Mobile QR Code QR CODE : Journal of the Korean Society of Civil Engineers
1 
An, B. Y. and Park, T. I. (2019). "Case study on the construction standard production rate for operation and maintenance technology." Proceedings of the Korean Institute of Building Construction Conference, The Korean Institute of Building Construction, pp. 250-251.
2 
Choi, S. I., Lee, B. N., Lee, S. W. and Choi, M. S. (2006). A study on the evaluation and improvement of the cost system in Korea, Construction & Economy Research Institute of Korea (in Korean).
3 
Construction & Economy Research Institute of Korea (CERIK) (2018). Analysis on public cost status and responding policy recommendations (in Korean).
4 
Ha, M. S. (2008). A study on the improvement of historical cost data for the application of rational construction cost, M.S. Dissertation, University of Kyung-il, Gyeongsan, Korea (in Korean).
5 
Kim, W. T., Choi, S. I. and Lee, B. N. (2010). A study on the reasonable improvement of cost estimating method for construction projects, Construction & Economy Research Institute of Korea (in Korean).
6 
Kim. S. B. (2014). A study on the improvement of performance cost system in Korea, Korea Institute of Construction Engineering and Management (in Korean).
7 
Ministry of Land, Infrastructure and Transport (MOLIT) (2018a). Actual construction cost& construction standard estimating management rules (in Korean).
8 
Ministry of Land, Infrastructure and Transport (MOLIT) (2018b). Construction standard cost (in Korean).
9 
Ministry of Land, Infrastructure and Transport (MOLIT) (2018c). Construction standard estimating (in Korean).