Mobile QR Code QR CODE : Journal of the Korean Society of Civil Engineers
1 
Ahn, J.-P., Park, K.-H., Seo, J.-W. (2005). “A case study on the value engineering & life cycle cost for the life cycle assessment.” KSCE Conference & Civil Expo, KSCE, pp. 2217-2220 (in Korean).Ahn, J.-P., Park, K.-H., Seo, J.-W. (2005). “A case study on the value engineering & life cycle cost for the life cycle assessment.” KSCE Conference & Civil Expo, KSCE, pp. 2217-2220 (in Korean).Google Search
2 
Beom, S.-W., Kim, M.-H., Park, T.-G. (2003). “A study on the case study LCA analysis for the education and research building of S university.” Proceedings of KICEM Annual Conference, KICEM, pp. 465-468 (in Korean).Beom, S.-W., Kim, M.-H., Park, T.-G. (2003). “A study on the case study LCA analysis for the education and research building of S university.” Proceedings of KICEM Annual Conference, KICEM, pp. 465-468 (in Korean).Google Search
3 
Cha, C., Kwon, S.-H., Kwon, S.-Y. Lim, B.-S., Park, H.-C. (2005). “Environmental impact assessment using LCA (life cycle assesment) methodology.” KSCE Journal of Civil Engineering, KSCE Vol. 53, No. 6, pp. 62-69 (in Korean).Cha, C., Kwon, S.-H., Kwon, S.-Y. Lim, B.-S., Park, H.-C. (2005). “Environmental impact assessment using LCA (life cycle assesment) methodology.” KSCE Journal of Civil Engineering, KSCE Vol. 53, No. 6, pp. 62-69 (in Korean).Google Search
4 
Choi, Y.-K. (2007). A study on the GIS based environmental impact evaluation for route alignment, MSc Thesis, Ajou University, Korea (in Korean).Choi, Y.-K. (2007). A study on the GIS based environmental impact evaluation for route alignment, MSc Thesis, Ajou University, Korea (in Korean).Google Search
5 
Hwang, Y.-W., Park, K.-H., Seo, S.-W. (2000). “Assessment of CO2 emissions from road construction activities.” KSCE Journal of Civil Engineering, KSCE, Vol. 20, No. 1B, pp. 113-121 (in Korean).Hwang, Y.-W., Park, K.-H., Seo, S.-W. (2000). “Assessment of CO2 emissions from road construction activities.” KSCE Journal of Civil Engineering, KSCE, Vol. 20, No. 1B, pp. 113-121 (in Korean).Google Search
6 
Jeon, M.-H., Lee, H.-S, Park, M.-S., Shin, J.-H. (2009). “Analysis of greenhouse gas (GHG) emission factors during the construction phase.” Proceedings of KICEM Annual Conference, KICEM, pp. 260-265 (in Korean).Jeon, M.-H., Lee, H.-S, Park, M.-S., Shin, J.-H. (2009). “Analysis of greenhouse gas (GHG) emission factors during the construction phase.” Proceedings of KICEM Annual Conference, KICEM, pp. 260-265 (in Korean).Google Search
7 
Jo, K.-H., Kim, Y.-S., Park, B.-Y. (2005). “Evaluation of the environmental load of external wall system by using the full scale life cycle assessment.” KSCE Journal of Civil Engineering, KSCE, Vol. 53, No. 6, pp. 62-69 (in Korean).Jo, K.-H., Kim, Y.-S., Park, B.-Y. (2005). “Evaluation of the environmental load of external wall system by using the full scale life cycle assessment.” KSCE Journal of Civil Engineering, KSCE, Vol. 53, No. 6, pp. 62-69 (in Korean).Google Search
8 
Jung, Y.-S., Choi, K.-S., Kang, J.-S., Lee, S.-E. (2008). “Development of life cycle assessment program(K-LCA) for estimating environmental load of buildings.” Architectural Institute of Korea magazine, AIK, Vol. 24, No. 5, pp. 259-266 (in Korean).Jung, Y.-S., Choi, K.-S., Kang, J.-S., Lee, S.-E. (2008). “Development of life cycle assessment program(K-LCA) for estimating environmental load of buildings.” Architectural Institute of Korea magazine, AIK, Vol. 24, No. 5, pp. 259-266 (in Korean).Google Search
9 
Kang, M.-H. (2011). The selection method for excavation equipments using the environmental loads and costs, MSc Thesis, Chungbuk National University (in Korean).Kang, M.-H. (2011). The selection method for excavation equipments using the environmental loads and costs, MSc Thesis, Chungbuk National University (in Korean).Google Search
10 
Kim, C.-Y., Kim, H.-K. (2009). “BIM-based green house gas emission accounting for cable-stayed bridge construction processes.” Proceedings of KICEM Annual Conference, KICEM, pp. 751-756 (in Korean).Kim, C.-Y., Kim, H.-K. (2009). “BIM-based green house gas emission accounting for cable-stayed bridge construction processes.” Proceedings of KICEM Annual Conference, KICEM, pp. 751-756 (in Korean).Google Search
11 
Korea Institute of Construction Technology. (2009). Construction standard estimate, Korea Institute of Construction Technology (in Korean).Korea Institute of Construction Technology. (2009). Construction standard estimate, Korea Institute of Construction Technology (in Korean).Google Search
12 
Kwon, S.-H., Jung, W.-J., Kim, S.-G., Kim, S.-B. (2006). “The life cycle assessment of infrastructure considering environmental load.” Proceedings of KICEM Annual Conference, KICEM, pp. 519-522 (in Korean).Kwon, S.-H., Jung, W.-J., Kim, S.-G., Kim, S.-B. (2006). “The life cycle assessment of infrastructure considering environmental load.” Proceedings of KICEM Annual Conference, KICEM, pp. 519-522 (in Korean).Google Search
13 
Kwon, S.-H., Kim, K.-J., Kim, B.-S., Kim, S.-B. (2008). “Evaluation of environmental economics on dismantling projects using LCI DB.” Proceedings of KICEM Annual Conference, KICEM, pp. 207-212 (in Korean).Kwon, S.-H., Kim, K.-J., Kim, B.-S., Kim, S.-B. (2008). “Evaluation of environmental economics on dismantling projects using LCI DB.” Proceedings of KICEM Annual Conference, KICEM, pp. 207-212 (in Korean).Google Search
14 
Lee, S.-Y., Byun, S.-J., Jo, G.-H., Park, S.-G. (2008). “Environmental assessment at public facilities using the LCA”, KSCE magazine, KSCE, Vol. 56, No. 5, pp. 47-53 (in Korean).Lee, S.-Y., Byun, S.-J., Jo, G.-H., Park, S.-G. (2008). “Environmental assessment at public facilities using the LCA”, KSCE magazine, KSCE, Vol. 56, No. 5, pp. 47-53 (in Korean).Google Search
15 
Ministry of Land Infrastructure and Transport. (2003). The study of LCA application schemes on construction industry areas, No. 000863, KICT (in Korean).Ministry of Land Infrastructure and Transport. (2003). The study of LCA application schemes on construction industry areas, No. 000863, KICT (in Korean).Google Search
16 
Moon, J. -S. (2009). LCA analysis and case study of environment factors for highway construct project, MSc Thesis, Gyeongsang National University (in Korean).Moon, J. -S. (2009). LCA analysis and case study of environment factors for highway construct project, MSc Thesis, Gyeongsang National University (in Korean).Google Search
17 
Park, K.-H., Hwang, Y.-W., Park, J.-H., Seo, S.-W. (2000). “Environmental load evaluation through the life cycle of highway.” KSCE Journal of Civil Engineering, KSCE, Vol. 20, No. 3, pp. 311-321 (in Korean).Park, K.-H., Hwang, Y.-W., Park, J.-H., Seo, S.-W. (2000). “Environmental load evaluation through the life cycle of highway.” KSCE Journal of Civil Engineering, KSCE, Vol. 20, No. 3, pp. 311-321 (in Korean).Google Search
18 
Pascal S. (2004). “LCA for site remediation.” Soil and Sediment Contamination, Soil & Contamination, Vol. 13, No. 4, pp. 415-425.Pascal S. (2004). “LCA for site remediation.” Soil and Sediment Contamination, Soil & Contamination, Vol. 13, No. 4, pp. 415-425.Google Search
19 
Seo, S.-W., Ji, J.-S. (2000). “LCA methodology applied in the construction industry.” KSCE magazine, KSCE, Vol. 48, No. 1, pp. 19-26 (in Korean).Seo, S.-W., Ji, J.-S. (2000). “LCA methodology applied in the construction industry.” KSCE magazine, KSCE, Vol. 48, No. 1, pp. 19-26 (in Korean).Google Search
20 
Yue H. (2008). “Development of a life cycle assessment tool for construction and maintenance of asphalt pavements.” Journal of Cleaner Production, Cleaner Production, UK, Vol. 17, pp. 283-296.Yue H. (2008). “Development of a life cycle assessment tool for construction and maintenance of asphalt pavements.” Journal of Cleaner Production, Cleaner Production, UK, Vol. 17, pp. 283-296.Google Search