The Journal of
the Korean Society on Water Environment

The Journal of
the Korean Society on Water Environment

Bimonthly
  • ISSN : 2289-0971 (Print)
  • ISSN : 2289-098X (Online)
  • KCI Accredited Journal

Editorial Office

References

1 
Cleland B R, 2003, TMDL Development from the “Bottom up” - Part III: Duration Curve and Wet Weather Assessment
2 
Gyeongsannam-do, 2015, [Korean Literature], The Third Stage Basic Plan of Gyeongsannam- do TMDL in Nakdong River, pp. 7-8
3 
Hwang H S, Park B K, Kim Y S, Park K J, Cheon S U, Lee S J, 2011, Research on the Applicability of the Load Duration Curve to Evaluate the Achievement of Target Water Quality in the Unit Watershed for a TMDL, [Korean Literature], Journal of Korean Society on Water Environment, Vol. 27, No. 6, pp. 885-895Google Search
4 
Hwang H S, Yoon C G, Kim J T, 2010, Application Load Duration Curve for Evaluation of Impaired Watershed at TMDL Unit Watershed in Korea, [Korean Literature], Journal of Korean Society on Water Environment, Vol. 26, No. 6, pp. 903-909Google Search
5 
Kim E J, Park B K, Kim Y S, Rhew D H, Jung K W, 2015, A Study on Development of Management Targets and Evaluation of Target Achievement for Non-point Source Pollution Management in Saemangeum Watershed, [Korean Literature], Journal of Korean Society of Environmental Engineers, Vol. 37, No. 8, pp. 480-491Google Search
6 
Ministry of Environment (MOE), 2012, http://water.nier.go.kr/waterMeasurement/selectWater.do (accessed Jun. 2012), Water Environment Information System (WEIS)
7 
National Institute Environmental Research (NIER), 2015, 11-1480523-002716-01. [Korean Literature], Demonstration Project of TMDLs for Tributary Watershed Management, National Institute Environmental Research
8 
Nevada, 2003, Load Duration Curve Methodology for Assessment and TMDL, Development Nevada Division of Environmental Protection
9 
Park J D, Oh S Y, 2012, Methodology for the Identification of Impaired Waters Using LDC for the Management of Total Maximum Daily Loads, [Korean Literature], Journal of Korean Society on Water Environment, Vol. 28, No. 5, pp. 693-703Google Search
10 
Park J H, Kim K S, Jung J W, Hwang K S, Moon M J, Ham S I, Lim B J, 2013, Water Quality Characteristics Evaluation by Flow Conditions Using Load Duration Curve - in Youngbon A Watershed, [Korean Literature], Journal of Environmental Impact Assessment, Vol. 22, No. 4, pp. 319-327Google Search
11 
Shon T S, Park J B, Shin H S, 2009, A Study on Estimation of the Delivery Ratio by Flow Duration in a Small-Scale Test Bed for Managing TMDL in Nakdong River, [Korean Literature], Journal of Korean Society on Water Environment, Vol. 25, No. 5, pp. 792-802Google Search
12 
United States Environmental Protection Agency Office of Wetlands, Oceans, & Watersheds (U. S. EPA.), 2006, An Approach for Using Load Duration Curves in the Development of TMDLs, U. S. EPA Office of Wetlands, Oceans, & Watersheds