Akal, A. Y., El-Maaty, A. E. A. and El-Hamrawy, S. (2017). “Mapping the causes of time, cost overruns and quality shortfall in Egyptian Public Highway Projects.” European Business & Management, SciencePG, Vol. 3, No. 6, pp. 120-126, https://doi.org/10.11648/j.ebm.20170306.14.DOI
2 
Akinradewo, O., Aigbavboa, C., Oke, A., Coffie, H. and Ogunbayo, B. (2022). “Unearthing causative factors of cost overrun on ghanaian road projects.” The Baltic Journal of Road and Bridge Engineering, Riga Technical University, Vol. 17, No. 4, pp. 171-188, https://doi.org/10.7250/bjrbe.2022-17.584.DOI
3 
Alfakhri, A., Ismail, A., Muhamad, A. K., Arhad, I. and Irtema, H. (2017). “A conceptual model of delay factors affecting road construction projects in Libya.” Journal of Engineering Science and Technology, Taylor’s University, Vol. 12, No. 12, pp. 3286-3298.URL
4 
Al-Hazim, N. and Abusalem, Z. (2015). “Delay and cost overrun in road construction projects in Jordan.” International Journal of Engineering and Technology, SPC, Vol. 4, No. 2, pp. 288-293, https://doi.org/10.14419/ijet.v4i2.4409.DOI
5 
Ammar, T., Abdel-Monem, M. and El-Dash, K. (2022). “Risk factors causing cost overruns in road networks.” Ain Shams Engineering Journal, Ain Shams University, Vol. 13, No. 5, 101720, https://doi.org/10.1016/j.asej.2022.101720.DOI
6 
Anigbogu, N. A., Ahmad, Z. B. and Molwus, J. J. (2019). “Cost overruns on federal capital territory authority road construction projects.” FUTY Journal of the Environment, Federal University, Vol. 13, No. 1, pp. 1-14.URL
7 
Aziz, R. F. and Abdel-Hakam, A. A. (2016). “Exploring delay causes of road construction projects in Egypt.” Alexandria Engineering Journal, Elsevier, Vol. 55, No. 2, pp. 1515-1539, https://doi.org/10.1016/j.aej.2016.03.006.DOI
8 
Chamuwange, S. K. and Ning, Y. (2022). “Identifying the factors affecting the cost management of road construction projects in Tanzania.” Journal of Civil, Construction and Environmental Engineering, SciencePG, Vol. 7, No. 3, pp. 35-39, https://doi.org/10.11648/j.jccee.20220703.13.DOI
9 
Creedy, G. D., Skitmore, M. and Wong, J. K. (2010). “Evaluation of risk factors leading to cost overrun in delivery of highway construction projects.” Journal of Construction Engineering and Management, ASCE, Vol. 136, No. 5, pp. 528-537, https://doi.org/10.1061/(ASCE)CO.1943-7862.0000160.DOI
10 
Dolage, D. A. R. and Dasantha, O. M. C. (2022). “Critical factors affecting cost overrun in foreign funded road construction projects in Sri Lanka.” Engineer, The Institution of Engineers, Sri Lanka, Vol. 55, No. 2, pp. 21-30, https://doi.org/10.4038/engineer.v55i2.7505.DOI
11 
Elawi, G. S. A., Algahtany, M. and Kashiwagi, D. (2016). “Owners’ perspective of factors contributing to project delay: case studies of road and bridge projects in Saudi Arabia.” Procedia Engineering, Elsevier, Vol. 145, pp. 1402-1409, https://doi.org/10.1016/j.proeng.2016.04.176.DOI
12 
Huo, T., Ren, H., Cai, W., Shen, G. Q., Liu, B., Zhu, M. and Wu, H. (2018). “Measurement and dependence analysis of cost overruns in megatransport infrastructure projects: case study in Hong Kong.” Journal of Construction Engineering and Management, ASCE, Vol. 144, No. 3, 05018001, https://doi.org/10.1061/(ASCE)CO.1943-7862.0001444.DOI
13 
Kaliba, C., Muya, M. and Mumba, K. (2009). “Cost escalation and schedule delays in road construction projects in Zambia.” International Journal of Project Management, Elsevier, Vol. 27, No. 5, pp. 522-531, https://doi.org/10.1016/j.ijproman.2008.07.003.DOI
14 
Kim, S. J. and Kim, N. G. (2013). “Improvement on the total project cost management system for public construction project in civil engineering field.” Proceedings of the 40th KIISE Fall Conference, pp. 17-18 (in Korean).URL
15 
Korea Development Institute (KDI). (2021). A Preliminary Feasibility Study of the Five-year Road Plan (in Korean).URL
16 
Korea Institute of Civil Engineering and Building Technology (KICT). (2020). A Study on the Efficient Operation and Utilization of Post-Construction Evaluation (in Korean).URL
17 
Kurniawan, D., Mairizal, Masril, Sam, A. R. M. and Abd Majid, M. Z. (2022). “Critical Risk Factor Affecting Cost Overrun in Highway Project of West Sumatera.” Proceedings of IOP Conference Series: Earth and Environmental Science, IOP, Vol. 1022, No. 1, 012013, https://doi.org/10.1088/1755-1315/1022/1/012013.DOI
18 
Lee, Y. M. (2013). Study on Cost Increasing Factor of Road in the Construction Phase, Msc. Dissertation, Pukyong National University (in Korean).URL
19 
Ministry of Economy and Finance (MOEF). (2022). Total Project Cost Management Guidelines, Available at: https://www.law. go.kr/admRulLsInfoP.do;jsessionid=fDQvsD4SbBizzxkOoIMheJ5rs0KRANU5w5N6IMna1IXqailo9TkZVMGETNQad8V6.de_kl_a1_servlet_LSW2?admRulSeq=2100000071778 (Accessed: June 6, 2023) (in Korean).DOI
20 
Ministry of Land Infrastructure and Transport (MOLIT). (2022). post-Construction Evaluation Guidelines, Available at: https://law.go.kr/admRulLsInfoP.do?chrClsCd=&admRulSeq =2100000203300 (Accessed: June 6, 2023) (in Korean).DOI
21 
Na, S. Y., Lee, D. H. and Kim, H. W. (2022). “Impact of highway construction on the regional economy: Gangil-Chuncheon Highway.” Journal of the Korean Society of Industry Convergence, KSIC, Vol. 25, No. 6, pp. 1183-1190, https://doi.org/10.21289/KSIC.2022.25.6.1183 (in Korean).DOI
22 
Santoso, D. S. and Soeng, S. (2016). “Analyzing delays of road construction projects in Cambodia: Causes and effects.” Journal of Management in Engineering, ASCE, Vol. 32, No. 6, 05016020, https://doi.org/10.1061/(ASCE)ME.1943-5479.0000467.DOI
23 
Seboru, M. A. (2015). “An investigation into factors causing delays in road construction projects in Kenya.” American Journal of Civil Engineering, Vol. 3, No. 3, pp. 51-63, https://doi.org/10.11648/j.ajce.20150303.11.DOI
24 
Sohu, S., Halid, A., Nagapan, S., Fattah, A., Latif, I. and Ullah, K. (2017). “Causative factors of cost overrun in highway projects of Sindh province of Pakistan.” Proceedings of IOP Conference Series: Materials Science and Engineering, IOP, Johor Bahru, Malaysia, Vol. 271, No. 1, 012036, https://doi.org/10.1088/1757-899X/271/1/012036.DOI
25 
Woo, S. K., Lee, Y. H., Chang, C. K. and Lee, S. W. (2012). “A study on analysis of productive construction project and influential elements for public owner’s perspective: focused on highway construction.” KSCE Journal of Civil and Environmental Engineering Research, KSCE, Vol. 32, No. 6D, pp. 645-653, https://doi.org/10.12652/Ksce.2012.32.6D.645 (in Korean).DOI
26 
Yoon, B. H. (2009). Risk Assessment of Cost Increasing by Change Orders of Road Projects, Msc. Dissertation, Yonsei University (in Korean).URL
27 
Zafar, I., Yousaf, T. and Ahmed, D. S. (2016). “Evaluation of risk factors causing cost overrun in road projects in terrorism affected areas Pakistan a case study.” KSCE Journal of Civil Engineering, KSCE, Vol. 20, No. 1, pp. 1613-1620, https://doi.org/10.1007/s12205-015-0348-6.DOI