Mobile QR Code QR CODE : Journal of the Korean Society of Civil Engineers

References

1 
"Ahn, J., Baek, S., Yun, S., Lee, K. and Han, S. (2023). “Analysis of major cases of road construction change order.” Proceedings of KICEM Annual Conference, pp. 245-246 (in Korean)."URL
2 
"Ji, S., Park, M., Lee, H. and Yoon, Y. (2008). “Direction for improving cost estimation and management of construction projects: comparing to australian system.” Korean Journal of Construction Engineering and Management, Vol. 9, No. 2, pp. 170-181 (in Korean)."URL
3 
"Jung, E., Yeom, D., Kim, J. and Kim, Y. (2021). “Development of construction cost estimation model for elementary, middle and high school facilities.” Korean Journal of Construction Engineering and Management, Vol. 22, No. 3, pp. 69-78, https://doi.org/ 10.6106/KJCEM.2021.22.3.069 (in Korean)."DOI
4 
"Kim, H. and Kim, H. (2023). “A study on the development of construction budget estimating model for public office buildings based on artificial neural network.” Korean Journal of Construction Engineering and Management, Vol. 24, No. 5, pp. 22-34, https://dx.doi.org/10.6106/KJCEM.2023.24.5.022 (in Korean)."DOI
5 
"Kim, K., Lee, D. and Kim, T. (2015). “A study for error analysis for post evaluation system on the construction projects.” Korean Journal of Construction Engineering and Management, Vol. 16, No. 2, pp. 77-85, https://doi.org/10.6106/KJCEM.2015.16.2.077 (in Korean)."DOI
6 
"Kim, J., Lee, J. and Lee, M. (2023). “A study on the improvement of long-term continuing construction contracts dispute using FGI.” Korean Journal of Construction Engineering and Management, Vol. 24, No. 2, pp. 79-87, https://dx.doi.org/10.6106/KJCEM.2023.24.2.079 (in Korean)."DOI
7 
"Koo, B., Yu, J. and Park, J. (2015). “Formal estimation method for optimal budget appropriation of highway construction projects under long-term construction contracts.” Journal of the Korean Society of Civil Engineering, Vol. 35, No. 6, pp. 1405-1412, https://doi.org/10.12652/Ksce.2015.35.6.1405 (in Korean)."DOI
8 
"KOSTAT (2003). Domestic value of construction orders received, https://kosis.kr/statHtml/statHtml.do?orgId=365&tblId=TX_36505_A000&conn_path=I2 (Accessed: August 26, 2023)."URL
9 
"Kwon, Y. and Kim, K. (2023). “A study on the problems and improvement plan of the post-evaluation system for construction work.” Proceedongs of KICEM Annual Conference 2023, pp. 291-292 (in Korean)."URL
10 
"Lee, K. and Lee, H. (2011). “The study of analysis for cost- increasing factors on public construction projects.” Conference Proceedings of the Regional Association of Architectural Institute of Korea, pp. 105-108."URL
11 
"Lee, K. and Park, H. (2018). “Development of the qualitative model for post construction evaluation.” Journal of the Korean Society of Civil Engineers, Vol. 38, No. 5, pp. 733-739, https://doi.org/10.12652/Ksce.2018.38.5.0733 (in Korean)."DOI
12 
"Lee, J., Tae, Y., Baek, S. and Kim, K. (2022). “A study of improvements in the standards of cost estimate for the new excellent technology in construction.” Korean Journal of Construction Engineering and Management, Vol. 23, No. 5, pp. 65-76, https://dx.doi.org/10.6106/KJCEM.2022.23.5.065 (in Korean)."DOI
13 
"Lee, J. and Yun, H. (2021). “Improvement plan through analysis of the current status of construction period calculation of public construction projects.” Korean Journal of Construction Engineering and Management, Vol. 22, No. 3, pp. 12-20, https://doi.org/10.6106/KJCEM.2021.22.3.012 (in Korean)."DOI
14 
"Mun, J. and Yun, S. (2023). “Analyzing planning performance of road construction projects using preliminary feasibility analysis data.” Korean Journal of Construction Engineering and Management, Vol. 24, No. 1, pp. 3-11, https://dx.doi.org/10.6106/KJCEM.2023.24.1.003 (in Korean)."DOI
15 
"Nam, S. and Park, H. (2020). “A study on the construction cost index for calculating conceptual estimation: 1970-1999.” Journal of the Korean Society of Civil Engineering, Vol. 40, No. 5, pp. 527-534, https://doi.org/10.12652/Ksce.2020.40.5.0527 (in Korean)."DOI