 
Kim, G. H. and Kang, K. I. (2004). “A Study on predicting con-struction cost of apartment housing projects based on case based reasoning technique at the project stage.” J. of Architectural Institute of Korea, AIK, Vol. 20, No. 5, pp. 83-92 (in Korean).Kim, G. H. and Kang, K. I. (2004). “A Study on predicting con-struction cost of apartment housing projects based on case based reasoning technique at the project stage.” J. of Architectural Institute of Korea, AIK, Vol. 20, No. 5, pp. 83-92 (in Korean).Google Search
7 
Kim, G. J., Kim, G. M., Kwon, S. H., Kim, B. S. and Kim, H. R. (2011). “Framework for proper construction cost estimation system of bridges.” Feature Article of Korea Institute of Construction Engineering and Management, KICEM, Vol. 12, No. 5, pp. 16-23 (in Korean).Kim, G. J., Kim, G. M., Kwon, S. H., Kim, B. S. and Kim, H. R. (2011). “Framework for proper construction cost estimation system of bridges.” Feature Article of Korea Institute of Construction Engineering and Management, KICEM, Vol. 12, No. 5, pp. 16-23 (in Korean).Google Search
8 
Kim, S. G. (2010). Approximate cost estimation model using phased cost information for bridge construction project-Focus in PSC beam bridge, Ph.D. Dissertation, Chung-Ang University (in Korean).Kim, S. G. (2010). Approximate cost estimation model using phased cost information for bridge construction project-Focus in PSC beam bridge, Ph.D. Dissertation, Chung-Ang University (in Korean).Google Search
9 
Kim, Y. S. (2010). MRA revision model based on CBR for cost prediction in early stage, MSc Thesis, The University of Seoul (in Korean).Kim, Y. S. (2010). MRA revision model based on CBR for cost prediction in early stage, MSc Thesis, The University of Seoul (in Korean).Google Search
10 
Koo, C. W. (2007). A CBR-based hybrid for predicting construction duration and cost based on project characteristics in multi-family housing projects, MSc Thesis, The University of Seoul (in Korean).Koo, C. W. (2007). A CBR-based hybrid for predicting construction duration and cost based on project characteristics in multi-family housing projects, MSc Thesis, The University of Seoul (in Korean).Google Search
11 
Kwon, S. H. (2008). Regression analysis, Freedomacademy (in Korean).Kwon, S. H. (2008). Regression analysis, Freedomacademy (in Korean).Google Search
12 
Hiller, F. S. and Hiller, M. S. (2004). Introduction to management science, Translated by Rho, H. B. et al., HanGyeong-Sa (in Korean).Hiller, F. S. and Hiller, M. S. (2004). Introduction to management science, Translated by Rho, H. B. et al., HanGyeong-Sa (in Korean).Google Search
13 
10.1007/s12205-013-1638-5Lee, S. W., Jin, Y. M., Woo, S. K. and Shin, D. H. (2013). “Appro-ximate cost estimating model of type trade for river facility construction using case-based reasoning and genetic algorithms.” J. of Civil Engineering, KSCE, Vol. 17, No. 2, pp. 292-300. Lee, S. W., Jin, Y. M., Woo, S. K. and Shin, D. H. (2013). “Appro-ximate cost estimating model of type trade for river facility construction using case-based reasoning and genetic algorithms.” J. of Civil Engineering, KSCE, Vol. 17, No. 2, pp. 292-300.DOI
14 
Moon, B. R. (2008). Genetic Algorithms to learn easily, HANBIT Media Inc (in Korean).Moon, B. R. (2008). Genetic Algorithms to learn easily, HANBIT Media Inc (in Korean).Google Search
15 
Park, C. K. and Seo, J. Y. (2009). “Genetic algorithm of the planar storage location assignment problem.” J. of the Korean Institute of Industrial Engineers, KIIE, Vol. 35, No 2, pp. 129-140 (in Korean).Park, C. K. and Seo, J. Y. (2009). “Genetic algorithm of the planar storage location assignment problem.” J. of the Korean Institute of Industrial Engineers, KIIE, Vol. 35, No 2, pp. 129-140 (in Korean).Google Search
16 
Park, K. H., Song, H. S. and Won, J. Y. (2012). Managing science, KyoboBook (in Korean).Park, K. H., Song, H. S. and Won, J. Y. (2012). Managing science, KyoboBook (in Korean).Google Search
17 
10.6106/KJCEM.2010.11.4.22Park, M. S., Seong, K. H., Lee, H. S., Ji, S. H. and Kim, S. Y. (2010). “Schematic cost estimation method using case-based reasoning : Focusing on Determining Weight.” J. of Korea Institute of Construction Engineering and Management, KICEM, Vol. 11, No. 4, pp. 22-31 (in Korean).Park, M. S., Seong, K. H., Lee, H. S., Ji, S. H. and Kim, S. Y. (2010). “Schematic cost estimation method using case-based reasoning : Focusing on Determining Weight.” J. of Korea Institute of Construction Engineering and Management, KICEM, Vol. 11, No. 4, pp. 22-31 (in Korean).DOI
18 
RRI, (2012). Project remodeling of aqueduct bridges toward for landscape & enhancement, Rural Research Institute (in Korean).RRI, (2012). Project remodeling of aqueduct bridges toward for landscape & enhancement, Rural Research Institute (in Korean).Google Search
19 
Aamodt, A. and Plaza, E. (1994). “Case based reasoning: Foun-dational issue, methodological variation, and system approaches.” AI Communications, ISO, Vol. 7, No. 1, pp. 39-59.Aamodt, A. and Plaza, E. (1994). “Case based reasoning: Foun-dational issue, methodological variation, and system approaches.” AI Communications, ISO, Vol. 7, No. 1, pp. 39-59.Google Search
20 
Brown, C. E. and Gupta, U. G. (1994). “Applying cased-based reasoning to the accounting domain.” Intelligent Systems in Accounting Finance and Management, Vol. 3, pp. 205-221. Brown, C. E. and Gupta, U. G. (1994). “Applying cased-based reasoning to the accounting domain.” Intelligent Systems in Accounting Finance and Management, Vol. 3, pp. 205-221.Google Search
21 
10.1061/(ASCE)0733-9364(2006)132:10(1092)Doğan, S. Z., Arditi, D. and Gnaydin, H. M. (2006). “Determining attribute weights in a CBR model for early cost prediction of structural systems.” J. of Construction Engineering and Management, ASCE, Vol. 132, No. 10, pp. 1092-1098. Doğan, S. Z., Arditi, D. and Gnaydin, H. M. (2006). “Determining attribute weights in a CBR model for early cost prediction of structural systems.” J. of Construction Engineering and Management, ASCE, Vol. 132, No. 10, pp. 1092-1098.DOI
22 
Riesbeck, C. and Schank, R. (1989). Inside case-based reasoning, Lawrence Erlbaum Associate, Publishers, New Jersey.Riesbeck, C. and Schank, R. (1989). Inside case-based reasoning, Lawrence Erlbaum Associate, Publishers, New Jersey.Google Search