Mobile QR Code QR CODE : Journal of the Korean Society of Civil Engineers

References

1 
An B. H., Kim J. E., Kim Y. S. (2013). "The analysis of the weights of country risk by participants of overseas construction projects.", Korean Journal of Construction Engineering and Management, KJCEM, Vol. 14, No. 2, pp. 150-159 (in Korean)DOI
2 
Construction Industry Institute (CII) (2004). "International project risk assessment: A management approach", Research Summary 181-1, Austin, TX: CII.Google Search
3 
Hyun H. B. (2016). "Identification of contractual risk factors for application in the overseas construction projects based on FIDIC red book 1999 edition.", Journal of the Korean Society of Civil Engineers, KSCE, Vol. 36, No. 6, pp. 1153-1160 (in Korean)DOI
4 
International Federation of Consulting Engineers (2011). "Conditions of subcontract for construction", FIDIC, Geneva, Switzerland.Google Search
5 
Jung W. Y., Lee B. U., Han S. H. (2017). "A performance analysis of risk management for international construction project conducted by small & medium subcontractors.", Korean Journal of Construction Engineering and Management, KJCEM, Vol. 18, No. 2, pp. 71-80 (in Korean)Google Search
6 
Kang J. S. (2016). "A study on hedge strategy for contractor’s risk factors in FIDIC contract conditions", MS Thesis, Woosong University of Railroad Science (in Korean).Google Search
7 
Koh H. S. (2014). "Risk analysis of contractual provisions for EPC/Turnkey projects: Contractor’s liability position", Master Dissertation, Pohang University of Science and Technology (in Korean)Google Search
8 
Lawshe C. H. (1975). "A quantitative approach to content validity.", Personnel Psychology, Vol. 28, No. 4, pp. 563-575URL
9 
Lee H. K., Shin D. W., Kim K. R., Cha H. S., Kim Y. J. (2017). "Risk assessment model for the delay protocol in the conditions of contract of international construction projects.", Korean Journal of Construction Engineering and Management, KJCEM, Vol. 18, No. 6, pp. 65-77 (in Korean)DOI
10 
Mulcahy R. (2003). "Risk management-tricks of the trade for project manager", RMC Publication, Inc., Minnesota, USA, pp. 105-121Google Search
11 
Noh S. Y. (2006). "Delphi technique: Forecasting the future with by technical insight.", Planning and Policy, KRIHS, Vol. 299, pp. 53-62 (in Korean)Google Search
12 
Yoo W. H. (2011). "Contractural risk evaluation model for international construction projects using FIDIC silver book.", Journal of the Architectureal Institute of Korea Structure & Construction, Vol. 27, No. 11, pp. 159-168Google Search