The Journal of
the Korean Society on Water Environment

The Journal of
the Korean Society on Water Environment

Bimonthly
  • ISSN : 2289-0971 (Print)
  • ISSN : 2289-098X (Online)
  • KCI Accredited Journal

Editorial Office

1 
Adeloy A.J., 2009, Multiple Linear Regression and Artificial Neural Networks Models for Generalized Reservoir Storage- Yield-Reliability Function for Reservoir Planning, Journal of Hydrologic Engineering, Vol. 14, No. 7, pp. 731-738DOI
2 
Ahn J.M., Cha K.U., Ryoo K.S., Lyu S., 2011, Study of the Lower Duration Curve Characteristic by Reservoir and Weir Couple-operating System in Geum River Basin, Journal of Korea Water Resources Association, Vol. 44, No. 4, pp. 285-293DOI
3 
Ahn S.J., Choi B.M., Kwark H.G., Kim H.H., 2006, An Application of River Basin Network Flow Model for Optimum Water Allocation Planning, Korea Water Resources Association, pp. 365-369DOI
4 
Allan J.A., 1997, Virtual water : A Long Term Solution for Water Short Middle Eastern Eonomics, School of Oriental and African Studies(SOAS), University of London, pp. 5
5 
Cheong T.S., Kang S., Hwang M., Ko I., 2008, Development and Validation of Reservoir Operation Rules for Integrated Water Resources Management in the Geum River Basin, Journal of Korea Water Resources Association, Vol. 41, No. 4, pp. 433-444DOI
6 
Hoekstra A.Y., 2003, Virtual Water Trade Between Nations: a Global Mechanism Affecting Regional Water System, IGBP Global Change News Letter, Vol. 54, pp. 2Google Search
7 
International Panal on Climate Change (IPCC), 2007, Climate Change 2007: The Physical Science Basis. Contribution of Working Group I to the Fourth Assessment Report of the International Panel on Climate Change, Cambridge University PressDOI
8 
Kang M.G., Park S.W., 2005, Assessment of Additional Water Supply Capacity Using a Reservoir Optimal Operation Model, Journal of Korea Water Resources Association, Vol. 38, No. 11, pp. 937-946DOI
9 
Kim C.G., Kim N.W., 2011, Assessing Impact of Dam Operation and Artificial Water Use on River Flow Regimes and Water Quality in the Geum River Basin, Korean Society on Water Environment and Korean Society of Water and Wastewater, pp. 497-498DOI
10 
Klipsch J.D., Hurst M.B., 2007, HEC-ResSim, Reservoir System Simulation User ?(tm)s Manual, Version 3.0. U.S. Army Corps of Engineers, Institute for Water Resources, Hydrologic Engineering Center
11 
Korea Institute of Construction Technology (KICT), 1994, Improvement of Evaluation Techniques of Water Supply Capacity for multipurpose Dam, Korea Institute of Construction TechnologyDOI
12 
Korea Water Resources Corporation (K-water), 1998, [Korean Literature], Investigate the Existing Dam Water Supply Capacity, Korea Water Resources Corporation
13 
Korea Water Resources Corporation (K-water), 2012, [Korean Literature], Practical Manual of Dam, Korea Water Resources Corporation
14 
Lee S.H., Ampitiya H.K., Bogardi J.J., 2000, A Case Study on the Derivation of Optimal Operation Policies for the Reservoirs of the Complex Mahaweli Water Resources Scheme in Sri Lanka, Journal of Korean Society on Water Environment, Vol. 16, No. 2, pp. 169-177Google Search
15 
Ministry of Land, Infrastructure and Trnasport (MOLIT), 2006, [Korean Literature], Long-term Water Master Plan, Ministry of Land, Infrastructure and Trnasport
16 
Ministry of Land, Infrastructure and Trnasport (MOLIT), 2009, [Korean Literature], River Maintenance Master Plan in the Nakdong River, Ministry of Land, Infrastructure and Trnasport
17 
Park K.B., Jee H.K., Lee S.T., 2005, Parallel Reservoir Simulation for Water Supply at Drought Period, Korean Society on Water Environment and Korean Society of Water and Wastewater, pp. 710-716DOI
18 
Rittima A., Vudhivanich V., 2003, Storage-Yield-Resilience-Reliability Relation Ship of Mun Bon Reservoir, pp. 55-64
19 
Ryu G., Chung G., Lee J.H., Kim J.H., 2009, Optimization of Multi-reservoir Operation with a Hedging Rule: Case Study of the Han River Basin, Journal of Korea Water Resources Association, Vol. 42, No. 8, pp. 643-667DOI
20 
Sugawara M., 1972, Method of Rainfall-runoff Analysis, Kyouritsu Shuppan Co., Ltd.
21 
Srivastava D.K., Awchi T.A., 2009, Storage-Yield Evaluation and Operation of Mula Reservoir India, Journal of Water Resources Planning and Management, Vol. 135, No. 6, pp. 414-425DOI
22 
Yi J.E., Song J.W., 2002, Evaluation of Water Supply Capacity for Multi-Purpose Dam Using Optimization and Simulation Techniques, [Korean Literature], Journal of Korean Society of Civil Engineers, Vol. 22, No. 6B, pp. 811-818Google Search