ACI Committee 373 (1997). Design and construction of circular prestressed concrete
structures with circumferential tendons (ACI 373R-97), American Concrete Institute
(ACI).
Daewoo Engineering and Construction (2004). Technical proposal for above-ground LNG
storage tank with 200,000kl capacity, DEP-003-2004, Daewoo Engineering and Construction
(in Korean).
Dassault Systèmes Simulia (2015). Abaqus 6.15-Analysis user’s manual, Dassault Systèmes
Simulia.
European Organisation for Technical Approvals (EOTA) (2002). Guideline for European
technical approval of post-tensioning kits for prestressing of structures (ETAG 013),
EOTA.
Japan Prestressed Concrete Institute (JPCI) (2005). The standard for design and construction
about PC tank with the water reservoir, JPCI (in Japanese).
Jeon, S. J. (2004). “Consistent assessment for liquid tightness of LNG storage tank
subjected to cryogenic temperature-induced forces.” Journal of the Korean Society
of Civil Engineers, Vol. 24, No. 1A, pp. 203-210 (in Korean).
Jeon, S. J. (2005). “A comparative study on the equivalent load method and the initial
stress method for prestressing modeling of the tendon.” Journal of the Korean Society
of Civil Engineers, Vol. 25, No. 5A, pp. 899-906 (in Korean).
Jeon, S. J. and Kim, S. M. (2004). “Structural analysis of prestressed concrete structures.”
Magazine of the Korea Concrete Institute, Vol. 16, No. 1, pp. 57-64 (in Korean).
Jeon, S. J., Chung, C. H. and Jin, B. M. (2003). “Advanced heat transfer analysis
model of LNG storage tank.” Journal of the Korean Society of Civil Engineers, Vol.
23, No. 6A, pp. 1087-1094 (in Korean).
Jeon, S. J., Jin, B. M., Kim, Y. J. and Chung, C. H. (2007). “Consistent thermal analysis
procedure of LNG storage tank.” Structural Engineering and Mechanics, Vol. 25, No.
4, pp. 445-466.
10.12989/sem.2007.25.4.445
Kim, J. K., Seong, T. R. and Lee, J. K. (2012). “Development of 2,160 MPa/2,400 MPa
PS strand and its application technology.” Magazine of the Korea Concrete Institute,
Vol. 24, No. 3, pp. 45-50 (in Korean).
Kim, J. K., Yang, J. M. and Yim, H. J. (2016). “Experimental evaluation of transfer
length in pretensioned concrete beams using 2,400-MPa prestressed strands.” Journal
of Structural Engineering, Vol. 142, No. 11, pp. 04016088.
10.1061/(ASCE)ST.1943-541X.0001567
Kim, K. H. (2009). Analytical study on long-term losses of the high strength strand,
Master’s thesis, Seoul National University of Technology (in Korean).
Korea Concrete Institute (KCI) (2009). Standard specification for concrete, KCI (in
Korean).
Korea Concrete Institute (KCI) (2012). Structural concrete design code, KCI (in Korean).
Korea Concrete Institute (KCI) (2015). Development of design guideline and analysis
of LPG/LNG tank prestressed with 2400 MPa PT, KCI-R-15-018, KCI (in Korean).
Korean Agency for Technology and Standards (KATS) (2011). Uncoated stress-relieved
steel wires and strands for prestressed concrete (KS D 7002), Korean Standards Association
(KSA) (in Korean).
Lin, T. Y. (1963). “Load balancing method for design and analysis of prestressed concrete
structures.” ACI Journal, Vol. 60, No. 6, pp. 719-742.
Lin, T. Y. and Burns, N. H. (1981). Design of prestressed concrete structures, 3rd
Ed., John Wiley and Sons.
Oh, B. H. and Jeon, S. J. (2002). “Limitations and realistic application of equivalent
load methods in pre-stressed concrete structures.” Magazine of Concrete Research,
Vol. 54, No. 3, pp. 223-231.
10.1680/macr.2002.54.3.223
Park, H., Cho, J. Y. and Kim, J. S. (2012). “Investigation on applicability of 2400
MPa strand for posttensioned prestressed concrete girders.” Journal of the Korea Concrete
Institute, Vol. 24, No. 6, pp. 727-735 (in Korean).
10.4334/JKCI.2012.24.6.727
Seo, H. K. (2016). Analysis of prestressing effect of LNG storage tank with 2400 MPa
high-strength strands, Master’s thesis, Ajou University (in Korean).
Shin, H. M. (2008). Prestressed concrete, 10th Ed., Dongmyungsa (in Korean).
Timoshenko, S. P. and Goodier, J. N. (1970). Theory of elasticity, McGraw-Hill.
Yang, J. M., Kim, J. K., Youn, S. G., Jeon, S. J., Kim, K. H. and Ahn, Y. S. (2016).
“Application of 2,400 MPa PS strand to LNG/ LPG storage tank.” Magazine of the Korea
Concrete Institute, Vol. 28, No. 1, pp. 41-45 (in Korean).