• 대한전기학회
Mobile QR Code QR CODE : The Transactions of the Korean Institute of Electrical Engineers
  • COPE
  • kcse
  • 한국과학기술단체총연합회
  • 한국학술지인용색인
  • Scopus
  • crossref
  • orcid

References

1 
H. J. Kim, 2008, Current Status and Perspectives on Electric Industry Restructuring in Korea, Korean Energy Economic Review, Vol. 7, No. 2, pp. 139-159Google Search
2 
I. C. Nam, 2012, Competition Policy for the Electricity Industry of Korea, KDI research reports, 2012-02Google Search
3 
C. H. Cho, 2002, Choice of Electricity Trading System and Electricity Trading Methods in Competitive Electricity Market: Economic Analysis of Electricity Trading Based on Transaction Costs Theory, Auction Theory and Price Competition Theory, Journal of Regulation Studies, Vol. 11, No. 2, pp. 87-128Google Search
4 
Y. S. Ma, K. D. Lee, H. J. Kim, Y. S. Lee, C. K. Park, 2012, A Study on Development Plan of Electricity Industry as a Change in Business Type of Electricity Market, Ministry of Knowledge EconomyGoogle Search
5 
C. H. Cho, 2007, Some Thoughts on the Operation System of the Electricity Markets, Journal of Regulation Studies, Vol. 16, No. 1, pp. 117-143Google Search
6 
D. W. Kim, K. I. Kim, S. B. Cho, W. J. Choi, 2015, A Study on Improving Capacity Payments in the Korean Electricity Market, Korean Energy Economic Review, Vol. 14, No. 3, pp. 293-318Google Search
7 
Y. S. Kim, 2016, Dual Capacity Price Mechanism to Provide Stable Remuneration for Generation Capacity, Environmental and Resource Economics Review, Vol. 25, No. 1, pp. 113-140DOI
8 
D. W. Kim, J. H. Kim, W. J. Choi, 2017, Price Bidding and Vertical Contract: Evidence from the Korean Electricity Market, Journal of Korean Economy Studies, Vol. 35, No. 1, pp. 101-123Google Search
9 
MoTIE (Ministry of Trade, Industry and Energy), 2017, The 8th Basic Plan for Long-term Power Supply and Demand (2017~2031)Google Search
10 
KECO (Korea Environment Corporation), 2020, Annual Air Quality Alerts, (https://www.airkorea.or.kr/web/pmWarn ing?pMENU_NO=115)Google Search
11 
MoE (Ministry of Environment), 2017, Comprehensive countermeasures for PM, MoE policy reports, 2017-26Google Search
12 
Y. S. Park, 2018, The 8th power supply and demand plan ... Reduction of 6 nuclear power plants and 4 coals: Expansion of LNG and pumping power generation as a renewable energy backup facility - Electricity rate hike is minimal - Average level of 1% per year since 2022, Electric Power, Vol. 12, No. 1, pp. 12-15Google Search
13 
S. H. Lee, 2018, The direction of research and adaptation measures in the field of health after the announcement of the comprehensive countermeasures for 9.26 fine dust management, Health & Welfare Issue & Focus, Vol. 346, pp. 1-8Google Search
14 
S. H. Bae, 2018, Contributing to the activation of the local economy through stable power supply: Minimization of sulfur oxides and dust - Maximize recycling of wastewater - Pledge to construct follow-up units by utilizing power plant infrastructure, Electric Power, Vol. 12, No. 8, pp. 12-17Google Search
15 
S. H. Bae, 2019, Starting from April 1, LNG import levy cut for power generation: Passed the Enforcement Decree of the Oil and Petroleum Alternative Fuel Business Act _ Cut LNG import levy per kg to 3.8 won, Electric Power, Vol. 13, No. 4, pp. 64-64Google Search
16 
S. J. Cho, K. S. Park, 2019, A study on how to reform taxes to achieve energy conversion in the power generation sector, Korean Energy Research Institute Basic Research Report. 18-07Google Search
17 
S. R. Lee, Y. S. Cho, S. K. Lee, 2017, Analysis of CO2 Reduction effected by GHG Energy Target Management System (TMS) and Korean Emissions Trading Scheme (ETS), Journal of Climate Change Research, Vol. 8, No. 3, pp. 221-230Google Search
18 
J. H. Kim, 2019, Constructing Topographies of EMF Risks from Underground Power Lines, Korean Association of Science and Technology Studies, Vol. 19, No. 3, pp. 119-167Google Search
19 
C. H. Lee, 2017, The role and expansion plan of distributed power supply in the basic plan for power supply and demand, Korea Electric Association, Vol. 491, pp. 28-34Google Search
20 
J. H. Ha, 2019, A study on the management performance of operating status of electric power market and civil LNG power plant, International Association of Asian Studies, pp. 1-20Google Search
21 
Y. S. Park, 2016, LNG power generation and performance slowdown this year from last year Still: First quarter of this year, power management company's management performance shifted to LNG - Expanded profits of private power companies with a high proportion of LNG, Electric Power, Vol. 10, No. 8, pp. 48-49Google Search
22 
D. W. Kim, K. I. Kim, S. B. Cho, W. J. Choi, 2015, A study on Improving Capacity Payments in the Korean Electricity Market, KEEI, Vol. 14, No. 3, pp. 293-318Google Search
23 
J. Y. Lee, 2020, Be fully committed to the safe management and operation of Oseong Natural Gas Power Plant: CEO's field-oriented management - Powerful management of power plants - Safety-oriented tasks, Electric Power, Vol. 14, No. 1, pp. 68-71Google Search
24 
Y. K. Park, J. H. Noh, D. H. Lee, J. B. Park, 2019, Transmission Congestion Relief Benefits of CHP Located in the Metropolitan Area in Korea Electricity Market, The Korean institute of Electrical Engineers, Vol. 68, No. 5, pp. 605-613DOI
25 
H. S. Kim, 2017, A Study to Establish the Standard Capacity Price Calculation Standard for New Reference Generators, Korea Electric Power ExchangeGoogle Search
26 
Ministry of Economy and Finance, 2019, ’19~’23 Mid-to-long Financial Management Plans for Public InstitutionsGoogle Search
27 
M. Y. Kim, S. B. Cho, 2014, The Influence of Excluding No-load Cost from SMP on Cost Reduction Incentive of Generators, Korea Environmental Economics Association, Vol. 23, No. 4, pp. 617-641DOI
28 
D. W. Kim, J. H. Kim, W. J. Choi, 2017, Price Bidding and Vertical Contract: Evidence from the Korean Electricity Market, Journal of Korean Economy Studies, Vol. 35, No. 1, pp. 101-123Google Search
29 
M. Y. Kim, S. B. Cho, 2014, The Influence of Excluding No-load Cost from SMP on Cost Reduction Incentive of Generators, Environmental and Resource Economics Review, Vol. 23, No. 4, pp. 617-641DOI
30 
Y. S. Kim, K. H. Wang, 2003, A study on the determination of the wholesale price in Korean electricity market, The Korean Journal of Industrial Organization, Vol. 11, No. 1, pp. 93-122Google Search
31 
M. H. Ryu, 2013, A study on strategy of K-water based on electronic market circumstance change, K-Water reports, 0-0Google Search
32 
M. S. Kim, 2015, A study on the impact analysis of introducing emission trading system on CBP market and policy implications, The Transactions of the Korean Institute of Electrical Engineers, Vol. 64, No. 5, pp. 667-679DOI
33 
I. H. Kim, 2015, How to improve international viability of electricity industry by electricity restructuring based on reasonable pricing. International Trade Law, Vol. 121, pp. 12-50Google Search
34 
K. W. Ohn, 2019, Background and status of the introduction of the variable cost market, Journal of Electrical World Monthly Magazine, pp. 23-29Google Search
35 
G. Shieh, 2011, Clarifying the role of mean centring in multicollinearity of interaction effects, British Journal of Mathematical and Statistical Psychology, Vol. 64, No. 3, pp. 462-477DOI
36 
Korea Power Exchange, , Electric Power Statistics Information System (EPSIS), available at: http://epsis.kpx.or.kr/epsisnew/Google Search