Mobile QR Code QR CODE : Journal of the Korean Society of Civil Engineers
1 
Ahn, S. H., Kim, S. K. and Lee, K. H. (2016). “Development of a fleet management system for cooperation among construction equipment.” Journal of the Korean Society of Civil Engineers, Vol. 36, No. 3, pp. 573-586 (in Korean).10.12652/Ksce.2016.36.3.0573Ahn, S. H., Kim, S. K. and Lee, K. H. (2016). “Development of a fleet management system for cooperation among construction equipment.” Journal of the Korean Society of Civil Engineers, Vol. 36, No. 3, pp. 573-586 (in Korean).10.12652/Ksce.2016.36.3.0573DOI
2 
Choi, J. H. (2010). “Factors affecting selection & combination of earthwork equipments.” Journal of the Korean Institute of building construction, Vol. 10, No. 1, pp. 201-205 (in Korean).Choi, J. H. (2010). “Factors affecting selection & combination of earthwork equipments.” Journal of the Korean Institute of building construction, Vol. 10, No. 1, pp. 201-205 (in Korean).Google Search
3 
Chong, K. R. (2014). “An efficient algorithm for scheduling parallel machines with multiple servers.” Journal of the Korea Society of Computer and Information, Vol. 19, No. 6, pp. 101-108 (in Korean).10.9708/jksci.2014.19.6.101Chong, K. R. (2014). “An efficient algorithm for scheduling parallel machines with multiple servers.” Journal of the Korea Society of Computer and Information, Vol. 19, No. 6, pp. 101-108 (in Korean).10.9708/jksci.2014.19.6.101DOI
4 
Kim, S. K. (2014). “A multi-agent based cooperation system for an intelligent earthwork.” Journal of the Korean Society of Civil Engineers, Vol. 34, No. 5, pp. 1609-1623 (in Korean).10.12652/ksce.2014.34.5.1609Kim, S. K. (2014). “A multi-agent based cooperation system for an intelligent earthwork.” Journal of the Korean Society of Civil Engineers, Vol. 34, No. 5, pp. 1609-1623 (in Korean).10.12652/ksce.2014.34.5.1609DOI
5 
Ko, D. J. and Lee, C. U. (2010). “A dispatching policy for stochastic scheduling simulation considering machine breakdowns.” Journal of the Korea Society of Computer and Information, Vol. 15, No. 8, pp. 181-192 (in Korean).10.9708/jksci.2010.15.8.181Ko, D. J. and Lee, C. U. (2010). “A dispatching policy for stochastic scheduling simulation considering machine breakdowns.” Journal of the Korea Society of Computer and Information, Vol. 15, No. 8, pp. 181-192 (in Korean).10.9708/jksci.2010.15.8.181DOI
6 
Lee, J. E. (2014). “Study on reducing logistics costs and inventory control system according to facilities integration in the closed - Loop Supply Chain Environment.” Journal of the Korea Industrial Information Systems Research, Vol. 19, No. 5, pp. 81-90 (in Korean).10.9723/jksiis.2014.19.5.081Lee, J. E. (2014). “Study on reducing logistics costs and inventory control system according to facilities integration in the closed - Loop Supply Chain Environment.” Journal of the Korea Industrial Information Systems Research, Vol. 19, No. 5, pp. 81-90 (in Korean).10.9723/jksiis.2014.19.5.081DOI
7 
Lee, S. J., Choi, H. R. and Lee, H. C. (2011). “Platform development of adaptive production planning to improve efficiency in manufacturing system.” Journal of the Korea Society Industrial Information System, Vol. 16, No. 2, pp. 73-83 (in Korean).10.9723/jksiis.2011.16.2.073Lee, S. J., Choi, H. R. and Lee, H. C. (2011). “Platform development of adaptive production planning to improve efficiency in manufacturing system.” Journal of the Korea Society Industrial Information System, Vol. 16, No. 2, pp. 73-83 (in Korean).10.9723/jksiis.2011.16.2.073DOI
8 
Markiz, N. and Jarade, A. (2012). “A decision-support model utilizing a linear cost optimization approach for heavy equipment selection.” Journal of Construction Engineering and Management, ASCE. pp. 100-109.Markiz, N. and Jarade, A. (2012). “A decision-support model utilizing a linear cost optimization approach for heavy equipment selection.” Journal of Construction Engineering and Management, ASCE. pp. 100-109.Google Search
9 
MIT Technology Review (2014). “Change the manufacturing industry by man-robot cooperation.” TECH & Beyond, Vol. 20, http://techm.kr/ bbs/board.php?bo_table=article&wr_id=456.MIT Technology Review (2014). “Change the manufacturing industry by man-robot cooperation.” TECH & Beyond, Vol. 20, http://techm.kr/ bbs/board.php?bo_table=article&wr_id=456.Google Search
10 
Moselhi, O. and Alshibani, A. (2009). “Optimization of earthmoving operations in heavy civil engineering projects.” J. Constr. Eng. Manag, Vol. 135, No. 10, pp. 948-954.10.1061/(ASCE)0733-9364(2009)135:10(948)Moselhi, O. and Alshibani, A. (2009). “Optimization of earthmoving operations in heavy civil engineering projects.” J. Constr. Eng. Manag, Vol. 135, No. 10, pp. 948-954.10.1061/(ASCE)0733-9364(2009)135:10(948)DOI
11 
Seo, J. H., Ko, H. H., Kim, S. S. and Baek, J. G. (2011). “Dispatching to minimize flow time for production efficiency in non-identical parallel machines environment with rework.” Journal of the Korean Institute of Industrial Engineers, Vol. 37, No. 4, pp. 367-381 (in Korean).10.7232/JKIIE.2011.37.4.367Seo, J. H., Ko, H. H., Kim, S. S. and Baek, J. G. (2011). “Dispatching to minimize flow time for production efficiency in non-identical parallel machines environment with rework.” Journal of the Korean Institute of Industrial Engineers, Vol. 37, No. 4, pp. 367-381 (in Korean).10.7232/JKIIE.2011.37.4.367DOI
12 
Son, H. J., Cho, S. Y. and Kim, C. Y. (2007). “Optimization of heavy equipment operations on a construction site using simulation.” Journal of the Korean Society of Civil Engineers, Vol. 27, No. 5, pp. 579-588 (in Korean).Son, H. J., Cho, S. Y. and Kim, C. Y. (2007). “Optimization of heavy equipment operations on a construction site using simulation.” Journal of the Korean Society of Civil Engineers, Vol. 27, No. 5, pp. 579-588 (in Korean).Google Search