Mobile QR Code QR CODE : Journal of the Korean Society of Civil Engineers
1 
Administration and Governance (ADB) (2006). Prequalification of bidders user’s guide, Asian Development Bank, Philippine.Administration and Governance (ADB) (2006). Prequalification of bidders user’s guide, Asian Development Bank, Philippine.Google Search
2 
Barney, J. B. (1991). “Frim resources and sustained competitive advantage.” J. of Mngt., Vol. 17, pp. 99-120.Barney, J. B. (1991). “Frim resources and sustained competitive advantage.” J. of Mngt., Vol. 17, pp. 99-120.Google Search
3 
Chan, A. P. C. and Chan, A. P. L. (2004). Key performance indicators for measuring construction success, Benchmarking: An Int. J., Vol. 11, No. 2, pp. 203-221.Chan, A. P. C. and Chan, A. P. L. (2004). Key performance indicators for measuring construction success, Benchmarking: An Int. J., Vol. 11, No. 2, pp. 203-221.Google Search
4 
Construction Association of Korea (CAK) (2014). The main statistics, Available at: http://www.cak.or.kr (Assessed: Feb. 3, 2014).Construction Association of Korea (CAK) (2014). The main statistics, Available at: http://www.cak.or.kr (Assessed: Feb. 3, 2014).Google Search
5 
Do, T. (2005). “Optimal direction for the institution of construction assessment system.” Korea Research Institute for Human Settlements, Vol. 41, pp. 79-85. Do, T. (2005). “Optimal direction for the institution of construction assessment system.” Korea Research Institute for Human Settlements, Vol. 41, pp. 79-85.Google Search
6 
Engineering News Records (2004-2013). Top 225 international contractors (2004-2013), New York.Engineering News Records (2004-2013). Top 225 international contractors (2004-2013), New York.Google Search
7 
International Construction Association of Korea (ICAK) (2014). International construction information service, Available at: http://www.icak.or.kr (Assessed: February, 2014).International Construction Association of Korea (ICAK) (2014). International construction information service, Available at: http://www.icak.or.kr (Assessed: February, 2014).Google Search
8 
Jang, Y., Park, M. and Lee, H. (2008). “Development of a web-based performance management system using benchmarking for small and medium-sized construction companies.” Proceeding Journal of Korea Institute of Construction Engineering and Management, pp. 876-870.Jang, Y., Park, M. and Lee, H. (2008). “Development of a web-based performance management system using benchmarking for small and medium-sized construction companies.” Proceeding Journal of Korea Institute of Construction Engineering and Management, pp. 876-870.Google Search
9 
Jung, W., Han, S., Jang, W. and Koo, B. (2010). “Empirical assessment of international entry strategy for large construction companies.” Journal of Korea Institute of Construction Engineering and Management, Vol. 11, No. 1, pp. 59-69.10.6106/KJCEM.2010.11.1.59Jung, W., Han, S., Jang, W. and Koo, B. (2010). “Empirical assessment of international entry strategy for large construction companies.” Journal of Korea Institute of Construction Engineering and Management, Vol. 11, No. 1, pp. 59-69.DOI
10 
Kim, S. (2006). “Analysis of problems and its improvement for construction capability assessment system.” Construction Economy, Korea Research Institute for Human Settlements, Vol. 47, pp. 28-35.Kim, S. (2006). “Analysis of problems and its improvement for construction capability assessment system.” Construction Economy, Korea Research Institute for Human Settlements, Vol. 47, pp. 28-35.Google Search
11 
Kravchuk, Robert S. and Ronald W. Schack. (1996). “Designing effective performance measurement systems under the government performance and results act of 1993.” Public Administration Review, Vol. 56, No. 4, pp. 348-358.10.2307/976376Kravchuk, Robert S. and Ronald W. Schack. (1996). “Designing effective performance measurement systems under the government performance and results act of 1993.” Public Administration Review, Vol. 56, No. 4, pp. 348-358.DOI
12 
Kruger, R. A. and Casey, M. A. (2000). “Focus gropus: A Practical Guide for Applied Reasearch.” Intl. J. of Proj. Mngt., Vol. 19, No. 4, pp. 207-222.Kruger, R. A. and Casey, M. A. (2000). “Focus gropus: A Practical Guide for Applied Reasearch.” Intl. J. of Proj. Mngt., Vol. 19, No. 4, pp. 207-222.Google Search
13 
Kwon, H. (2006). “A study on the building a lowrisk model by analysing the bankrupted technology-appraised companies.” Doctoral Thesis, Kun-kook University, Korea.Kwon, H. (2006). “A study on the building a lowrisk model by analysing the bankrupted technology-appraised companies.” Doctoral Thesis, Kun-kook University, Korea.Google Search
14 
Lee, B. (2005a). “A study on the establishing the credit evaluating system of construction companies.” The Koran Research Assocaition for The Business Education, Vol. 10, pp. 273-289. Lee, B. (2005a). “A study on the establishing the credit evaluating system of construction companies.” The Koran Research Assocaition for The Business Education, Vol. 10, pp. 273-289.Google Search
15 
Lee, B. and Lee, E. (2008). “A research for improvement of construction capacity evaluation system.” Research Report, Korea Research Institute of Construction Policy (in Korean).Lee, B. and Lee, E. (2008). “A research for improvement of construction capacity evaluation system.” Research Report, Korea Research Institute of Construction Policy (in Korean).Google Search
16 
Lee, E. (2005b). The development plan of credit evaluation system for construction company, Research Report, Construction Economy Research Institute of Korea (in Korean).Lee, E. (2005b). The development plan of credit evaluation system for construction company, Research Report, Construction Economy Research Institute of Korea (in Korean).Google Search
17 
Ng, S. T., Palaneeswaran, E. and Kumaraswamy, M. M. (2002). “A dynamic e-reporting system for contractor’s performance appraisal.” Advances in Engineering Software, Vol. 33, No. 6, pp. 339-349. 10.1016/S0965-9978(02)00042-XNg, S. T., Palaneeswaran, E. and Kumaraswamy, M. M. (2002). “A dynamic e-reporting system for contractor’s performance appraisal.” Advances in Engineering Software, Vol. 33, No. 6, pp. 339-349.DOI
18 
Park, H., Lee, S. and Thomas, S. R. (2004). “Effect of benchmarking based on U.S. cases.” Journal of Korea Society of Civil Engineers, Vol. 24, No. 4D, pp. 617-622.Park, H., Lee, S. and Thomas, S. R. (2004). “Effect of benchmarking based on U.S. cases.” Journal of Korea Society of Civil Engineers, Vol. 24, No. 4D, pp. 617-622.Google Search
19 
Porter, M. E. (1979). “How competitive forces shape strategy.” Harvard Business Review, Vol. 57, No. 2, pp. 137-145.Porter, M. E. (1979). “How competitive forces shape strategy.” Harvard Business Review, Vol. 57, No. 2, pp. 137-145.Google Search
20 
Pralahad, C. K. and Hamel, G. (1990). “The core competencies of the corporation.” Harvard Business Review, Vol. 90, No. 3, pp. 79-91.Pralahad, C. K. and Hamel, G. (1990). “The core competencies of the corporation.” Harvard Business Review, Vol. 90, No. 3, pp. 79-91.Google Search
21 
Radujkovic, M., Vukovanovic, M. and Dunovic, I. B. (2010). “Application of key performance indicators in South-Eastern European construction.” J.of Civil Eng. and Mngt., Vol. 16, No. 4, pp. 521-530.Radujkovic, M., Vukovanovic, M. and Dunovic, I. B. (2010). “Application of key performance indicators in South-Eastern European construction.” J.of Civil Eng. and Mngt., Vol. 16, No. 4, pp. 521-530.Google Search
22 
Wang, S. and Hyun, J. (2001). Improvement plan for credit ratings and project financng at the constrution company perspectives, Trends in the Construction Industry, Construction Economy Research Institute of Korea. (in Korean).Wang, S. and Hyun, J. (2001). Improvement plan for credit ratings and project financng at the constrution company perspectives, Trends in the Construction Industry, Construction Economy Research Institute of Korea. (in Korean).Google Search
23 
Won, J. and Lee, K. (2007). “An analysis of the ability of the Korean construction industry based on the labor productivity of specialty contractors.” Journal of Architecture Institute of Korea, Vol. 27, No. 1, pp. 705-708.Won, J. and Lee, K. (2007). “An analysis of the ability of the Korean construction industry based on the labor productivity of specialty contractors.” Journal of Architecture Institute of Korea, Vol. 27, No. 1, pp. 705-708.Google Search
24 
World Bank (2007). Prequalification document for procurement of works and user’s guide, DC, USA.World Bank (2007). Prequalification document for procurement of works and user’s guide, DC, USA.Google Search
25 
Xiao, H. and Proverbs, D. (2003) Factors influencing contractor performance: An International Investigation, Const. and Arch. Mngt., Vol. 10, No. 5, pp. 322-332.10.1108/09699980310502937Xiao, H. and Proverbs, D. (2003) Factors influencing contractor performance: An International Investigation, Const. and Arch. Mngt., Vol. 10, No. 5, pp. 322-332.DOI
26 
Yu, I., Kim, K., Jung, Y. and Jin, S. (2006). “Analysis of quantified characteristics of the performance indicators for construction companies.” Journal of Korea Institute of Construction Engineering and Management, Vol. 7, No. 4, pp. 154-163.Yu, I., Kim, K., Jung, Y. and Jin, S. (2006). “Analysis of quantified characteristics of the performance indicators for construction companies.” Journal of Korea Institute of Construction Engineering and Management, Vol. 7, No. 4, pp. 154-163.Google Search
27 
Yu, I., Kim, K., Jung, Y., Jin, Y. and Kim, Y. (2004). “A framework of the comparable performance measurement in the construction industry.” Journal of Korea Institute of Construction Engineering and Management, Vol. 5, No. 5, pp. 172-182.Yu, I., Kim, K., Jung, Y., Jin, Y. and Kim, Y. (2004). “A framework of the comparable performance measurement in the construction industry.” Journal of Korea Institute of Construction Engineering and Management, Vol. 5, No. 5, pp. 172-182.Google Search