Mobile QR Code QR CODE : Journal of the Korean Society of Civil Engineers
1 
BuildingSMART,http://www.buildingsmart.or.kr/overview/BIM.aspx (accessed: July 23, 2015) (in Korean).BuildingSMART,http://www.buildingsmart.or.kr/overview/BIM.aspx (accessed: July 23, 2015) (in Korean).Google Search
2 
Choi, J. S., Kim, I. H., Jo, C. W. and Choi, J. H. (2009). “Application status of domestic architectural industry of open BIM and development direction.” International Juornal of CAD/CAM, Vol. 14, No. 6, pp. 355-363 (in Korean).Choi, J. S., Kim, I. H., Jo, C. W. and Choi, J. H. (2009). “Application status of domestic architectural industry of open BIM and development direction.” International Juornal of CAD/CAM, Vol. 14, No. 6, pp. 355-363 (in Korean).Google Search
3 
HOUD (2011). “BIM technology progress: current status and application cases.” HOUD Report, No. 26 (in Korean).HOUD (2011). “BIM technology progress: current status and application cases.” HOUD Report, No. 26 (in Korean).Google Search
4 
Hwang, S. H., Jun, J. P., Seo, J. W. and Hwang, G. W. (2014). “Civil and infra BIM.” Journal of the Architectural Institute of Korea, Vol. 15, No. 11, pp. 97-104 (in Korean).Hwang, S. H., Jun, J. P., Seo, J. W. and Hwang, G. W. (2014). “Civil and infra BIM.” Journal of the Architectural Institute of Korea, Vol. 15, No. 11, pp. 97-104 (in Korean).Google Search
5 
Jeong, Y. S. (1999). “Analytical validation of a CIC framework.” Journal of the Architectural Institute of Korea, Vol. 15, No. 11, pp. 97-104 (in Korean).Jeong, Y. S. (1999). “Analytical validation of a CIC framework.” Journal of the Architectural Institute of Korea, Vol. 15, No. 11, pp. 97-104 (in Korean).Google Search
6 
Ju, K. B. (2013). “BIM in Civil infrastructure sector.” KICT Construction Brief (in Korean).Ju, K. B. (2013). “BIM in Civil infrastructure sector.” KICT Construction Brief (in Korean).Google Search
7 
Kang, L. S., Kim, S. G., Kim, H. S. and Moon, H. S. (2011). “BIM application for civil enginerring project in planning and design phases.” Journal of KIMBIM, Vol. 1, No. 1, pp. 26-31 (in Korean).Kang, L. S., Kim, S. G., Kim, H. S. and Moon, H. S. (2011). “BIM application for civil enginerring project in planning and design phases.” Journal of KIMBIM, Vol. 1, No. 1, pp. 26-31 (in Korean).Google Search
8 
Lee, S. Y. and Jo, Y. S. (2011). “A study on the application methodology of set-based design approach of outrigger system based on lean process.” Korea Journal of Construction Engineering and Management, Vol. 12, No. 4, pp. 50-58 (in Korean).10.6106/KJCEM.2011.12.4.50Lee, S. Y. and Jo, Y. S. (2011). “A study on the application methodology of set-based design approach of outrigger system based on lean process.” Korea Journal of Construction Engineering and Management, Vol. 12, No. 4, pp. 50-58 (in Korean).DOI
9 
Ministry of Land, Infrastructure, and Transport (2010). “BIM guide for architectural projects” (in Korean).Ministry of Land, Infrastructure, and Transport (2010). “BIM guide for architectural projects” (in Korean).Google Search
10 
Public Procurement Survice (2015). “BIM guide for facility projects” (in Korean).Public Procurement Survice (2015). “BIM guide for facility projects” (in Korean).Google Search
11 
Saaty, T. L. (1980). “Analytic hierarchy process.” McGraw-Hill, New York.Saaty, T. L. (1980). “Analytic hierarchy process.” McGraw-Hill, New York.Google Search
12 
Seo, M. B. and Ju, K. B. (2012). “Strategies to revitalize BIM (Building Information Modeling) by the survey questionnaires from design experts in field of civil engineering.” International Journal of contents, Vol. 12, No. 1, pp. 446-457 (in Korean).10.5392/JKCA.2012.12.11.446Seo, M. B. and Ju, K. B. (2012). “Strategies to revitalize BIM (Building Information Modeling) by the survey questionnaires from design experts in field of civil engineering.” International Journal of contents, Vol. 12, No. 1, pp. 446-457 (in Korean).DOI