Mobile QR Code QR CODE : Journal of the Korean Society of Civil Engineers
1 
Caterpillar, Inc. (2014). Caterpillar performance handbook, 40th Ed., Caterpillar Peoria.Caterpillar, Inc. (2014). Caterpillar performance handbook, 40th Ed., Caterpillar Peoria.Google Search
2 
Lee et al. (2015). “System for information providing of excavator combination and method for thereof.” Korean Patent, 10-2015-0189873.Lee et al. (2015). “System for information providing of excavator combination and method for thereof.” Korean Patent, 10-2015-0189873.Google Search
3 
Lim, T., Park, S., Lee, H. and Lee, D. (2015). “Artificial neural network–based slip-trip classifier using smart sensor for construction workplace.” Journal Constr. Eng. Manage., Vol. 142, No. 2. doi : 10.1061/(ASCE)CO.1943-7862.0001049.10.1061/(ASCE)CO.1943-7862.0001049Lim, T., Park, S., Lee, H. and Lee, D. (2015). “Artificial neural network–based slip-trip classifier using smart sensor for construction workplace.” Journal Constr. Eng. Manage., Vol. 142, No. 2. doi : 10.1061/(ASCE)CO.1943-7862.0001049.DOI
4 
Limsiri, C. (2011). “Optimization of loader-hauler fleet selection.” European Journal of Scientific Research, Vol. 56, No. 2, pp. 266-271.Limsiri, C. (2011). “Optimization of loader-hauler fleet selection.” European Journal of Scientific Research, Vol. 56, No. 2, pp. 266-271.Google Search
5 
Marzouk, M. and Moselhi, O. (2003). “Object-oriented simulation model for earthmoving operations.” Journal of Const Engrg and Mangt., Vol. 129, No. 2, pp. 173-181. doi : 10.1061/(ASCE)0733- 9364(2003)129:2(173).Marzouk, M. and Moselhi, O. (2003). “Object-oriented simulation model for earthmoving operations.” Journal of Const Engrg and Mangt., Vol. 129, No. 2, pp. 173-181. doi : 10.1061/(ASCE)0733- 9364(2003)129:2(173).Google Search
6 
Moselhi, O. and Alshibani, A. (2009). “Optimization of earthmoving operations in heavy civil engineering projects.” Journal of Const Engrg and Mangt., Vol. 135, No. 10, pp. 948-954. doi : 10.1061/ (ASCE)0733-9364(2009)135:10(948).10.1061/(asce)0733-9364(2009)135:10(948)Moselhi, O. and Alshibani, A. (2009). “Optimization of earthmoving operations in heavy civil engineering projects.” Journal of Const Engrg and Mangt., Vol. 135, No. 10, pp. 948-954. doi : 10.1061/ (ASCE)0733-9364(2009)135:10(948).DOI
7 
Nunnally, S. W. (2006). Construction Methods and Management, Prentice Hall PTR.Nunnally, S. W. (2006). Construction Methods and Management, Prentice Hall PTR.Google Search
8 
Peurifoy, R. L., Schexnayder, C. J. and Shapira, A. (2009). Construction Planning, Equipment, and Methods, 7 th Ed. Mcgraw-Hill.Peurifoy, R. L., Schexnayder, C. J. and Shapira, A. (2009). Construction Planning, Equipment, and Methods, 7 th Ed. Mcgraw-Hill.Google Search
9 
Smith, S. D., Osborne, J. R. and Forde, M. C. (1995). “Analysis of earth-moving systems using discrete-event simulation.” Journal Constr. Eng. Manage., Vol. 121, No. 4. pp. 388-396. doi : 10.1061/ (ASCE)0733-9364(1995)121:4(388), 388-396.10.1061/(ASCE)0733-9364(1995)121:4(388)Smith, S. D., Osborne, J. R. and Forde, M. C. (1995). “Analysis of earth-moving systems using discrete-event simulation.” Journal Constr. Eng. Manage., Vol. 121, No. 4. pp. 388-396. doi : 10.1061/ (ASCE)0733-9364(1995)121:4(388), 388-396.DOI