Mobile QR Code QR CODE : The Transactions P of the Korean Institute of Electrical Engineers
The Transactions P of the Korean Institute of Electrical Engineers

Korean Journal of Air-Conditioning and Refrigeration Engineering

ISO Journal TitleTrans. P of KIEE
  • Indexed by
    Korea Citation Index(KCI)
Title A Study on Start¡¤Stop System at Water Turbine-Generator for Tidal Power Plant
Authors 오민환(Oh, Min-Hwan) ; 박철원(Park, Chul-Won)
DOI https://doi.org/10.5370/KIEEP.2014.63.2.113
Page pp.113-118
ISSN 1229-800X
Keywords Joint control system ; Maximum generation calculation method ; Start.stop system ; Tidal power plant ; Water turbine-generator
Abstract Tidal power is one of new and renewable energy sources. Tidal power is generated by using the gap in the water level between the water outside and inside the embankment. All tidal power plant in Korea were being operated by import of turn-key from abroad. The know-how and technology which are the most important to build predictive control system has become increasingly difficult to obtain from advanced countries because most of them avoid to transfer, which the domestic development of the control system is needed. In this paper, a study on start stop system at water turbine-generator for tidal power plant at the beginning of development was presented. For improvement the efficiency and develope of core technology of the start stop system, the technique and characteristics of tidal power, modeling, maximum generation calculation method, and optimal control of joint control system in Sihwa tidal power plant were studied.