Mobile QR Code QR CODE : Journal of the Korean Society of Civil Engineers
1 
Cho, H. H. and Do, G. Y. (2005). "Improvement of contract sum adjustment method caused by price fluctuation using construction cost index." Journal of Korea institute of Construction Engineering and Management, Vol. 6, No. 1, pp. 162-168 (in Korean).
2 
Jeon, G. Y., Cho, J. Y. and Huh, Y. (2013). "Development of approximate cost estimate model for aqueduct bridges restoration- focusing on comparison between regression analysis and case- based reasoning." Journal of the Korean Society of Civil Engineers, KSCE, Vol. 33, No. 4, pp. 1693-1705 (in Korean).DOI
3 
Ji, Y. I. (2012). Problem analysis and improvement schemes to the application of producer price index for construction price fluctuations, Master's degree, Chung-Ang University (in Korean).
4 
Jung, Y. J. and Kim, Y. J. (2016). "Relationship between energy consumption and operational variables at wastewater treatment plant." Journal of Korean Society on Water Environment, Vol. 32, No. 3, pp. 253-260 (in Korean).DOI
5 
Kang, S. H. (2010). A study on approximate construction cost estimating of steel box girder bridge, Master's degree, Korea Maritime University (in Korean).
6 
Kang, T. K., Back, S. H., Kim, C. W. and Cho, H. H. (2015). "Improvement of construction cost index against the change of national basic statistic." Korean Journal of Construction Engineering and Management, Vol. 16, No. 4 , pp. 21-29 (in Korean).DOI
7 
Kim, S. B. and Cho, J. h. (2013). "Development of the approximate cost estimating model using statistical inference for psc box girder bridge constructed by the incremental launching method." Journal of the Korean Society of Civil Engineers, KSCE, Vol. 33, No. 2, pp. 781-790 (in Korean).DOI
8 
Kim, T. W. and Oh, J. S. (2015). "Estimation of AADT using multiple linear regression in isolate area." Journal of the Korean Society of Civil Engineers, KSCE, Vol. 35, No. 4, pp. 887-896 (in Korean).DOI
9 
Lee, J. K., Lee, H. S., Park. M. S., Kim, S. Y. and Ji, S. Y. (2010). "A statistical forecasting model for building construction cost index using regression analysis." Journal of National University Student Conference, Korean Institute of Construction Engineering and Management, pp. 52-56 (in Korean).
10 
Park, M. S., Seong, K. H., Lee, H. S., Ji, S. H. and Kim, S. Y. (2010). "Schematic cost estimation method using case-based reasoning : Focusing on determining attribute weight." Korean Institute of Construction Engineering and Management, Vol. 11, No. 4, pp. 22-31 (in Korean).DOI