• 대한전기학회
Mobile QR Code QR CODE : The Transactions of the Korean Institute of Electrical Engineers
  • COPE
  • kcse
  • 한국과학기술단체총연합회
  • 한국학술지인용색인
  • Scopus
  • crossref
  • orcid

References

1 
Incheon Transit Corporation, “Statistical Analysis of Power System Operation for Line 1 in 2024,” pp 1-10. 2024.URL
2 
Incheon Transit Corporation, “Power Demand (Peak) Management Plan for Line 1 in 2025,” pp 1-10. 2024.URL
3 
H. Singh, I. Musirin, M. M. Othman, “Power System Maximum Loadability with Generation Constraints,” Proc. of IFAC Symposium on Power Plants and Power Systems Control, Kananaskis, Canada, pp. 371-376, 2006. DOI:10.1016/B978-008046620-0/50062-1DOI
4 
M. Benidris, S. Sulaeman, Y. Tian and J. Mitra, “Reactive Power Compensation for Reliability Improvement of Power Systems,” Proc. of the North American Power Symposium (NAPS), pp. 1-5, 2012.DOI
5 
T. Van Cutsem and C. Vournas, “Voltage Stability of Electric Power Systems,” Kluwer Academic Publishers, pp. 25-57, 1998. DOI:10.1007/978-0-387-75536-6DOI
6 
B. Kalyan Kumar, “Power System Stability and Control,” Indian Institute of Technology Madras, Chennai, India, pp. 8.1-8.12, 2015.URL
7 
P. Kundur, “Power System Stability and Control,” McGraw -Hill, New York, pp. 959-1025, 1994.URL
8 
M. Pikulski, “Controlled Sources of Reactive Power Used for Improving Voltage Stability,” 10th Semester Project Report, Aalborg Univ, Denmark, pp. 11-42. Jun. 2008.URL
9 
T. Van Cutsem, “Voltage Instability : Phenomena, Countermeasures, and Analysis Methods,” Proceedings of the IEEE, vol. 88, no. 2, pp. 208-227, Feb. 2000. DOI:10.1109/5.823999DOI
10 
H. Sato, “Computation of Power System Loadability Limits,” IEEE Trans. on Power Systems, vol. 17, no. 4, pp. 1707-1711, Nov. 2002. DOI:10.1109/TDC.2002.1177711DOI
11 
CANTEACH, “Course 233, Module 8, Generator and Transmission Line Stability,” pp. 1-41. 1992.URL
12 
J. Qi, W. Zhao and X. Bian, “Comparative Study of SVC and STATCOM Reactive Power Compensation for Prosumer Microgrids With DFIG-Based Wind Farm Integration,” IEEE Access, vol. 8, pp. 1-12, 2020. DOI:10.1109/ACCESS.2020.3033058DOI
13 
V. Jesudoss, K. Balachander, A. Amudha, M. Sivaramkuma, and S. Divyapriya, “Reactive Power Compensation in a Three Phase Four Wire Distribution System Using DSTATCOM with Fuzzy Logic Controller,” J. Adv. Research in Dynamical and Control Systems, vol. 10, no. 5, pp. 1109-1127, 2018.URL
14 
NPTEL, “Chapter 10 : Compensation of Power Transmission Systems,” Power System Analysis, IIT Kanpur, pp. 180-199. 2013.URL
15 
Siti Saodah, I. M. W. Kastawan, Erwin Yusuf, B. P. Manunggal and Maryanti, “Simulation of Effects of Using Capacitor for Reactive Power (VAR) Compensation on Electrical Power Supply Quality,” Atlantis Highlights in Engineering, vol. 9, pp. 168-174, 2022. DOI:10.2991/ahe.k.220205.029DOI
16 
Mazhar Ali, “Computation of Loadability Limit in Power System based on Newton-Bisection Algorithm,” in Proceedings of the 2016 IEEE International Conference on Power and Energy (POWERCON), Wollongong, Australia, pp. 1-6, Sept. 2016. DOI: 10.1109/POWERCON.2016.7754048DOI
17 
Kuwar Yatendra, Satyendra Singh and Pushkar Tripathi, “Power System Performance Analysis with STATCOM along with Distance Protection Scheme,” Journal of Emerging Technologies and Innovative Research (JETIR), vol. 6, no. 6, pp. 1-5, June 2019.URL
18 
C. H. Hong and J. W. Lee, “A Study on Static Var Compensator Using PID Control,” Proceedings of the 2013 Autumn Conference of the Korean Society for Railway, pp. 735-739, 2013.URL
19 
K. H. Son, K. H. Choi, S. I. Kim and H. S. Jung, “A Study on Voltage Unbalance Compensation Using SVC in Electric Railway Power Supply Systems,” Proceedings of the 2011 Autumn Conference of the Korean Society for Railway, pp. 3124-3132, 2011.URL
20 
K. H. Jeon, H. J. Kim, H. W. Lee and B. G. Lee, “Application of SVC (TSC+TCR) and Verification of Automatic Control Algorithm Based on RTDS HILS Test for Voltage and Power Factor Compensation in Railway Power Supply Systems,” Journal of the Korean Society for Railway, vol. 25, no. 10, pp. 694-702, 2022. DOI:10.7782/JKSR.2022.25.10.694DOI
21 
J. H. Kim, D. Y. Lee and K. H. Son, “Voltage Drop Compensation in Electric Railway Power Supply Systems Using SVC,” The Transactions of the Korean Institute of Electrical Engineers, vol. 58, no. 1, pp. 11-17, 2009.URL
22 
Lee, J.-K., Oh, J.-K. & Kim, J.-O., “A Study on System Stability Improvement of Power System with High Speed Electric Railway Using STATCOM,” Journal of the Korean Institute of Electrical Engineers, vol. 52A, no. 11, pp. 625-631, 2003.URL
23 
B. H. Lee and J. M. Baek, “A Study on a New Power Flow Method for Analysis of AC Electric Railway System and Improvement of Voltage Drop Using a STATCOM,” Journal of the Korean Institute of Electrical Engineers, vol. 56, no. 4, pp. 669-676, 2007.URL
24 
Incheon Metropolitan City Urban Railroad Construction Headquarters, “Design Calculation Report for Transmission and Distribution Facilities of Incheon Subway Line 1,” pp. 2-130, 1996.URL
25 
Incheon Transit Corporation, “Textbook for Railway Job Training in the Electrical Field: Overview of Power Facilities,” pp. 41-102, 2022.URL
26 
Incheon Transit Corporation, “Operation Manual for Electrical Equipment Maintenance,” pp. 1-228, 2025.URL