• 대한전기학회
Mobile QR Code QR CODE : The Transactions of the Korean Institute of Electrical Engineers
  • COPE
  • kcse
  • 한국과학기술단체총연합회
  • 한국학술지인용색인
  • Scopus
  • crossref
  • orcid

References

1 
2025, Energy and AIGoogle Search
2 
2024, Uptime Institute Global Data Center Survey Results 2024Google Search
3 
D. Bizo, 2025, Density choices for AI training are increasingly complexGoogle Search
4 
2025, The 11th Basic Plan for Electricity Supply and Demand (2024–2038)Google Search
5 
2024, Enforcement Decree of the Special Act on Promotion of Distributed Energy (Article 25)Google Search
6 
2025, Explanation on preventing avoidance of power system impact assessment for data centers through contract splittingGoogle Search
7 
2025, Mainland generation curtailment forecast notice (non-central dispatch generators)Google Search
8 
2023, Data Center Metropolitan Area Concentration Mitigation PlanGoogle Search
9 
2023, A 3-GW data center complex to be built in Solaseado, HaenamGoogle Search
10 
J. M. Carrión, J. M. Arroyo, 2006, A computationally efficient mixed-integer linear formulation for the thermal unit commitment problem, IEEE Transactions on Power Systems, Vol. 21, No. 3, pp. 1371-1378DOI
11 
V. Morales-España, J. M. Latorre, A. Ramos, 2013, Tight and compact MILP formulation for the unit commitment problem, IEEE Transactions on Power Systems, Vol. 28, No. 4, pp. 4897-4908DOI
12 
S. Papavasiliou, S. S. Oren, 2014, Large-scale integration of deferrable demand and renewable energy sources, IEEE Transactions on Power Systems, Vol. 29, No. 1, pp. 489-499DOI
13 
A. Qureshi, R. Weber, H. Balakrishnan, J. Guttag, B. Maggs, 2009, Cutting the electric bill for internet-scale systems, pp. 303-314Google Search
14 
J. Zheng, A. A. Chien, S. Suh, 2020, Mitigating curtailment and carbon emissions through load migration between data centers, Joule, Vol. 4, No. 10, pp. 2208-2222DOI
15 
A. Govil, E. Riva, M. Moshirpour, A. Ghosh, S. Anand, 2025, AI Load Dynamics—A Power Electronics Perspective, arXiv preprint arXiv:2502.11337Google Search
16 
E. Choukse, B. Warrier, S. Health, 2025, Power Stabilization for AI Training Datacenters, arXiv preprint arXiv:2508.14318Google Search
17 
E. J. Choi, J. W. Lee, D. Kim, G. -S. Seo, S. W. Kim, 2024, Quantifying Benefit of Well-Located Distributed Energy Resources, IEEE Transactions on Energy Markets, Policy and Regulation, Vol. 2, No. 1, pp. 92-106DOI
18 
J. H. Shin, Y. H. Kwon, J. H. Kim, D. Kim, 2024, Investigating the Impact of Interconnection Line Power Losses on Unit Commitment of Grid-Connected Microgrids, The transactions of The Korean Institute of Electrical Engineers, Vol. 73, No. 7, pp. 1127-1136DOI
19 
K. Kwon, D. Kim, 2020, Enhanced method for considering energy storage systems as ancillary service resources in stochastic unit commitment, Energy, Vol. 213DOI
20 
2024, The 11th Long-Term Transmission and Substation Facilities PlanGoogle Search
21 
2024, Renewable Energy Supply StatisticsGoogle Search
22 
2024, Announcement of the 2024 Second-Half Competitive Bidding for Fixed-Price Contracts for PhotovoltaicsGoogle Search
23 
2025, FERC Electric Tariff Modules, Module A—Common Tariff Provisions 30.0.0Google Search
24 
A. Shehabi, A. Newkirk, S. J. Smith, 2016, 2024 United states data center energy usage reportGoogle Search
25 
D. Al Kez, 2020, Manipulation of Static and Dynamic Data Center Power Responses to Support Grid Operations, IEEE Access, Vol. 8, pp. 182078-182091DOI
26 
J. Mohan, A. Phanishayee, V. Chidambaram, 2021, CheckFreq: Frequent, Fine-Grained DNN Checkpointing, pp. 203-216Google Search