BIC (2013), Axial force Tests for Cable-band Bolts in Gwangan Grand Bridge.
(1998), An Experimental Studies on the Relaxation and Slip Behavior of Coated Joints
Fastened with High Tension Bolts, Proceeding of Annual Conference, KSCE(Korean Society
of Civil Engineering), 441-444 (in Korean).
(2008), Relaxation Test of KICT Tendons, Proceeding of Annual Conference, KSCE(Korean
Society of Civil Engineering), 1504-1507 (in Korean).
(1967), Specifications for Highway Bridges, Part II Steel Bridges, 719-722.
(2008), Damage, Repair and Reinforcement for Cable-stayed Bridges, Infrastructure
Safety, KISTEC(Korea Infrastructure Safety and Technology Corporation), 31, 6-67 (in
Korean).
KRA (2010), Specifications for Road Bridges.
MOLT (2010), Geogum Grand Bridge(Phase I) Structural & Hydraulic Calculation Sheet
Part II, 874.
(2008), Slip Safety Evaluation for Cable Band Bolts on Suspension Bridges, Proceeding
of 63rd Annual Conference, JSCE(Japanese Society of Civil Engineering), 1(63), 125-126
(in Japanese).
NAI (2007), 2nd Axial Force Retightening and Test Results in Youngjong Grand Bridge.
(2003), Cable Design of Self-Anchored Suspension Bridge(Sorok Bridge),, Proceeding
of Annual Conference, KSCE(Korean Society of Civil Engineering), 5478-5483 (in Korean).
Taylor & Francis (2006), Bridge Management : Inspection, maintenance, assessment
and repair, 658-661.