Mobile QR Code QR CODE : The Transactions P of the Korean Institute of Electrical Engineers
The Transactions P of the Korean Institute of Electrical Engineers

Korean Journal of Air-Conditioning and Refrigeration Engineering

ISO Journal TitleTrans. P of KIEE
  • Indexed by
    Korea Citation Index(KCI)
Title Calculation of ESS Capacity of Industrial Customer through Economic Analysis
Authors 홍종석(Hong, Jong-Seok) ; 채희석(Chai, Hui-Seok) ; 문종필(Moon, Jong-Fil)
DOI https://doi.org/10.5370/KIEEP.2015.64.4.273
Page pp.273-276
ISSN 1229-800X
Keywords Benefit-to-cost ; Economic analysis ; ESS ; Load curve ; Power management system ; kW cost ; kWh cost
Abstract In this paper, ESS capacity installed in industrial customer is calculated using economic analysis. To do this, electric charge for industrial customer is analyzed and power management system(PMS) of ESS is selected. Reduction of kW cost and kWh cost are set to 'benefit' according to operation of ESS. Also, installation cost and maintenance cost of ESS are set to 'cost'. Proper ESS capacity is determined as a result of benefit-to-cost(B/C) analysis according to the variation of ESS installation cost. In case study, B/C is analyzed for the specific industrial customer and minimum capacity of ESS to make a profit are proposed for the customer.