Mobile QR Code QR CODE : Journal of the Korean Society of Civil Engineers

References

1 
Aliramezani, M., Koch, C. R. and Shahbakhti, M. (2022). “Modeling, diagnostics, optimization, and control of internal combustion engines via modern machine learning techniques: A review and future directions.” Progress in Energy and Combustion Science, Elsevier, Vol. 88, 100967, https://doi.org/10.1016/j.pecs.2021.100967.DOI
2 
Al-Refaie, A. M., Alashwal, A. M., Abdul-Samad, Z. and Salleh, H. (2021). “Weather and labor productivity in construction: a literature review and taxonomy of studies.” International Journal of Productivity and Performance Management, Emerald Publishing Limited, Vol. 70, No. 4, pp. 941-957, https://doi.org/10.1108/IJPPM-12-2019-0577 .DOI
3 
Bressan, T. S., de Souza, M. K., Girelli, T. J. and Junior, F. C. (2020). “Evaluation of machine learning methods for lithology classification using geophysical data.” Computers and Geosciences, Elsevier, Vol. 139, 104475, https://doi.org/10.1016/j.cageo.2020.104475.DOI
4 
Choi, S. Y. (2020). “Comparison analysis of deaths in construction industry in OECD countries.” Construction and Economy Research Institute of Korea (in Korean).URL
5 
Choi, S. J., Kim, J. H. and Jung, K. (2021). “Development of prediction models for fatal accidents using proactive information in construction sites.” Journal of the Korean Society of Safety, KOSOS, Vol. 36, No. 3, pp. 31-39, https://doi.org/10.14346/JKOSOS.2021.36.3.31 (in Korean).DOI
6 
Christian, H., Agus, M. P. and Suhartono, D. (2016). “Single document automatic text summarization using term frequency- inverse document frequency (TF-IDF).” ComTech: Computer, Mathematics and Engineering Applications, Binus University, Vol. 7, No. 4, pp. 285-294, https://doi.org/10.21512/comtech.v7i4.3746.DOI
7 
Chun, Y. G., Lee, G. U., Kim, Y. T. and Hyun, C. T. (2001). “A study on the estimation standard of optimal construction duration for reinforced concrete apartment house.” Proceedings of 2nd Korea Institute of Construction Engineering and Management, KICEM, Seoul, Korea, pp. 531-534 (in Korean).URL
8 
Clegg, S., Killen, C. P., Biesenthal, C. and Sankaran, S. (2018). “Practices, projects and portfolios: Current research trends and new directions.” International Journal of Project Management, Elsevier, Vol. 36, No. 5, pp. 762-772, https://doi.org/10.1016/j.ijproman.2018.03.008.DOI
9 
Durdyev, S. and Hosseini, M. R. (2020). “Causes of delays on construction projects: a comprehensive list.” International Journal of Managing Projects in Business, Emerald Publishing Limited, Vol. 13, No. 1, pp. 20-46, https://doi.org/10.1108/IJMPB-09-2018-0178.DOI
10 
El-Sayegh, S. M., Manjikian, S., Ibrahim, A., Abouelyousr, A. and Jabbour, R. (2021). “Risk identification and assessment in sustainable construction projects in the UAE.” International Journal of Construction Management, Taylor & Francis, Vol. 21, No. 4, pp. 327-336, https://doi.org/10.1080/15623599.2018.1536963.DOI
11 
Glenigan (2015). UK Industry Performance Report.URL
12 
Ha, S. G., Kim, T. H., Son, K. Y., Kim, J. M. and Son, S. H. (2018). “Quantification model development of human accidents on external construction site by applying probabilistic method.” Journal of the Korea Institute of Building Construction, KIC, Vol. 18, No. 6, pp. 611-619, https://doi.org/10.5345/JKIBC.2018.18.6.611 (in Korean).DOI
13 
Islam, M. S., Nepal, M. P., Skitmore, M. and Kabir, G. (2019). “A knowledge-based expert system to assess power plant project cost overrun risks.” Expert Systems with Applications, Elsevier, Vol. 136, No. 1, pp. 12-32, https://doi.org/10.1016/j.eswa.2019.06.030.DOI
14 
Jitpaiboon, T., Smith, S. M. and Gu, Q. (2019). “Critical success factors affecting project performance: An analysis of tools, practices, and managerial support.” Project Management Journal, PMI, Vol. 50, No. 3, pp. 271-287, https://doi.org/10.1177/8756972819833545.DOI
15 
Jo, J. H. (2012). “A study on the causes analysis and preventive measures by disaster types in construction fields.” Journal of the Korea Safety Management & Science, Vol. 14, No. 1, pp. 7-13, https://doi.org/10.12812/KSMS.2012.14.1.007 (in Korean).DOI
16 
Kang, S. H., Jung, Y. S., Kim, S. R., Lee, I. H., Lee, C. W. and Jung, J. H. (2017). “Preliminary scheduling based on historical and experience data for airport project.” Korea Institute of Construction Engineering and Management, KICEM, Vol. 18, No. 6, pp. 26-37, https://doi.org/10.6106/KJCEM.2017.18.6.026 (in Korean).DOI
17 
Kim, J. S. (2022). Analysis of project delay using big data. Msc. thesis, Hanyang University, Seoul, Korea (in Korean).URL
18 
Kim, S., Chang, S. and Castro-Lacouture, D. (2020). “Dynamic modeling for analyzing impacts of skilled labor shortage on construction project management.” Journal of Management in Engineering, ASCE, Vol. 36, No. 1, 04019035, https://doi.org/10.1061/(ASCE)ME.1943-5479.0000720.DOI
19 
Koppenjan, J., Veeneman, W., van der Voort, H., ten Heuvelhof, E. and Leijten, M. (2011). “Competing management approaches in large engineering projects: The Dutch RandstadRail project.” International Journal of Project Management, Vol. 29, No. 6, pp. 740-750, https://doi.org/10.1016/j.ijproman.2010.07.003. DOI
20 
Korea Institute of Civil engineering and building Technology (KICT) (2020). Guidelines for ensuring adequate construction time (in Korean).URL
21 
Korea Occupational Safety and Health Agency (KOSHA) (2019). 2019 Large accident report book, pp. 9 (in Korean).URL
22 
Lee, W. J. (2022). “A study on the use of stopword corpus for cleansing unstructured text data.” The Journal of the Convergence on Culture Technology, IPACT, Vol. 8, No. 6, pp. 891-897, https://doi.org/10.17703/JCCT.2022.8.6.891 (in Korean).DOI
23 
Lee, G. S. (2023). Methods to analyze the delays for extension of time claims. Msc. thesis, Hanyang University, Seoul, Korea (in Korean).URL
24 
Lee, J. H., Lee, M. B. and Kim, J. W. (2019). “A study on Korean language processing using TF-IDF.” The Journal of Information Systems, KAIS, Vol. 28, No. 3, pp. 105-121, https://doi.org/10.5859/KAIS.2019.28.3.105 (in Korean).DOI
25 
Li, W., Yin, Y., Quan, X. and Zhang, H. (2019). “Gene expression value prediction based on XGBoost algorithm.” Frontiers in genetics, Frontiers, Vol. 10, 1077, https://doi.org/10.3389/fgene.2019.01077.DOI
26 
Mulholland, B. and Christian, J. (1999). “Risk assessment in construction schedules.” Journal of Construction Engineering and Management, Vol. 125, No. 1, pp. 8-15, https://doi.org/10.1061/(ASCE)0733-9364(1999)125:1(8). DOI
27 
Natekin, A. and Knoll, A. (2013). “Gradient boosting machines, a tutorial.” Frontiers in Neurorobotics, Frontiers, Vol. 7, https://doi.org/10.3389/fnbot.2013.00021.DOI
28 
Normawati, D. and Ismi, D. P. (2019). “K-fold cross validation for selection of cardiovascular disease diagnosis features by applying rule-based datamining.” Signal and Image Processing Letters, ASCEE, Vol. 1, No. 2, pp. 62-72, https://doi.org/10.31763/simple.v1i2.3.DOI
29 
Oxford Economics (2017). Global Infrastructure Outlook.URL
30 
Park, G. S. (2012). A study on the estimation of an approproate construction duration of apartment. Msc. thesis, Seoul National University of Science and Technology (in Korean).URL
31 
Park, J. H., Cho, M. G., Eom, S. H. and Park, S. K. (2023). “Quantification of schedule delay risk of rain via text mining of a construction log.” KSCE Journal of Civil and Environmental Engineering Research, KSCE, Vol. 43, No. 1, pp. 109-117, https://doi.org/10.12652/Ksce.2023.43.1.0109 (in Korean).DOI
32 
Park, J. H., Choi, H. S., Cho, Y., Bang, K. S., Yun, S. H. and Paek, J. H. (2010). “A study on the development of probabilistic duration estimation module using monte carlo simulation.” Journal of the Architectural Institute of Korea Structure and Construction, AIK, Vol. 26, No. 5, pp. 101-108 (in Korean).URL
33 
Raschka, S. (2015). Python machine learning, 1st ed., Packt publishing Ltd.URL
34 
Saritas, M. M. and Yasar, A. (2019). “Performance analysis of ANN and Naive Bayes classification algorithm for data classification.” International Journal of Intelligent Systems and Applications in Engineering, Elsevier, Vol. 7, No. 2, pp. 88-91, https://doi.org/10.18201/ijisae.2019252786.DOI
35 
Singh, D. and Singh, B. (2020). “Investigating the impact of data normalization on classification performance.” Applied Soft Computing, Elsevier, Vol. 97, Part B, 105524, https://doi.org/10.1016/j.asoc.2019.105524.DOI
36 
Wang, G., Liu, M., Cao, D. and Tan, D. (2020). “Identifying high- frequency-low-severity construction safety risks: An empirical study based on official supervision reports in Shanghai.” Engineering, Construction and Architectural Management, Emerald Publishing Limited, Vol. 29, No. 2, pp. 940-960, https://doi.org/10.1108/ECAM-07-2020-0581.DOI
37 
Wong, T. T. and Yeh, P. Y. (2019). “Reliable accuracy estimates from k-fold cross validation.” IEEE Transactions on Knowledge and Data Engineering, IEEE, Vol. 32, No. 8, pp. 1586-1594, https://doi.org/10.1109/TKDE.2019.2912815.DOI
38 
Yang, S. W. and Lim, H. C. (2021). “Semantic network analysis on the research trends of construction accident.” Journal of the Architectural Institute of Korea, AIK, Vol. 37, No. 6, pp. 231-236 (in Korean).DOI
39 
Yu, J. H. and Kim, O. K. (2021). “A case study on the prevention of construction delays using the delay management index in program level construction projects.” Journal of the Korea Institute of Building Construction, Vol. 21, No. 4, pp. 347-359, https://doi.org/10.5345/JKIBC.2021.21.4.347 (in Korean).DOI
40 
Zhang, F., Fleyeh, H., Wang, X. and Lu, M. (2019). “Construction site accident analysis using text mining and natural language processing techniques.” Automation in Construction, Elsevier, Vol. 99, pp. 238-248, https://doi.org/10.1016/j.autcon.2018.12.016.DOI