Mobile QR Code QR CODE : Journal of the Korean Society of Civil Engineers
1 
ADOT (2011). A+B bidding guide, Arizona Department of Transportation.ADOT (2011). A+B bidding guide, Arizona Department of Transportation.Google Search
2 
Carmichael, D. G. (2000). Contracts and international project management, A. A. BALKEMA, Univ. of New South Wales, Sydney, Australia, pp. 7-11.Carmichael, D. G. (2000). Contracts and international project management, A. A. BALKEMA, Univ. of New South Wales, Sydney, Australia, pp. 7-11.Google Search
3 
CII. (2002). Measuring the impacts of the delivery system on project performance: Design-build and design-bid-build, NIST, U.S., Austin, TX.CII. (2002). Measuring the impacts of the delivery system on project performance: Design-build and design-bid-build, NIST, U.S., Austin, TX.Google Search
4 
El Wardani, M. A., Messner, J. I. and Horman, M. J. (2006). “Comparing procurement methods for design build projects.” J. Construc, Eng. Manage, Vol. 132, No. 3, pp. 230-238.El Wardani, M. A., Messner, J. I. and Horman, M. J. (2006). “Comparing procurement methods for design build projects.” J. Construc, Eng. Manage, Vol. 132, No. 3, pp. 230-238.Google Search
5 
James David Fernane. (2011). Comparison of design-build and design-bid-build performance of public university projects, Univ. of Nevada, Las Vegas, Nevada.James David Fernane. (2011). Comparison of design-build and design-bid-build performance of public university projects, Univ. of Nevada, Las Vegas, Nevada.Google Search
6 
Koo, B. S. and Jang, H. S. (2009). “Evaluation on the impact of lowest bid contracts on site operations in times of sever economic downturn.” Korean Journal of Construction Engineering and Managemen, KICEM, Vol. 10, No. 6, pp. 146-153.Koo, B. S. and Jang, H. S. (2009). “Evaluation on the impact of lowest bid contracts on site operations in times of sever economic downturn.” Korean Journal of Construction Engineering and Managemen, KICEM, Vol. 10, No. 6, pp. 146-153.Google Search
7 
Lee, B. N. and Lee, J. S. (2009). “Advanced ordering system construction plan.” Korean Journal of Construction Engineering and Managemen, KICEM, Vol. 10, No. 2, pp. 27-30. Lee, B. N. and Lee, J. S. (2009). “Advanced ordering system construction plan.” Korean Journal of Construction Engineering and Managemen, KICEM, Vol. 10, No. 2, pp. 27-30.Google Search
8 
Lee, Y. S. (2005). “Turnkey system, alternatives, outcomes and tasks.” Jounal of the Korean Society of civil Engineers, KSCE, Vol. 53, No. 10, pp. 77-91.Lee, Y. S. (2005). “Turnkey system, alternatives, outcomes and tasks.” Jounal of the Korean Society of civil Engineers, KSCE, Vol. 53, No. 10, pp. 77-91.Google Search
9 
Lee, Y. S. (2012). Construction delivery method enabled by effective analysis and research skills offered bids, KICT, MLTM (in Korean).Lee, Y. S. (2012). Construction delivery method enabled by effective analysis and research skills offered bids, KICT, MLTM (in Korean).Google Search
10 
Lee, Y. S., etc. (2012). Development of construction project management technology based on BIM/GIS platform, KICT (in Korean).Lee, Y. S., etc. (2012). Development of construction project management technology based on BIM/GIS platform, KICT (in Korean).Google Search
11 
Lee, Y. S. and Hwang, B. G. (2007). “Impacts of contract on construction project performance-cost reimbursable and lump sum.” Korean Journal of Construction Engineering and Managemen, KICEM, Vol. 8, No. 2, pp. 155-163 (in Korean).Lee, Y. S. and Hwang, B. G. (2007). “Impacts of contract on construction project performance-cost reimbursable and lump sum.” Korean Journal of Construction Engineering and Managemen, KICEM, Vol. 8, No. 2, pp. 155-163 (in Korean).Google Search
12 
SAIC. (2006). Performance contracting framework fostered by highways for LIFE, U.S Department of Transportation, Federal Highway Administration.SAIC. (2006). Performance contracting framework fostered by highways for LIFE, U.S Department of Transportation, Federal Highway Administration.Google Search
13 
Seoul Metropolitan Government. (2000). Bidding for construction of large-scale impact of the research methods, Construction Engineering and Management (in Korean).Seoul Metropolitan Government. (2000). Bidding for construction of large-scale impact of the research methods, Construction Engineering and Management (in Korean).Google Search
14 
William Quatman, G. (2007). Use of bridging consultants in design- build, American Bar Association, Forum on the Construction Industry. William Quatman, G. (2007). Use of bridging consultants in design- build, American Bar Association, Forum on the Construction Industry.Google Search
15 
Yoo, J. H. and Choi, J. H. (2006). “The river water in emergency repair work utilizing KPI evaluation CM approach.” Korean Journal of Construction Engineering and Managemen, KICEM, Vol. 5, No. 3, pp. 18-22 (in Korean).Yoo, J. H. and Choi, J. H. (2006). “The river water in emergency repair work utilizing KPI evaluation CM approach.” Korean Journal of Construction Engineering and Managemen, KICEM, Vol. 5, No. 3, pp. 18-22 (in Korean).Google Search