Mobile QR Code QR CODE : Journal of the Korean Society of Civil Engineers
1 
Amirkhanian, S. and Baker, N. (1992). “Expert system forequipment selection for earth-moving operation.” Journal Constr. Eng. Manage., Vol. 118, No. 2, pp. 318-331.10.1061/(ASCE)0733-9364(1992)118:2(318)Amirkhanian, S. and Baker, N. (1992). “Expert system forequipment selection for earth-moving operation.” Journal Constr. Eng. Manage., Vol. 118, No. 2, pp. 318-331.DOI
2 
Balqies, S. and Omar, A.-B. (2007). “LBS and GIS technology combination and applications.” AICCSA '07. IEEE/ACS International Conference on, Computer Systems and Applications, pp. 578-583.Balqies, S. and Omar, A.-B. (2007). “LBS and GIS technology combination and applications.” AICCSA '07. IEEE/ACS International Conference on, Computer Systems and Applications, pp. 578-583.Google Search
3 
Cheng, Z., eAmin, H. and Homam, B. (2009). “Collaborative multi-agent systems for construction equipment based on real-time field data capturing.” ITcon, Vol. 14, Special Issue, pp. 204-228.Cheng, Z., eAmin, H. and Homam, B. (2009). “Collaborative multi-agent systems for construction equipment based on real-time field data capturing.” ITcon, Vol. 14, Special Issue, pp. 204-228.Google Search
4 
Easa, S. M. (1988). “Improved method for locating centroid of earthwork.” Journal of Surveying Engineering, ASCE, Vol. 114, No. 1, pp. 13-25.10.1061/(ASCE)0733-9453(1988)114:1(13)Easa, S. M. (1988). “Improved method for locating centroid of earthwork.” Journal of Surveying Engineering, ASCE, Vol. 114, No. 1, pp. 13-25.DOI
5 
Kim, S. K. and Russell, J. S. (2003b). “Framework for an intelligent earthwork system: Part II. Task identification/scheduling and resource allocation methodology.” Automation in Construction, Vol. 12, No. 1, pp. 15-27.10.1016/S0926-5805(02)00033-XKim, S. K. and Russell, J. S. (2003b). “Framework for an intelligent earthwork system: Part II. Task identification/scheduling and resource allocation methodology.” Automation in Construction, Vol. 12, No. 1, pp. 15-27.DOI
6 
Marzouk, M. and Moselhi, O. (2004). “Fuzzy clustering model for estimating haulers' travel time.” Journal of Construction Engineering and Management, ASCE, Vol. 130, No. 6, pp. 878-886.10.1061/(ASCE)0733-9364(2004)130:6(878)Marzouk, M. and Moselhi, O. (2004). “Fuzzy clustering model for estimating haulers' travel time.” Journal of Construction Engineering and Management, ASCE, Vol. 130, No. 6, pp. 878-886.DOI
7 
Moselhi, O. and Alshibani, A. (2009). “Optimization of earthmoving operations in heavy civil engineering projects.” Journal of Construction Engineering and Management, ASCE, Vol. 135, No. 10, pp. 948-954. 10.1061/(ASCE)0733-9364(2009)135:10(948)Moselhi, O. and Alshibani, A. (2009). “Optimization of earthmoving operations in heavy civil engineering projects.” Journal of Construction Engineering and Management, ASCE, Vol. 135, No. 10, pp. 948-954.DOI
8 
Jeong, M. G., Kim, C. S., Kang, B. S. and Kim, J. W. (2000). “The design of control system for mobile objects using the GPS / GIS and wireless communication.” Korea Information Science Society, Vol. 27, No. 1, pp. 289-291.Jeong, M. G., Kim, C. S., Kang, B. S. and Kim, J. W. (2000). “The design of control system for mobile objects using the GPS / GIS and wireless communication.” Korea Information Science Society, Vol. 27, No. 1, pp. 289-291.Google Search
9 
Smith, S. (1999). “Earthmoving productivity estimation using linear regression techniques.” Journal of Construction Engineering and Management, ASCE, Vol. 125, No. 3, pp. 131-141.10.1061/(asce)0733-9364(1999)125:3(133)Smith, S. (1999). “Earthmoving productivity estimation using linear regression techniques.” Journal of Construction Engineering and Management, ASCE, Vol. 125, No. 3, pp. 131-141.DOI
10 
Guionmet, T., Guilemost, C. and Pateux, S. (2001). “Embedded multiple description cording for progressive image transmission over unrelizble channels.” Proc IEEE Trans., pp. 1005-1008.Guionmet, T., Guilemost, C. and Pateux, S. (2001). “Embedded multiple description cording for progressive image transmission over unrelizble channels.” Proc IEEE Trans., pp. 1005-1008.Google Search
11 
Tam, C. M., Tong, T. L. and Wong, B. L. (2007). “An integrated system for earthmoving planning.” Journal of Construction Management and Economics, ASCE, Vol. 25, pp. 1125-1135.10.1080/01446190701468836Tam, C. M., Tong, T. L. and Wong, B. L. (2007). “An integrated system for earthmoving planning.” Journal of Construction Management and Economics, ASCE, Vol. 25, pp. 1125-1135.DOI
12 
Yoon, J. G. and Han, K. J. (2002). “Develop of LBS (Loaction Based Service).” The Magazine of the IEEK 29(12), The Institute of Electronics Engineers of Korea, Vol. 29, No. 12, pp. 21-30.Yoon, J. G. and Han, K. J. (2002). “Develop of LBS (Loaction Based Service).” The Magazine of the IEEK 29(12), The Institute of Electronics Engineers of Korea, Vol. 29, No. 12, pp. 21-30.Google Search
13 
Zhang, H. (2008). “Multi-objectives simulation-optimization for earthworkmoving operations.” Automation in Construction, Vol. 18, No. 1, pp. 78-86.10.1016/j.autcon.2008.05.002Zhang, H. (2008). “Multi-objectives simulation-optimization for earthworkmoving operations.” Automation in Construction, Vol. 18, No. 1, pp. 78-86.DOI