Mobile QR Code QR CODE : Journal of the Korean Society of Civil Engineers
1 
Cho, H., Cho, Y. R. and Kim, H. S. (2011). “Application of construc-tion management integrated system based on BIM in civil engineering project.” Journal of the Korean Society of Civil Engineering, Vol. 59, No. 2, pp. 36-42. Cho, H., Cho, Y. R. and Kim, H. S. (2011). “Application of construc-tion management integrated system based on BIM in civil engineering project.” Journal of the Korean Society of Civil Engineering, Vol. 59, No. 2, pp. 36-42.Google Search
2 
Construction Economy News (2012). “Automating construction equipment using GPS.” (Newspaper 2012.8.17).Construction Economy News (2012). “Automating construction equipment using GPS.” (Newspaper 2012.8.17).Google Search
3 
Electronic News (2012). “GPS information can be used for SOC projects.” (Newspaper 2012.10.31).Electronic News (2012). “GPS information can be used for SOC projects.” (Newspaper 2012.10.31).Google Search
4 
Kim, B. H. (2000). “Comprehensive management of construction equipment using GPS.” Construction Technology Information, No. 9, pp. 5-10.Kim, B. H. (2000). “Comprehensive management of construction equipment using GPS.” Construction Technology Information, No. 9, pp. 5-10.Google Search
5 
Kim, H. J., Choi, J. S., Kim, H. S. and Kim, I. H. (2013). “The development of data model for open BIM-Based schematic estimates - Focused on construction type for actual cost of public projects.” Architectural Research, Vol. 29, No. 3, pp. 61-70.Kim, H. J., Choi, J. S., Kim, H. S. and Kim, I. H. (2013). “The development of data model for open BIM-Based schematic estimates - Focused on construction type for actual cost of public projects.” Architectural Research, Vol. 29, No. 3, pp. 61-70.Google Search
6 
Kim, M. J., Lee, K. H., Kwon, S. H., Park, S. I. and Lee, S. C. (2014). “BIM application case study of civil infrastructure Industry.” Proceedings of the Korean Society for Railway, pp. 1119-1124.Kim, M. J., Lee, K. H., Kwon, S. H., Park, S. I. and Lee, S. C. (2014). “BIM application case study of civil infrastructure Industry.” Proceedings of the Korean Society for Railway, pp. 1119-1124.Google Search
7 
Kim, T. H. and Lee, C. S. (2014). “A survey of Building Information modeling in domestic public construction on actual case.” Proceedings of Korean Institute of Construction Engineering, pp. 247-251.Kim, T. H. and Lee, C. S. (2014). “A survey of Building Information modeling in domestic public construction on actual case.” Proceedings of Korean Institute of Construction Engineering, pp. 247-251.Google Search
8 
Lee, B. H., Hong, S. W. and Shin, S. W. (2012). “The development of BIM library for building life cycle CO2 assessment.” Journal of the Korean Digital Architecture Interior Association, Vol. 12, No. 2, pp. 67-76.Lee, B. H., Hong, S. W. and Shin, S. W. (2012). “The development of BIM library for building life cycle CO2 assessment.” Journal of the Korean Digital Architecture Interior Association, Vol. 12, No. 2, pp. 67-76.Google Search
9 
Lee, G. H., Kim, J. H. and Kim, J. J. (2012). “BIM utilization plan for schedule risk management.” Proceedings of Korea Institute of Building Construction, Vol. 12, No. 1, pp. 143-144.Lee, G. H., Kim, J. H. and Kim, J. J. (2012). “BIM utilization plan for schedule risk management.” Proceedings of Korea Institute of Building Construction, Vol. 12, No. 1, pp. 143-144.Google Search
10 
Lee, H. Y. and Shim, J. H. (2013). GIS Geographic information theory and practice, Beopmoonsa, Seoul, Korea.Lee, H. Y. and Shim, J. H. (2013). GIS Geographic information theory and practice, Beopmoonsa, Seoul, Korea.Google Search
11 
Lee, S. Y., Park, C. S. and Kim, I. H. (2014). “Issues and prospects of BIM-to-BEM (Building Energy Model).” Architectural Research, Vol. 30, No. 4, pp. 199-206.10.5659/jaik_pd.2014.30.4.199Lee, S. Y., Park, C. S. and Kim, I. H. (2014). “Issues and prospects of BIM-to-BEM (Building Energy Model).” Architectural Research, Vol. 30, No. 4, pp. 199-206.DOI
12 
National Geographic Information Institute (2015). GNSS Data Service, Available at: http://gnss.ngi.go.kr/ (Accessed: March 15, 2015).National Geographic Information Institute (2015). GNSS Data Service, Available at: http://gnss.ngi.go.kr/ (Accessed: March 15, 2015).Google Search
13 
Park, J. B. (2008). A study on GIS and simulation based process model for earthmoving planning, Master’s Thesis, Hanyang University.Park, J. B. (2008). A study on GIS and simulation based process model for earthmoving planning, Master’s Thesis, Hanyang University.Google Search
14 
Park, M. S., Cho, J. Y., Lee, H. S., Kwon, S. K. and Ahn, S. J. (2012). “BIM design management process using the dependency structure matrix at the introduction phase.” Architectural Research, Vol. 28, No. 1, pp. 37-45.Park, M. S., Cho, J. Y., Lee, H. S., Kwon, S. K. and Ahn, S. J. (2012). “BIM design management process using the dependency structure matrix at the introduction phase.” Architectural Research, Vol. 28, No. 1, pp. 37-45.Google Search
15 
Public Procurement Service (2013). A Guideline for applying BIM to facility projects, Daejeon, Korea.Public Procurement Service (2013). A Guideline for applying BIM to facility projects, Daejeon, Korea.Google Search
16 
Seo, M. B., Joo, G. B. and Kim, N. G. (2013). “Analysis of substitutability of 2D electronic drawing using the BIM model - focusing on the electronic delivery system in road field.” Journal of the Korea Contents Association, Vol. 13, No. 11, pp. 441-450.10.5392/JKCA.2013.13.11.441Seo, M. B., Joo, G. B. and Kim, N. G. (2013). “Analysis of substitutability of 2D electronic drawing using the BIM model - focusing on the electronic delivery system in road field.” Journal of the Korea Contents Association, Vol. 13, No. 11, pp. 441-450.DOI
17 
Shim, C. H., Lee, K. M., Kang, I. S., Kim, Y. H. and Hwang, K. H. (2011). BIM guideline for civil engineering, Virtual Construction Research Group, Ministry of Land, Infrastructure and Transportation, Sejong, KoreaShim, C. H., Lee, K. M., Kang, I. S., Kim, Y. H. and Hwang, K. H. (2011). BIM guideline for civil engineering, Virtual Construction Research Group, Ministry of Land, Infrastructure and Transportation, Sejong, KoreaGoogle Search
18 
Shin, J. C., Back, Y. I. and Park, W. T. (2011). “Technical note : Analysis of Errors in Tunnel Quantity Estimation with 3D-BIM Compared with Routine Method Based 2D.” Journal of the Korean Geotechnical Society, Vol. 27, No. 8, pp. 63-71.10.7843/kgs.2011.27.8.063Shin, J. C., Back, Y. I. and Park, W. T. (2011). “Technical note : Analysis of Errors in Tunnel Quantity Estimation with 3D-BIM Compared with Routine Method Based 2D.” Journal of the Korean Geotechnical Society, Vol. 27, No. 8, pp. 63-71.DOI