Title |
Analysis of Performance and Economical Efficiency through Cycle Simulation for Power Saving BIP (Block Ice Plant) |
Keywords |
블럭 아이스 설비 ; 예냉장치 ; 절전형 ; 성적계수 ; 제빙시간 ; 전력요금 ; BIP ; Precooler system ; Power saving ; COP ; Ice making time ; Electric cost |
Abstract |
Domestic ice making companies make a simple effort to obtain products and neglect to introduce low cost product improvements with energy savings. The work presented here is an implementation of ice making method to improve both energy efficiency and productivity. In this present investigation, several ice making cycles are proposed for higher efficiency in the system. COP (Coefficient of Performance), ice making time and electric energy consumption are evaluated and compared with the conventional system. Results shows that COP is improved with more efficient use of time for ice making and electric consumption. Therefore, this can offer an opportunity for more efficient use of energy and higher productivity in ice making. |