Mobile QR Code QR CODE : Journal of the Korean Society of Civil Engineers

References

1 
Alanjari, P., RazaviAlavi, S. R. and AbouRizk, S. (2015). “Hybrid genetic algorithm-simulation optimization method for proactively planning layout of material yard laydown.” Journal of Construction Engineering and Management, KICEM, Vol. 141, No. 10.DOI
2 
Hyun, B. E., Kim, C. E., Rho, J. P. and Lee, S. T. (2003). New logistics management, Yulgok Publishing House, Seoul, Korea (in Korean).URL
3 
Im, K. S., Han, S. H., Jung, D. Y., Ryu, C. K. and Choi, S. K. (2008). “Inventory management in construction operations involving on-site fabrication of raw materials.” Korean Journal of Construction Engineering and Management, KICEM, Vol. 9, No.1, pp. 187-198 (in Korean).URL
4 
Jacobs, F. R., Berry, W., Whybark, D. C. and Vollmann, T. (2005). Manufacturing planning and control for supply chain management, McGraw-Hill, New York, USA.URL
5 
Jung, D. Y., Park, S. H., Kwak, S. N., Kim, H. K. and Han, S. H. (2006). “Optimal inventory management for rebar fabrication process in construction process.” Conference of the Korean Journal of Construction Engineering and Management, KICEM, pp. 702-707 (in Korean).URL
6 
Kim, S. H., Kim, G. H. and Kang, K. I. (2004). “A study on the effective inventory management by optimizing lot size in building construction.” Proceedings of the Korean Institute of Architectural Engineering, Vol. 4, No. 2, pp. 73-80 (in Korean).DOI
7 
Kim, Y. H. (2014). Economic inventory management methodology of construction project considering stock yard size, Master’s Thesis, Gyeongsang National University (in Korean).URL
8 
Lee, J. M., Yu, J. H. and Kim, C. D. (2007). “A economic order quantity (EOQ) determination method considering stock yard size.” Korean Journal of Construction Engineering and Management, KICEM, No. 9, pp. 549-552 (in Korean).URL
9 
Lee, J. M., Yu, J. H., Kim, C. D., Lee, K. J. and Lim, B. S. (2008). “Order point determination method considering materials demand variation of construction site.” Structure of the Proceedings of the Korean Institute of Architecture, Vol. 24, No. 10, pp. 117-125 (in Korean).URL
10 
Lee, S. B. (2004). “A study on optimal lead time selection measures of the construction materials.” Proceedings of the Korean Institute of Architectural Engineering, Vol. 4, No. 1, pp. 105-110 (in Korean).DOI
11 
Lee, S. H. (2012). The research of optimal inventory management using simulation method, Master’s Thesis, Kwangwoon University, Seoul (in Korean).URL
12 
Tommelein, I. D. and Weissenberger, M. (1999). “More just-in-time: Location of buffers in stuctural steel supply and construction proesses.” 7th Annual Conference of the International Group for Lean Construction, Berkeley, CA, USA, pp. 26-28.URL
13 
Yun, J. S., Yu, J. H. and Kim, C. D. (2011). “Economic order quantity (EOQ) determination process for construction material considering demand variation and stockyard availability.” Korean Journal of Construction Engineering and Management, KICEM, Vol. 12, No. 1, pp. 33-42 (in Korean).DOI