JKSCE
KSCE JOURNAL OF CIVIL AND
ENVIRONMENTAL ENGINEERING RESEARCH
KSCE
Contact
ISSN : 1015-6348 (Print)
ISSN : 2799-9629 (Online)
Mobile QR Code
Journal of the Korean Society of Civil Engineers
ISO Journal Title
KSCE J. Civ. Environ. Eng. Res.
Open Access, Bi-monthly
Main Menu
Main Menu
최근호
Current Issue
논문집
Journal Archive
저널소개
About Journal
편집위원회
Editorial Board
논문투고안내
For Authors and Reviewers
윤리규정
Publication Ethics
Principles of Transparency and Best Practice
Business Model
연락처
Contact Info
논문투고
E-submission
Journal Search
Home
All Issues
2023-02
(v.43 n.1)
10.12652/Ksce.2023.43.1.0091
Journal XML
XML
PDF
INFO
REF
References
1
Al-Bahar, J. F. (1989). Risk management in construction projects: A systemic analytical approach for contractors, Ph.D. Dissertation, University of California Berkeley, Berkeley, California, USA.
2
Choi, J. W. (2015). An analysis on regional differences of major delay factors in overseas architectural projects, Master Dissertation, Hanyang University, Seoul, Korea (in Korean).
3
kakao (2020). Kakao hangul analyzer Ⅲ, Available at: https://github.com/kakao/khaiii (Accessed: October 18, 2022).
4
Kang, H. B. and Yi, J. S. (2018). “An analysis of public text data in construction disaster cases using Word2Vec-based data visualization.” Autumn Annual Conference of AIK, 2018, Architectural Institute of Korea, Vol. 38, No. 2, pp. 567-570 (in Korean).
5
Kang, L. S., Kim, C. H. and Kwak, J. M. (2002). “Analysis for the importance of risk factors through the project life cycle.” Journal of the Architectural Institute of Korea Structure & Construction, Vol. 17, No. 8, pp. 103-110 (in Korean).
6
Kim, J. S. (2022a). Analysis of project delay using big data, Master Dissertation, Hanyang University, Seoul, Korea (in Korean).
7
Kim, E. H. (2022b). Automatic classification on the work breakdown structure of apartment construction projects: A machine learning approach, Master Dissertation, Sungkyunkwan University, Seoul, Korea (in Korean).
8
Kim, J. S. and Kim, B. S. (2019). “Characteristics analysis of seasonal construction site fall accident using text mining.” Korean Journal of Construction Engineering and Management, Vol. 20, No. 3, pp. 113-121 (in Korean).
9
Kim, K. H., Kim, K. H., Lee, Y. S. and Kim, J. J. (2008). “A study about influence of risk factors in relation to construction cost increase and schedule delay on the reinforced concrete construction.” Journal of the Architectural Institute of Korea Structure & Construction, Vol. 24, No. 5, pp. 165-172 (in Korean).
10
Lee, J. H. and Yi, J. S. (2017). “Predicting project’s uncertainty risk in the bidding process by integrating unstructured text data and structured numerical data using text mining.” Applied Sciences, Vol. 7, No. 11, pp. 1-15.
11
Lee, J. S., Kim, D. Y., Lee, C. J., Lee, J. H. and Han, S. H. (2018). “A research for clustering of conflict in public construction project.” Korean Journal of Construction Engineering and Management, Vol. 19, No. 2, pp. 61-72 (in Korean).
12
Marzouk, M. and Enaba, M. (2019). “Text analytics to analyze and monitor construction project contract and correspondence.” Automation in Construction, Vol. 98, pp. 265-274.
13
Mikolov, T., Chen, K., Corrado, G. and Dean, J. (2013). Efficient estimation of word representations in vector space, Available at: https://arxiv.org/abs/1301.3781 (Accessed: October 18, 2022).
14
Park, E. L. and Cho, S. Z. (2014). “KoNLPy: Koreannatural language processing in Python.” Annual Conference on Human and Language Technology, pp. 133-136 (in Korean).
15
Park, K. C. and Kim, H. K. (2021). “Analysis of seasonal importance of construction hazards using text mining.” Journal of the Korean Society of Civil Engineers, KSCE, Vol. 41, No. 3, pp. 305-316 (in Korean).
16
Seo, D. H. (2019). Text mining with python, bjpublic, Seoul, Korea (in Korean).
17
Shin, Y. J. and Chi, S. H. (2014). “Tacit knowledge informatization from text-based construction data.” Annual Conference of KICEM, 2014, Korean Journal of Construction Engineering and Management, pp. 31-34 (in Korean).
18
Smilkov, D., Thorat, N., Nicholson, C., Rief, E., Viegas, F. and Wattenberg, M. (2016). Embedding projector: Interactive visualization and interpretation of embeddings, Available at: https://arxiv.org/abs/1611.05469 (Accessed: October 18, 2022).
19
Son, B. Y. and Lee, E. B. (2019). “Using text mining to estimate schedule delay risk of 13 oshore oil and gas EPC case studies during the bidding process.” Energies, Vol. 12, No. 10, pp. 1-25.
20
Wang, G., Liu, M., Cao, D. and Tan D. (2020). “Identifying high- frequency-low-severity construction safety risks: An empirical study based on official supervision reports in Shanghai.” Engineering, Construction and Architectural Management, Vol. 29, No. 2, pp. 940-960.
21
Yang, H. S. (2020). Comparison of recognition on the risks affecting schedule delays and cost overruns in overseas civil construction projects, Master Dissertation, Hanyang University, Seoul, Korea (in Korean).
22
Yang, S. W. and Lim, H. C. (2021). “Semantic network analysis on the research trends of construction accident.” Journal of the Architectural Institute of Korea, Vol. 37, No. 6, pp. 231-236 (in Korean).
23
Yoon, Y. S., Suh, S. W., Park, M. S. and Jang, M. H. (2008). “Construction process based schedule risk management system.” Construction Engineering and Management, Vol. 9, No. 4, pp. 101-110 (in Korean).