Principal Variables and Appropriate Level of Dismantling Supervision Fees based on Building Client-Supervisor Contract Data in Seoul
|
Authors |
박성호(Sung-Ho Park) ; 이기세(Kee-Sei Lee) ; 김종찬(Jong-Chan Kim) |
DOI |
https://doi.org/10.11112/jksmi.2025.29.4.54 |
Keywords |
건축물 해체공사; 감리대가; 상관관계 분석; 선형 다중회귀분석 Building Dismantlement Works; Supervision Fee; Correlation analysis; Multiple linear regression analysis |
Abstract |
With full-time on-site supervision throughout the entire duration fo dismantlement, a method has been introduced to allow the use of the cost-plus-fixed-fee method in addition to the previously used percentage-of-construction-cost method for calculating supervision fees. Unlike the percentage-of-construction-cost method, which applies rate depending on cost of dismantlement works, the cost-plus-fixed-fee method permits variations in supervision fees through consultations among stakeholders, with such variations reflecting building scale, dismantlement plan, etc. Therefore, this study perform the correlation analysis between supervision fees and variables by utilizing dismantlement supervision contract data from Seoul over the past four years. Based on these main variables with high correlation to supervision fees, a simplified estimation formula is proposed to statistically evaluate appropriate supervision fee levels, and its predictive performance is evaluated.
|