Mobile QR Code QR CODE : Journal of the Korean Society of Civil Engineers
1 
Chang, K. T. (2008). Introduction to geographic information systems (4th ed.), McGraw-Hill, Boston.Chang, K. T. (2008). Introduction to geographic information systems (4th ed.), McGraw-Hill, Boston.Google Search
2 
Du, J. C. and Teng, H. C. (2007). “3D laser scanning and GPS technology for landslide earthwork volume estimation.” Journal of Automation in Construction, Vol. 16, No. 5, pp. 657-663.10.1016/j.autcon.2006.11.002Du, J. C. and Teng, H. C. (2007). “3D laser scanning and GPS technology for landslide earthwork volume estimation.” Journal of Automation in Construction, Vol. 16, No. 5, pp. 657-663.DOI
3 
Han, J. H. and Nam, S. H. (2011). “A study on the automated estimating system using BIM based library.” Journal of Korea Institute of Building Information Modeling, Korea Institute of Building Information Modeling, Vol. 1, No. 2, pp. 13-17 (in Korean).Han, J. H. and Nam, S. H. (2011). “A study on the automated estimating system using BIM based library.” Journal of Korea Institute of Building Information Modeling, Korea Institute of Building Information Modeling, Vol. 1, No. 2, pp. 13-17 (in Korean).Google Search
4 
Jun, K. H. and Yun, S. H. (2011). “The case study of BIM-based quantity take-off for concrete and formwork.” Journal of Korea Institute of Building Information Modeling, Korea Institute of Building Information Modeling, Vol. 1, No. 1, pp. 13-17 (in Korean).Jun, K. H. and Yun, S. H. (2011). “The case study of BIM-based quantity take-off for concrete and formwork.” Journal of Korea Institute of Building Information Modeling, Korea Institute of Building Information Modeling, Vol. 1, No. 1, pp. 13-17 (in Korean).Google Search
5 
Kim, C. S. (2011). A study on the modeling method for material take-off of BIM based framework, Master's Thesis, Kyeongsang National University (in Korean).Kim, C. S. (2011). A study on the modeling method for material take-off of BIM based framework, Master's Thesis, Kyeongsang National University (in Korean).Google Search
6 
Kong, J. Y., Kang, H. J. and Yoon, S. J. (2002). “A study on terrain surface modeling and polygon-searching algorithms.” Proceedings of The Korea Society for Simulation Autumn Conference, The Korea Society for Simulation, pp. 163-170 (in Korean).Kong, J. Y., Kang, H. J. and Yoon, S. J. (2002). “A study on terrain surface modeling and polygon-searching algorithms.” Proceedings of The Korea Society for Simulation Autumn Conference, The Korea Society for Simulation, pp. 163-170 (in Korean).Google Search
7 
Kwon, O. C., Jo, C. W. and Cho, J. W. (2011). “Introduction of BIM quality standard for quantity take-off.” Korea Journal of Construction Engineering and Management, The Korea Institute of Building Construction, Vol. 11, No. 2, pp. 171-180 (in Korean).10.5345/JKIC.2011.04.2.171Kwon, O. C., Jo, C. W. and Cho, J. W. (2011). “Introduction of BIM quality standard for quantity take-off.” Korea Journal of Construction Engineering and Management, The Korea Institute of Building Construction, Vol. 11, No. 2, pp. 171-180 (in Korean).DOI
8 
Park, Y. J., Oh, Y. S., Cho, C. Y. and Lee, J. B. (2011). “Quantity surveying for structural components using building information model.” Proceedings of Korea Institute of Construction Engineering and Management Annual Conference, Korea Institute of Construction Engineering and Management, pp. 20-26 (in Korean).Park, Y. J., Oh, Y. S., Cho, C. Y. and Lee, J. B. (2011). “Quantity surveying for structural components using building information model.” Proceedings of Korea Institute of Construction Engineering and Management Annual Conference, Korea Institute of Construction Engineering and Management, pp. 20-26 (in Korean).Google Search
9 
Shen, Z. and Issa, Raja R, A. (2010). “Quantitative evaluation of the BIM-assisted construction detailed cost estimates.” Journal of Information Technology in Construction, Information Technology in Construction, Vol. 15, pp. 234-257 (in Slovenia).Shen, Z. and Issa, Raja R, A. (2010). “Quantitative evaluation of the BIM-assisted construction detailed cost estimates.” Journal of Information Technology in Construction, Information Technology in Construction, Vol. 15, pp. 234-257 (in Slovenia).Google Search
10 
Steel, J. and Drogemuller, R. (2011). “Domain-specific model transformation in building quantity take-off.” Proceedings of the 14th International Conference, Willington, New Zealand, pp. 198-212.Steel, J. and Drogemuller, R. (2011). “Domain-specific model transformation in building quantity take-off.” Proceedings of the 14th International Conference, Willington, New Zealand, pp. 198-212.Google Search
11 
Trost, S. M. and Overlender, G. D. (2003). “Predicting accuracy of early cost estimates using factor analysis and multivariate regression.” Journal of Construction Management, ASCE, Vol. 129, No. 2, pp. 198-204.10.1061/(ASCE)0733-9364(2003)129:2(198)Trost, S. M. and Overlender, G. D. (2003). “Predicting accuracy of early cost estimates using factor analysis and multivariate regression.” Journal of Construction Management, ASCE, Vol. 129, No. 2, pp. 198-204.DOI
12 
Yilmaz, I. (2009) “A research on the accuracy of landform volumes determines using different interpolation methods.” Scientific Research and Essays, Academic Journals, Vol. 4, No. 11, pp. 1248-1259.Yilmaz, I. (2009) “A research on the accuracy of landform volumes determines using different interpolation methods.” Scientific Research and Essays, Academic Journals, Vol. 4, No. 11, pp. 1248-1259.Google Search