Mobile QR Code QR CODE : Journal of the Korean Society of Civil Engineers
1 
Choi, M. G., Lee, J. S. and Song, C. Y. (2007). "Applicability of a steel pipe support system for a temporary braced cut." Proc. of the KSCE Conf., KSCE, pp. 2724-2727 (in Korean).
2 
Choudhury, S. S., Deb, K. and Sengupta, A. (2013). "Estimation of design parameters for braced excavation: numerical study." International Journal of Geomechanics, Vol. 13, No. 3, pp. 234-247.DOI
3 
Jeong, S. S. Kim, Y. H. and Kim, M. M. (2011). "Failure case study of tieback wall in urban area" Intrnational Symposium on backwards problem in geotechnicla engineering and monitoring of Geo- Construction, pp. 1-7.
4 
Jung, S. I., Kang, B. M., Jeon, S. J. and Han, M. Y. (2012). "Study on design optimization for high strength steel pipe strut." Proc. of the KSCE Conf., KSCE, pp. 519-522 (in Korean).
5 
Kent, L. L. (2012). "ANSYS Tutorial Release 14" Schroff Development co.
6 
Kim, K. L., Kim, Y. S. and Kim, S. S. (2013). "A study on securing safety through behavior analysis of earth retaining wall." Journal of Korean Geosynthetics Society, Vol. 12, No. 4, December, 2013 pp. 11-19 (in Korean).DOI
7 
Kim, S. Y., Whang, S. W., Lee, Y. D., Shin, Y. S. and Kim, G. H. (2017). "Comparison of high-strength steel pipe and H-shaped steel in the strut of a braced wall system." Building Structures and Materials, Vol. 16, No. 1, pp. 179-184.DOI
8 
Kim, Y. M., Hong, C. P. and Jeong, Y. S. (2003). "Behavior of earth retaining walls for deep braced excavation and removal strut." Proc. of the KSCE Conf., KSCE, pp. 3796-3799.
9 
Lee, J. W., Noh, M. H. and Lee, S. Y. (2018). "In-plane behaviors of high-strength steel pipe struts under abnormal behaviors." Journal Korean Soc. Adv. Comp. Struc., Vol. 9, No. 2, pp. 64-71 (in Korean).DOI
10 
Lim, S. H., Han, M. Y., Kim, S. B. and Jeon, S. J. (2014). "Buckling analysis of earth retaining support used by PHC Pile Struts." Proc. of the KCI Spring Conf., KCI, pp. 1-2 (in Korean).
11 
Na, S. M., Lee, J. G. and Lee, Y. J. (2008). "A case study on high strength steel pipe strut in the domestic and foreign areas." Korean Geotechnical Society Magazine, Vol. 24, No. 3, pp. 34-43 (in Korean).
12 
Park, J. B., Park, Y. B., Shim, Y. J. and Im, H. S. (2012). "Development of a construction risk maintenance of the bracing-free type strut system." LHI, Land & Housing Institute (in Korean).
13 
Yang, G. S. and Kim, M. M. (1997). "Analysis of perimetrical ground settlement behavior for deep excavations in urban areas." Journal of the Korean Geotechnical Society, Vol. 13, No. 2, pp. 101-12 (in Korean).
14 
Yoo, C. S., Na, S. M., Lee, J. G. and Jang, D. W. (2010). "Numerical investigation on the behavior of braced excavation supported by steel pipe struts." Journal of the Korean Geotechnical Society, Vol. 26, No. 6, pp. 45-56 (in Korean).