JKSCE
KSCE JOURNAL OF CIVIL AND
ENVIRONMENTAL ENGINEERING RESEARCH
KSCE
Contact
ISSN : 1015-6348 (Print)
ISSN : 2799-9629 (Online)
Mobile QR Code
Journal of the Korean Society of Civil Engineers
ISO Journal Title
KSCE J. Civ. Environ. Eng. Res.
Open Access, Bi-monthly
Main Menu
Main Menu
최근호
Current Issue
논문집
Journal Archive
저널소개
About Journal
편집위원회
Editorial Board
논문투고안내
For Authors and Reviewers
윤리규정
Publication Ethics
Principles of Transparency and Best Practice
Business Model
연락처
Contact Info
논문투고
E-submission
Journal Search
Home
All Issues
2022-02
(v.42 n.1)
10.12652/Ksce.2022.42.1.0095
Journal XML
XML
PDF
INFO
REF
References
1
Blakemore F., Desai B. (2006). "Fast-Track Bridge Redecking: Route 64 over Pomme de Terre Lake", Conference of Structures Congress 2006, Civil Engineering, ASCE, pp. 1-7
2
Byun E. J., Lim C. J., Oh M. J., Heo N. H., Cho K. M., Hyun C. T., Koo K. J. (2005). "Application of Fast Track Method to Remodeling Project", Journal of the Architectural Institute of Korea, Vol. 25, No. 1, pp. 321-324 (in Korean).
3
Cho K. M., Hyun C. T., Koo K. J. (2004). "“A model for selecting effective fast-track projects in design-build delivery method", Journal of the Architectural Institute of Korea, Vol. 24, No. 1, pp. 459-462 (in Korean).
4
Correa J., Hille G., Ellison D., Camp C., Raines G., Prentice C. (2004). "Fast-track design and installation of a 30-inch casing pipe crossing of the ventura river", Pipeline Engineering and Construction, pp. 1-16
5
Daehan News Article (2018). "[Incheon Airport Passenger Terminal 2] How did the design and construction proceed?", Available at: https://m.cnews.co.kr/mobile/read.jsp?idxno=201801120956162300719 (Accessed: Sep 2021).
6
Gruber A., Williams B., Wu R. (2020). "Beating the clock: Leveraging the flexibility of design-build to fast track pipe delivery.", Pipelines, ASCE, 2020.
7
Haddad S., Smith D. R. (1993). "Fast-track stadium.", Civil Engineering, ASCE, Vol. 63, No. 2, pp. 52-54
8
Housing Research Institute (2000). "A study on the application of fast-track to the turn-key based contract", Report, Korea Housing Corporation, pp. 1-19
9
Kalach M., Abdul-Mala M., Srour I. (2021). "BIM-enabled streaming of changes and potential claims induced by fast- tracking design-build projects", Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, ASCE, Vol. 13, No. 1
10
Kim H. S. (2008). "A study for construction of the standard time schedule table of soccer stadium by using fast track method", Master Thesis, Gyeongsang National University (in Korean).
11
Lee B. N. (1997). "The economics of the fast track method and construction business.", Journal of Construction Industry Trends, No. 12, pp. 1-9 (in Korean)
12
Park H. K. (2004). "A case study on system implementation of the design management for fast track method in S.O.C project.", Journal of the Korean Society of Civil Engineers, KSCE, Vol. 24, No. 1, pp. 439-446 (in Korean)
13
Polk J. M., Mitchell G. L. (2003). "Fast track reconstruction of runway 18R-36L at memphis international airport: A case study", Airfield Pavements Specialty Conference, pp. 507-524
14
van der Veen N. (2019). "Fast-Track Construction: What Is It, and How to Do It Right?", RMJM Dubai principal, Available at: https://rmjm.com/fast-track-construction (Accessed: Sep 2021).