Mobile QR Code QR CODE : Journal of the Korean Society of Civil Engineers
1 
AASHTO (2007). AASHTO LRFD Bridge design for highway bridges, 5th Ed., American Association of State Highway Transportation Officials, Washington, D.C.AASHTO (2007). AASHTO LRFD Bridge design for highway bridges, 5th Ed., American Association of State Highway Transportation Officials, Washington, D.C.Google Search
2 
Boshore, Edwin C. (1965). “Durability of prestressed concrete beams.” PCI JOURNAL, Vol. 10, No. 5, pp. 49-59.Boshore, Edwin C. (1965). “Durability of prestressed concrete beams.” PCI JOURNAL, Vol. 10, No. 5, pp. 49-59.Google Search
3 
Eurocode 2 (2002). Design of concrete structures, Brussels, July.Eurocode 2 (2002). Design of concrete structures, Brussels, July.Google Search
4 
Ghosh, S. K. and Fintel, Mark. (1986). “Development length of prestressing strands, including debonded strands and allowable concrete stresses in pretensioned members.” PCI Journal, Vol. 31, No. 5, pp. 38-57.Ghosh, S. K. and Fintel, Mark. (1986). “Development length of prestressing strands, including debonded strands and allowable concrete stresses in pretensioned members.” PCI Journal, Vol. 31, No. 5, pp. 38-57.Google Search
5 
Kaar, P. H. and Hanson, N. W. (1975). “Bond fatigue tests of beams simulating pretensioned concrete crossties.” PCI JOURNAL, Vol. 20, No. 5, pp. 65-80.Kaar, P. H. and Hanson, N. W. (1975). “Bond fatigue tests of beams simulating pretensioned concrete crossties.” PCI JOURNAL, Vol. 20, No. 5, pp. 65-80.Google Search
6 
Kim, J. H., Moon, D. Y., Zi, G. S. and Kim, G. S. (2008). “Dynamic behavior of pretension concrete member during detensioning.” Journal of The Korean Society of Civil Engineers, KSCE, Vol. 28, No. 5A, pp. 747-756 (in Korean).Kim, J. H., Moon, D. Y., Zi, G. S. and Kim, G. S. (2008). “Dynamic behavior of pretension concrete member during detensioning.” Journal of The Korean Society of Civil Engineers, KSCE, Vol. 28, No. 5A, pp. 747-756 (in Korean).Google Search
7 
Korea Concrete Institute (2007). Design standard for concrete structures (in Korean). Korea Concrete Institute (2007). Design standard for concrete structures (in Korean).Google Search
8 
Marshall, W. T. (1966). “A theory for end zone stresses in pretensioned concrete beam.” PCI JOURNAL, Vol. 11, No. 2, pp. 45-51.Marshall, W. T. (1966). “A theory for end zone stresses in pretensioned concrete beam.” PCI JOURNAL, Vol. 11, No. 2, pp. 45-51.Google Search
9 
Marshall, W. T. and Mattock, A. H. (1962). “Control of horizontal cracking in the ends of pretensioned prestressed concrete girders.” PCI JOURNAL, Vol. 7, No. 5, pp. 56-74.Marshall, W. T. and Mattock, A. H. (1962). “Control of horizontal cracking in the ends of pretensioned prestressed concrete girders.” PCI JOURNAL, Vol. 7, No. 5, pp. 56-74.Google Search
10 
Ministry of Land, Transport and maritime affairs of sounth korea (2008). Road design manual, chapter 5. bridge (in Korean).Ministry of Land, Transport and maritime affairs of sounth korea (2008). Road design manual, chapter 5. bridge (in Korean).Google Search
11 
Ministry of Land, Transport and maritime affairs of south korea (2010). Standards for road bridge design (in Korean).Ministry of Land, Transport and maritime affairs of south korea (2010). Standards for road bridge design (in Korean).Google Search
12 
Mirza, J. F. and Tawfik, M. E. (1978). “End cracking in prestressed members during detensioning.” PCI JOURNAL, Vol. 23, No. 2, pp. 66-78.Mirza, J. F. and Tawfik, M. E. (1978). “End cracking in prestressed members during detensioning.” PCI JOURNAL, Vol. 23, No. 2, pp. 66-78.Google Search
13 
Mitchell, Denis, Cook, William D., Khan, Arshade A. and Tham, Thomas (1993). “Influence of high strength concrete on transfer and development length of pretensioning strand.” PCI JOURNAL, Vol. 38, No. 3, pp. 52-66.Mitchell, Denis, Cook, William D., Khan, Arshade A. and Tham, Thomas (1993). “Influence of high strength concrete on transfer and development length of pretensioning strand.” PCI JOURNAL, Vol. 38, No. 3, pp. 52-66.Google Search
14 
Nawy, Edward G. and Huang, P. T. (1977). “Crack and deflection control of pretensioned prestressed beams.” PCI JOURNAL, Vol. 22, No. 3, pp. 30-47.Nawy, Edward G. and Huang, P. T. (1977). “Crack and deflection control of pretensioned prestressed beams.” PCI JOURNAL, Vol. 22, No. 3, pp. 30-47.Google Search
15 
Oh, B. H. and Kim, E. S. (2000). “Influencing factors and evaluation of transfer lengths in pretensioned prestressed concrete members.” Journal of The Korean Society of Civil Engineers, KSCE, Vol. 20, No. 6A, pp. 945-956 (in Korean).Oh, B. H. and Kim, E. S. (2000). “Influencing factors and evaluation of transfer lengths in pretensioned prestressed concrete members.” Journal of The Korean Society of Civil Engineers, KSCE, Vol. 20, No. 6A, pp. 945-956 (in Korean).Google Search
16 
Precast/Prestressed Concrete Institute (2003). Precast Prestressed Concrete BRIDGE DESIGN MANUAL (I), (II).Precast/Prestressed Concrete Institute (2003). Precast Prestressed Concrete BRIDGE DESIGN MANUAL (I), (II).Google Search
17 
RABBAT, B. G., Kaar, P. H., Russell, H. G. and Bruce, Jr., R. N. (1979). “Fatigue tests of pretensioned girders with blanketed and draped strands.” PCI JOURNAL, Vol. 24, No. 4, pp. 88-115.RABBAT, B. G., Kaar, P. H., Russell, H. G. and Bruce, Jr., R. N. (1979). “Fatigue tests of pretensioned girders with blanketed and draped strands.” PCI JOURNAL, Vol. 24, No. 4, pp. 88-115.Google Search
18 
Roller, J. J., Russel, H. G., Bruce, R. N. and Martin, B. T. (1995). “Long-term performance of prestressed, pretensioned high strength concrete bridge girder.” PCI JOURNAL, Vol. 40, No. 6, pp. 48-59.Roller, J. J., Russel, H. G., Bruce, R. N. and Martin, B. T. (1995). “Long-term performance of prestressed, pretensioned high strength concrete bridge girder.” PCI JOURNAL, Vol. 40, No. 6, pp. 48-59.Google Search
19 
Russell, B. W. and Burns, N. H. (1994). “Fatigue tests on prestressed concrete beams made with debonded strands.” PCI JOURNAL, Vol. 39, No. 6, pp. 70-88.Russell, B. W. and Burns, N. H. (1994). “Fatigue tests on prestressed concrete beams made with debonded strands.” PCI JOURNAL, Vol. 39, No. 6, pp. 70-88.Google Search
20 
Seguirant, S. J. (1998). “New deep wsdot standard sections extend spans of prestressed concrete girders.” PCI JOURNAL, Vol. 43, No. 4, pp. 92-119.Seguirant, S. J. (1998). “New deep wsdot standard sections extend spans of prestressed concrete girders.” PCI JOURNAL, Vol. 43, No. 4, pp. 92-119.Google Search
21 
Shin, H. M. (2007). Prestress concrete, 10th Ed., Dong myung sa (in Korean).Shin, H. M. (2007). Prestress concrete, 10th Ed., Dong myung sa (in Korean).Google Search